PCB equipment: classification and deadlines
Enter each piece of equipment with its PCB content and the basis of the classification (analysis, certificate, nameplate or none). The tool puts it in its group, says how to mark it and checks, on the evaluation date, the marking, the withdrawal from use, the elimination and the inventory required by Colombian environmental regulation.
Res. MinAmbiente 222 de 2011§ arts. 7, 8, 9, 16, 23, 27, 30 and 34groups, marking, inventory and deadlines of PCB equipmentRes. MinAmbiente 1741 de 2016§ arts. 2, 4, 5 and 10PCB-free nameplate, 2025 and 2028 deadlines and refilling ban
Results
—
—
—
—
Charts
- In use
- Out of use or discarded
How it was calculated and standards
Classification and deadlines per piece of equipment
| Code | Group | Marked | Withdrawal from use | Elimination | Note |
|---|
What it is for
To know which group each transformer, capacitor or oil circuit breaker belongs to, how it must be marked and whether it meets the deadlines of Colombian environmental regulation: withdrawal from use by 2025, elimination by 2028 and a yearly inventory.
PCBs (polychlorinated biphenyls) were used in insulating oils until the 1980s. In Colombia they are regulated by Resolution 222 of 2011 of the Ministry of Environment, modified by Resolution 1741 of 2016, under the Stockholm Convention.
What is calculated
Source: Res. 222 of 2011, article 7
Groups by PCB content
Group 1 ≥ 100 000 ppm · Group 2 ≥ 500 ppm · Group 3 ≥ 50 ppm · Group 4 < 50 ppmGroup 4 (NO PCB) requires a quantitative analysis or the manufacturer's certificate with no intervention; new equipment can prove it with its PCB-free nameplate. Sealed capacitors of 5 L or less made in the USA before 1979, or elsewhere before 1986, are presumed group 1.
Source: Res. 222 of 2011, articles 9 and 27; Res. 1741 of 2016, article 4
Deadlines
100 % of the inventory marked by 31 December 2024. No PCB equipment in use after 31 December 2025. Elimination of every stock before 31 December 2028. Inventory: every year, before 30 June, the previous year is filed.
Limits
- It does not compute the size of a stratified random sample: if you classify by sampling, enter for each piece of equipment the highest concentration of its stratum.
- It does not check transport, the technical storage requirements or hazardous-waste management under other rules. A later act could change the deadlines: confirm them with your environmental authority.
- The example cases are illustrative.
Frequently asked questions
When is a transformer «NO PCB»?
When a quantitative analysis gives less than 50 ppm, or when it has the manufacturer's certificate that it was made without PCB and it has never been opened or serviced. New equipment without a certificate can prove it with a nameplate that says PCB-free.
Is a chloride or field test enough?
The semi-quantitative analysis is valid to classify into groups 2 and 3, but not to declare equipment NO PCB. Qualitative analysis is not accepted to identify or to classify.
What if I still have PCB equipment in use?
Since 31 December 2025 no PCB equipment may be in use in Colombia, and every stock must be eliminated before 31 December 2028 through an authorised waste manager. Equipment in use with 50 ppm or more is already past the deadline.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws