Home / Tools / Calibration and uncertainty
Calibration and measurement uncertainty
Type the readings of the instrument, the value of the standard, its certificate, the resolution and the tolerance: the tool builds the uncertainty budget, calculates k from the effective degrees of freedom and the expanded uncertainty, and decides pass or fail with simple acceptance or with a guard band.
JCGM 100:2008§ 4.2, 4.3, 5.1.2, G.4GUM: measurement uncertaintyEA-4/02 M:2022§ S9.7, anexo Euncertainty in calibrationILAC-G8:09/2019§ 4.2decision rulesJCGM 106:2012§ 7.6, 8.3.2probability of conformanceNASA-HDBK-8739.19-4§ 3-28test uncertainty ratio
Results
—
—
—
—
—
—
—
—
—
—
— %
Charts
How it was calculated and standards
Budget as a table
Step-by-step calculation
Result not what you expected? We check it with you on site.
What it is for
When you calibrate an instrument against a standard, the error alone is not enough: you need to know how far you can trust it. This tool builds the uncertainty budget of one calibration point from the repeated readings (type A), the certificate of the standard, the resolution and one extra limit (type B), and calculates the expanded uncertainty with the coverage factor k that matches the degrees of freedom.
With the tolerance of the instrument it decides pass or fail, with simple acceptance or with a guard band, and shows the probability of conformance and the ratio between tolerance and uncertainty. It works for voltmeters, clamp meters, pressure gauges, temperature indicators, insulation testers and any instrument compared with a standard at one point.
How it is calculated
JCGM 100:2008§ 4.2.2-4.2.3type A
Repeatability: type A
uA = s / √n · ν = n − 1s is the experimental standard deviation of the n readings. Halving uA takes four times as many readings.
JCGM 100:2008§ 4.3.3, 4.3.7, 4.3.9type B EA-4/02 M:2022§ S9.7resolution
What does not repeat: type B
ucert = U/k · ures = (res/2)/√3 · ulim = a/√3, a/√6 or a/√2The certificate is divided by its own k, not by √3. The resolution and limits with no known distribution are treated as rectangular; the triangular and U-shaped distributions are used when the value is known to gather at the centre or at the ends. Type B sources enter with infinite degrees of freedom.
JCGM 100:2008§ 5.1.2, G.4.1uc and νeff
Combined uncertainty and effective degrees of freedom
uc2 = Σ (ci·ui)2 · νeff = uc4 / Σ (ci·ui)4/νiThe sources are added in quadrature (no correlation, ci = 1). νeff comes from the Welch-Satterthwaite formula and is truncated to the next lower integer before looking up k.
JCGM 100:2008§ 6.2.1, G.3, 7.2.6U and rounding EA-4/02 M:2022§ Annex Ek factor
Expanded uncertainty
U = k · uc · k = t95.45 %(ν)k is the Student t factor for a coverage of 95.45 % with the truncated degrees of freedom; with many degrees it equals 2. U is reported with two significant digits and the error with the same decimals.
ILAC-G8:09/2019§ 4.2decision rule JCGM 106:2012§ 8.3.2acceptance limit
Decision with a guard band
AU = TU − w · AL = TL + w · w = U (guard band) or 0 (simple)The result passes if the error lies between AL and AU; otherwise it fails. With a guard band, an error inside the tolerance but closer than U to the limit fails. With simple acceptance, the risk of accepting an out-of-tolerance instrument at the limit can reach 50 % and is shared with the customer.
JCGM 106:2012§ eq. (4) and (6)probability of conformance NASA-HDBK-8739.19-4§ 3-28TUR
Probability of conformance and TUR
pc = Φ((TU − E)/uc) − Φ((TL − E)/uc) · TUR = T / Upc assumes a normal distribution around the error E: with few degrees of freedom it is optimistic. TUR is the half-width of the tolerance divided by U; the 4 to 1 reference is a convention of ANSI/NCSL Z540.3 (not consulted), not an acceptance criterion.
Limits of the calculation
- One calibration point and one measurand with the same unit across the budget: the sensitivity coefficients are 1 and there is no correlation between sources.
- The sources are the readings, the certificate, the resolution and one extra limit. Drift of the standard, temperature, load or wiring enter through that limit if you estimate them.
- The probability of conformance uses a normal distribution with uc; with few degrees of freedom the real one has wider tails and the probability is lower than shown.
- It does not calculate the global consumer or producer risk (JCGM 106:2012, 9.5) or guard bands other than w = U.
- You set the tolerance and the decision rule (manufacturer specification, instrument standard or agreement with the customer). The tool does not replace the certificate of an accredited laboratory.
Frequently asked questions
Why is the coverage factor k not always 2?
k = 2 gives a coverage close to 95 % only when the combined uncertainty has many degrees of freedom. If repeatability weighs a lot and few readings were taken, the GUM (JCGM 100:2008, G.4) calculates the effective degrees of freedom with the Welch-Satterthwaite formula, truncates them to the next lower integer and takes k from the Student t factor for 95.45 %. With five dominant readings k can exceed 2.5; with three, 3. Reporting k = 2 in that case underestimates the uncertainty.
What is a guard band and when is it used?
It is a margin w subtracted on each side of the tolerance to obtain the acceptance limits. ILAC-G8:09/2019 describes the rule with w = U: the result passes only if the error is more than U away from the limit. The risk of declaring an out-of-tolerance instrument conforming then stays below 2.5 % at the limit. With simple acceptance (w = 0) that risk can reach 50 % and is shared with the customer. The rule is agreed with the customer before calibrating.
Is the 4 to 1 ratio between tolerance and uncertainty mandatory?
Not in the sources the tool uses. The test uncertainty ratio (TUR) is the half-width of the tolerance divided by U (NASA-HDBK-8739.19-4). The figure of 4 to 1 comes from ANSI/NCSL Z540.3, a paid standard that was not consulted, and JCGM 106:2012 (7.6) warns that this ratio is often ill defined. The tool shows it as a reference: what decides is the agreed decision rule.
We test your equipment on site
We carry out the electrical tests of transformers, protection systems and switchyard equipment, and deliver the record of each test with its results.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistancePCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws
