Home / Tools / Primary and secondary impedance
Primary and secondary impedance for the 21
Calculate the line impedance from its ohms per kilometer, the ground compensation factor k0 in both of its forms, and the reaches of the zones you define, in primary and secondary ohms.
Blackburn and Dominsecondary Z = primary Z · CT ratio / VT ratioDistance relay (21) manualsk0 as magnitude and angle, RE/RL and XE/XL
Results
— Ω
— Ω
—
—
— Ω
— Ω
Want an engineer to review this case? Our team reviews your data and results and quotes the study or the settings work you need.
Charts
- Line Z1
- Zone 1
- Zones 2 to 4
Calculation and details
Step-by-step calculation
What it means for the settings
What it is for
Studies give the reaches in primary ohms, but many distance relays are set in secondary ohms and ask for ground compensation in their own format. This tool does that conversion without unit errors: use it to enter or review the settings of a 21, prepare the points of a secondary injection test, or check that a relay already set matches the line and the instrument transformers installed.
How it is calculated
Line impedance
Z1 = (R1 + jX1) · L · Z0 = (R0 + jX0) · LWith |Z| = √(R² + X²) and angle φ = arctan(X / R).
Blackburn and DominProtective Relaying: Principles and Applications
Primary to secondary
Zsec = Zpri · CTR / VTRWith the CT ratio CTR = Ipri / Isec and the VT ratio VTR = Vpri / Vsec, both voltages on the same base. If one is given phase-to-neutral, the tool multiplies it by √3 before dividing: mixing 115 kV phase-to-phase with 66.4 V phase-to-neutral without correction would give a √3 error. The angle does not change.
Ground compensation
k0 = (Z0 − Z1) / (3 · Z1) · RE/RL = (R0 − R1) / (3 · R1) · XE/XL = (X0 − X1) / (3 · X1)The first is a complex number given as magnitude and angle (the form used, for example, by SEL and ABB); the second, by components, is the one Siemens uses. In both cases the value is the same in primary and secondary. R0 can be lower than R1, and then RE/RL is negative.
Reach of each zone
Zzone = (percentage / 100) · |Z1|On the line angle, then converted to secondary with the same ratio. The zone 1 indicator is green below 90 % of the line, yellow between 90 % and 100 % (little margin for CT, VT and line data errors) and red from 100 %, because it would reach the remote bus. This is a Tiza convention; the percentage for each case comes from the study.
Limits of the calculation
- This is a conversion, not a setting: the percentages come from the protection coordination study, based on the adjacent line, the transformers at the remote substation, infeed and fault resistance.
- It assumes a homogeneous line, without zero-sequence mutual coupling to parallel circuits and without series compensation; in those cases the effective k0 and the reaches change.
- The mho in the chart is illustrative: if your relay uses a quadrilateral characteristic, the resistive reach is a separate setting this tool does not calculate.
- Check whether your relay expects the reach in per-phase ohms (the usual case) and in which unit it takes the line angle.
Frequently asked questions
How are primary ohms converted to secondary ohms for a distance relay?
Multiply the primary impedance by the CT ratio and divide it by the VT ratio: Zsec = Zpri · CTR / VTR. For example, with a 600/5 CT (CTR = 120) and a 115 kV/115 V VT (VTR = 1000), 10 primary ohms equal 1.2 secondary ohms.
What is the k0 ground compensation factor?
It is the ratio k0 = (Z0 − Z1) / (3·Z1) between the zero- and positive-sequence impedances of the line. The relay uses it so that the phase-to-ground loops measure the same positive-sequence impedance as the phase-to-phase loops. Some manufacturers ask for it as magnitude and angle, others as two numbers, RE/RL and XE/XL.
Does k0 change between primary and secondary?
No. k0 is a ratio of two impedances of the same line, so the CT and VT ratios cancel out. What does change with the ratios are the zone reaches in ohms.
We set your distance protection
We do the protection coordination study of the line, define the reach of each zone and the k0, and load the settings into the relay remotely, in the manufacturer's format.
