Tiza Group

Home / Tools / Function 32 reverse power

Function 32: generator reverse power

Generator motoring: reverse power, delay, sequential trip with the stop valve closed, the relay inside and a test-set test plan.

IEEE C37.102§ 4.5.5.3reverse powerSEL-700G§ p. 43tolerancesIEEE C37.2§ 2008function numbers

Example cases
Function 32: generator reverse power

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
% of Sn

Below the power the machine draws when motoring; IEEE C37.102-2006 §4.5.5.3 gives 0.5 % to 3 % for steam turbines.

s

IEEE C37.102-2006 §4.5.5.3: up to 60 s, typically 30 s for steam, so it does not trip on power swings or while synchronizing.

s

Sequential-trip stage: with the valve closed the relay trips sooner. IEEE C37.102-2006 §7.2.2.4.1 typically recommends 1 s to 3 s.

A
E3Simulation
% of Sn

Negative: the machine draws power from the grid and motors.

% of Sn

Its contact enters through BI3 and enables the fast stage.

E4Installation and test set
V
A

Only to show the primary values.

A

Example value: enter that of your test set. Points that exceed it are marked.

V

Example value: enter that of your test set.

E5Relay tolerances
%
% of In
%
cycles
cycles

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Pickup power

—

Test plan

—

From the primary to the relay and the trip coil
  • Power
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 32 protects the turbine, not the generator: when the turbine stops driving, the machine stays on the grid as a synchronous motor and draws active power. In a steam turbine this heats the blades by friction with the steam; in a diesel engine there may be unburned fuel.

The power the machine draws when motoring depends on the turbine: it is large for a gas turbine and very small for a steam turbine or a hydro unit with the blades out of the water. The setting goes below that power.

How it operates

  • The relay calculates the three-phase power from the VT voltages and the CT currents and picks up when the power flowing into the machine exceeds the setting.
  • It always has a delay, so it does not trip on power swings or during synchronizing.
  • In sequential tripping the turbine stops first and the 32 opens the breaker afterwards; with the stop valve closed a second stage trips with a short delay.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The test set injects balanced nominal voltages and currents at an angle of 180°: all the power is then active and negative. The pickup is searched by raising the current in small steps.

Times are measured at twice the pickup; a point with a lot of reactive power checks the measurement at low power factor and another with power toward the grid checks that it does not operate. The fast stage is tested with test-set output 3 on BI3.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The declared tolerance holds at unity power factor; at low power factor the angle error of the CT and the VT weighs more and is not modelled.
  • The relay pickup time, under 10 cycles according to the cited data sheet, is added as an estimate to the upper limit of the times.
  • The motoring power of your turbine comes from its manufacturer: the ranges in IEEE C37.102 are a guide.

Frequently asked questions

Why is the setting so low?

Because a steam turbine with no steam needs very little power to keep turning: between 0.5 % and 3 % of the rating according to IEEE C37.102-2006 §4.5.5.3. A higher setting would not detect it.

Why does the 32 have such a long delay?

Because during a power swing or while synchronizing the power can be negative for a moment. The cited guide speaks of up to 60 s, typically 30 s for steam; the exact time depends on how long the turbine withstands motoring.

How is reverse power injected with the test set?

With balanced voltages at 0°, −120° and 120° and the currents shifted 180° from their voltage. With 115 V line to line and 0.2 A per phase the power is −√3·115·0.2 = −39.8 W.

Related guides

Other tools

All tools
WhatsApp