Power cable tests
Pick the test, check on the drawing how the test kit is connected and type your results: the tool compares them with the open criteria of NEETRAC (CDFI) and Horizon Power, locates the partial discharge along the cable and builds the plan with the results sheet.
NEETRAC CDFI II§ 6VLF tan δNEETRAC CDFI II§ 7.3.2discharge locationNEETRAC CDFI II§ 9VLF withstand testHorizon Power HPC-4DL-07-0005-2014§ 5, 8oversheath and VLF
Results
—
—
—
— kV
— ×10⁻³
— ×10⁻³
—
—
— m
— kV
— MΩ
—
—
Charts
- Source
- Measuring
- Earth
- This test
- Previous test
How it was calculated and standards
Plan and results
| Test | Point | Expected | Measured | Status | Change | Source |
|---|
Step-by-step calculation
What it is for
A shielded medium or high voltage cable is tested in the field with four tests: VLF withstand, VLF tan delta, partial discharge and the oversheath test. This tool draws the cable with its layers, terminations and screen, shows how the test kit is connected in each test and flags a wrong lead or bond as a failure. It then compares your results with published criteria and builds the test plan with the results sheet.
How it is calculated
NEETRAC CDFI II§ 9withstand test
VLF withstand test
U0 = U / √3 · times U0 = Uapplied / U0 · cycles = f × tVoltage and duration are compared with the chosen reference. It passes if the cable withstands without breakdown and without signs of distress: excessive power to energize, audible arcing or discharge, or any other unusual observation (CDFI phase II, table 6 of ch. 9). For a sine wave the peak is √2 times the rms value; for cosine-rectangular they are equal.
NEETRAC CDFI II§ 6tan δ
VLF tan delta
tip-up = TD1.5U0 − TD0.5U0 · TuTu = (TD1.5U0 − TDU0) − (TDU0 − TD0.5U0)Each feature (stability at U0, tip-up, tip-up of the tip-up and mean at U0) falls in one of three classes set by the 80th and 95th percentiles of the cables measured by CDFI. The cable's class is the worst one. In paper (PILC) the tip-up can be negative and has a band on each side.
NEETRAC CDFI II§ 7.3.2.1location
Location of the discharge
v = VoP × c · x = L − v · Δt / 2The direct pulse reaches the near end first; the one travelling to the open far end is reflected and arrives Δt later. x is the distance from the near end.
Horizon Power HPC-4DL-07-0005-2014§ 5oversheath
Oversheath test
UDC = min(4 kV/mm × e; 10 kV) · Rmin = R1000 m × 1000 / LThe DC voltage per millimetre of oversheath is the IEC 60229 value quoted by Prysmian (estimate). The minimum resistance at 1 kV is Horizon Power's for new HDPE oversheaths on 22 and 33 kV cables, which falls in inverse proportion to the length; for PVC it is 1 MΩ.
Limits of the calculation
- IEEE 400, 400.2 and 400.3, IEC 60270, IEC 60229, IEC 60840 and IEC 62067 are paid standards and were not consulted. Values that the CDFI report or an open paper attributes to them are marked as estimates.
- The CDFI tan δ criteria come from the population of cables measured in North America: they are a guide to set priorities, not an approval. Those for new cable are provisional.
- There is no public picocoulomb limit for medium voltage cables in the field: the magnitude is only judged against the limit you type. Inception and extinction voltages are reported against U0.
- The minimum oversheath resistance applies to new 22 and 33 kV cables; otherwise it is only a reference. The duration of the DC oversheath test is your data.
- The drawing shows one phase. It is an aid to interpretation and does not replace the test-set manufacturer's procedure or the judgement of the person responsible for the cable.
Frequently asked questions
What voltage is applied in a maintenance VLF test?
For 5 to 35 kV cables, NEETRAC's CDFI report gives the values it attributes to IEEE 400.2-2013 (cl. 5.1): for example 16 kV rms sine for a 15 kV cable, for 30 min. The tool marks them as estimates because the standard was not consulted. If your specification gives another value, type it as your own data.
When does a tan δ result call for action?
CDFI grades four features (stability, tip-up, tip-up of the tip-up and mean at U0) in three classes based on the population of cables measured: no action required, further study advised and action required. The cable's class is the worst of the four.
Is there a picocoulomb limit for a medium voltage cable in the field?
There is no public one. CDFI explains that partial discharge providers' criteria are proprietary and that magnitude and inception voltage alone do not predict failure well. Type the limit of your specification or provider and the tool judges it.
Why are the screen bonds removed in the oversheath test?
Because the voltage is applied between the metallic screen and earth: with the screen earthed the source would be shorted and the oversheath would not be tested.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws
