Harmonic emission of equipment up to 16 A (IEC 61000-3-2)

Choose the type of equipment and simulate its input stage or type the measured spectrum: the tool classifies it, works out the limits of its class and marks order by order whether it complies, is disregarded or exceeds, with the reconstructed current wave.

IEC 61000-3-2:2014§ 5classificationIEC 61000-3-2:2014§ 6.2.3.4, 7limits per class

Example cases
Harmonic emission of equipment up to 16 A (IEC 61000-3-2)

Only the basic data; the rest is taken with typical values.

ALearn

E1Equipment

Sets the class under clause 5.

W

The rated one: it decides the exemptions of clause 7.

W

The one measured in the test: it sets the per-watt limits.

V
E2Current spectrum
µF
mH

Includes the supply inductance. More choke, a wider pulse and fewer harmonics.

Measured harmonics

One row per order, 1 to 40: rms current and, if you have it, its phase relative to the voltage.

RowOrderCurrentAPhase°Remove

A

Use a decimal point. The calculation runs in your browser and updates as you type.

Equipment class

—

Result against IEC 61000-3-2

—

Most loaded order

—

Current THD and power factor

—

Equipment, current wave and harmonics
Top: the equipment with its input stage connected to the supply and the harmonic current it sends back. Bottom: the reconstructed current and the current of each order with its limit in yellow.
Current of each order over its limit
Each bar is the current of the order divided by its limit. Above 100 % it exceeds; for odd orders 21 to 39 up to 150 % is accepted if the partial odd harmonic current complies.
Limits of the four classes at this power
  • Class A
  • Class B
  • Class D
  • Class C
For comparison: the limits this same equipment would have in each class. Class D and lighting of 25 W or less depend on the power; class C on the fundamental current.

Result per order

OrderCurrentLimitRatioStatus

What it is for

Before taking equipment to a test, or when choosing it, it pays to know whether its harmonic current fits the limits of IEC 61000-3-2. The tool classifies the equipment, works out the limits of its class and compares them order by order with the spectrum you measure or simulate.

The rectifier simulator shows why a power supply without a filter fails and how much an input choke helps, before going to an active power factor corrector.

How it is calculated

IEC 61000-3-2:2014§ 5, 7classes and limits

Limit of each order by class

A: Table 1 · B: 1.5 × Table 1 · C (> 25 W): % of I1, with 30·λ % for the 3rd · D: min(mA/W × P; Table 1)

In class D and in discharge lighting of 25 W or less the limit is proportional to the measured active power. Small discharge lighting also complies if the 3rd stays within 86 % and the 5th within 61 % of the fundamental and the wave meets the 60°, 65° and 90° angles.

IEC 61000-3-2:2014§ 6.2.3.4application of the limits

Harmonics that are disregarded and allowance of the high orders

In < max(0.006·Iinput; 5 mA) → disregarded · IPOHC = √(Σ In², n = 21, 23 … 39)

If the partial odd harmonic current you measure stays within the one calculated from the limits, each odd order 21 to 39 may reach 150 % of its limit.

Reconstructed wave and rectifier model

i(θ) = Σ √2·In·sin(nθ + φn) · THD = √(Σ In², n = 2 … 40)/I1

The model solves the diode bridge with its capacitor and input choke in time until the cycle repeats, and takes the harmonics from the Fourier series.

Limits of the calculation

  • The 2014 edition of IEC 61000-3-2 is used. The 2017 amendment and the 2018 edition were not reviewed.
  • The standard compares averages over the whole observation period and limits each 1.5 s value to 150 % of the limit. With a single spectrum the tool compares that spectrum as if it were the average.
  • The waveform test is checked on the wave reconstructed with the phases you type; without phases the wave is only a guide.
  • For lighting of 25 W or less that is not discharge lighting, the 2014 edition gives no rule in 7.3 b): the tool warns and gives no verdict.
  • Below 220 V line-to-neutral, as in 120 V networks, the standard does not set limits yet: the comparison is only a guide.

Frequently asked questions

Which equipment does IEC 61000-3-2 cover?

Electrical and electronic equipment up to 16 A per phase connected to the public low-voltage network. Above 16 A, IEC 61000-3-12 applies. The 2014 edition does not set limits yet for networks below 220 V line-to-neutral.

How do I know whether my equipment is class A, B, C or D?

By its type. Class B is for portable tools and non-professional welders, C for lighting and D for computers, monitors, TV sets and refrigerators with drives up to 600 W. Anything not in B, C or D is class A.

Which harmonics are disregarded?

Those below 0.6 % of the input current or below 5 mA, whichever is greater. Also, for odd orders 21 to 39 the average may exceed the limit by up to 50 % if the partial odd harmonic current you measure stays within the one calculated from the limits.