Substation grounding system tests

Choose the test, connect the leads of the earth tester or the micro-ohmmeter on the drawing and type your readings: the tool checks the connection, places the potential probe, judges the plateau, scales the step and touch voltages to the fault and compares each result with its source.

MIL-HDBK-419A§ 2.7.2fall of potentialMIL-HDBK-419A§ 2.4.2.2resistivityMIL-HDBK-419A§ 7.3jointsTM 5-690§ 3-3 egrounding system tests

Example cases
Substation grounding system tests

Only the basic data; the rest is taken with typical values.

ALearn

E1Grid and distances
m

From the point where lead C1 connects to the grid.

m
m²

For the equivalent radius √(A/π). Optional.

m
E2Fall-of-potential readings
Fall-of-potential curve

One row per potential-probe position: its distance to the connection point and the resistance you read.

RowDistance xmResistanceΩRemove

m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
%

Your value: allowed difference between the central reading and those at ±10 % of D.

Ω

Your value, from the design or the specification. Optional.

E3Soil resistivity
Wenner readings

One row per probe spacing a and the resistance R you read.

RowSpacing amResistance RΩRemove

m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Ω
m
Schlumberger readings

One row per position: half the distance between the current probes AB/2, half the distance between the potential probes MN/2 and the resistance.

RowAB/2mMN/2mResistance RΩRemove

m
m
Ω
m
m
Ω
m
m
Ω
m
m
Ω
m
m
Ω
m
m
Ω
E4Injection and person
A
A

The part of the fault current the grid drains to remote earth, from the study.

m
Ω·m
Ω·m
m
s
E5Measured points
Voltages measured with It

One row per point: whether it is step or touch and the voltage you read with the test current.

RowTypeMeasured voltageVRemove

V
V
V
V
V
V
E6Continuity
A
mΩ

Empty: 5 mΩ as an estimate (MIL-HDBK-419A).

Your value: flags a point above that multiple of the median of the others. Optional.

Continuity points

One row per piece of equipment: its name, the resistance to the reference and that of the previous test.

RowEquipmentResistancemΩPreviousmΩRemove

mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
E7Test set connection

Each lead goes to one place. A misplaced lead turns red on the drawing and the test is not valid.

E8Previous test
Ω
Ω·m
%

Your value. Compare measurements from the same season of the year.

Use a decimal point. The calculation runs in your browser and updates as you type.

Grid resistance

—

Plateau of the curve

—

Average resistivity

—

Worst step or touch point

—

Highest continuity resistance

—

Test set connection

—

Fall of potential on the grid
  • Readings
  • Hemisphere model
C1 and C2 drive the current between the grid and the far probe; P1 and P2 measure the voltage between the grid and the potential probe. The curve marks the corrected position and the readings at ±10 % of the distance.
Soil resistivity
  • Measured
  • Two layers
The outer probes inject the current and the inner ones measure the voltage. Measure away from the grid and from buried pipes.
Step and touch with injected current
  • Scaled to IG
  • Tolerable
The current leaves through the grid and returns through the remote electrode. P1 and P2 take the voltage between hand and foot, or between two feet 1 m apart.
Continuity between the equipment and the grid
  • Measured
  • Limit
I+ and I− drive the current; U+ and U− measure the drop inside the section, which is why the voltage leads go inside the current leads.
Grounding system test plan
  • Result
Each row is a point of the plan. The full table, with the expected value, the source and the change from the previous test, is in the «Plan and results» sheet.

Test plan and results sheet

Each row is a point of the plan with its expected value, its source, the result of this test and the change from the previous one. It prints with the report.

TestPointExpectedMeasuredResultChangeSource

What it is for

After a grid is built, and every so often, it is measured to know whether it protects people. This tool brings together the four field measurements of a substation grounding system and draws, for each one, where every lead of the test set goes.

You type your readings. The tool checks the connection, applies the corrections, compares with the criterion and its source and builds the plan with the results sheet.

What each test measures

MIL-HDBK-419A§ 2.7.2fall of potential

Grid resistance by fall of potential

R(x) = VP1-P2/IC1-C2 · xright = 0.618·D

It is the resistance between the grid and remote earth. The current flows between the grid and probe C2; the voltage is taken between the grid and probe P2. Moving P2 gives a curve; with uniform soil, the reading at 61.8 % of the distance is the true resistance.

MIL-HDBK-419A§ 2.4.2.2four probes

Soil resistivity

Wenner: ρ = 2πaR · Schlumberger: ρ = π·[(AB/2)² − (MN/2)²]/MN · R

It is the resistance of a cube of soil one metre on a side, in Ω·m. If it changes with spacing, the soil has layers: the tool fits a two-layer model to the Wenner curve.

Metrelstep and touch

Step and touch voltages

Vfault = Vmeasured · IG/It

Touch: between a structure and the ground 1 m from it. Step: between two points of the ground 1 m apart. A known current is injected into the grid and the voltage is measured; the result is scaled to the fault current.

MIL-HDBK-419A§ 7.3joints

Continuity between equipment and grid

R = UU+ U−/II+ I−, in mΩ

It is the resistance of the copper path between the ground connection of a piece of equipment and a reference point of the grid. A high value reveals a broken ground lead or a loose or corroded connector.

Corrections

  • Connection point away from the centre: the potential probe goes to 0.618·(D + X) − X from the connection point (MIL-HDBK-419A, equation 2-50).
  • Plateau: with readings at ±10 % of the distance that agree within your tolerance, the result is the average of the three (AEMC note).
  • Wenner probe depth: with b not negligible against a, the full four-probe formula is used (MIL-HDBK-419A, equation 2-12).
  • Step and touch scaling: each reading is multiplied by I<sub>G</sub>/I<sub>t</sub>. With a 1 kΩ resistor across the terminals it is compared with the body voltage, 1000 Ω times the tolerable current.
  • Season and rain: compare with the test from the same month of the year and measure at least two full days after the last rain (TM 5-690, 3-3 e).

Criteria and sources

TestCriterionSource
Fall of potentialCurrent probe at 5 diagonals or more (90 % accuracy)MIL-HDBK-419A, table 2-6
Fall of potentialReadings at ±10 % within your toleranceAEMC; user's tolerance
Fall of potentialResistance less than or equal to the project valueUser data
ResistivityClose to uniform if max/min ≤ 1.5Tiza Group convention
Step and touchScaled voltage less than or equal to the tolerable oneGrounding tool (Dalziel)
Step and touchRemote electrode at 5 diagonals or moreMetrel
Continuity5 mΩ to the reference, unless you type another value (estimate)MIL-HDBK-419A, vol. 2, 1.13.3 f
ContinuityAbove 0.5 Ω: open or loose connection (estimate)TM 5-690, 3-3 e(6) and (7)

Limits

  • The 61.8 % rule assumes uniform soil and a grid that behaves like a hemisphere. With layers, or with shield wires and neutrals connected, the plateau may not appear.
  • Very large grids: the intersecting-curves method is not solved here; the tool warns when the probe is less than five diagonals away.
  • The tool does not filter 60 Hz noise or stray currents: the instrument does that.
  • There is no universal grid resistance value: it depends on the design and on the step and touch voltages. Type the one for your project.

Frequently asked questions

Where does the potential probe go in the fall-of-potential test?

At 61.8 % of the distance between the grid centre and the current probe, if the soil is uniform. If you connect at a point X metres from the electrical centre, the position from that point is 0.618·(D + X) − X, per MIL-HDBK-419A (2.7.2.2).

How do I know the 62 % reading is valid?

Also measure 10 % of the distance before and after that point. If the three readings are close, the result is their average; if they change a lot, the current probe is too close and must be moved farther. Type the tolerance of your procedure: the tool uses it to judge the plateau.

How far does the current probe go?

MIL-HDBK-419A estimates about 90 % accuracy with the probe at five times the grid diagonal, 95 % at ten times and 98 % at twenty-five. For very large grids it recommends measuring several curves with the probe at one to two times the longest side and finding where they intersect.

Why are step and touch voltages scaled?

Because with the same geometry the soil responds linearly: the voltage measured with a small test current grows in the same proportion up to the grid current of the fault. The tool multiplies each reading by IG/It and compares it with the tolerable voltage.