Tiza Group

Home / Tools / Insulation correction

Insulation temperature correction

Bring insulation resistance to 40 °C for rotating machines or to 20 °C for transformers, check the polarization index and DAR, correct the power factor of transformers and bushings to 20 °C and compare with your past measurements.

IEEE 43correction to 40 °C, PI and minimum resistanceANSI/NETAtable 100.14, factors to 20 °CIEEE C57.12.90PF correction table withdrawn in 2010IEEE C57.19.01PF of new OIP bushings

Example cases
Insulation temperature correction
E1Equipment and method
°C

Winding temperature or top-oil temperature.

For the trend.

From the manufacturer's table or your test set: reference value = K × reading.

E2Insulation resistance
MΩ

Optional, for DAR.

MΩ

The reading to be corrected.

MΩ

Optional, for PI.

MΩ

Optional: the manufacturer's value or the one in your specification, at the same reference temperature.

E2Power factor
%
%

0.5 % is the typical reference for oil-filled transformers and new OIP bushings.

%

Optional: the C1 from the bushing nameplate or from the factory tests.

E3Rotating machine
kV
E4Past readings

Up to six, in any order. They are corrected with the same method. Leave unused ones empty.

MΩ
°C
MΩ
°C
MΩ
°C
MΩ
°C
MΩ
°C
MΩ
°C

Use a decimal point. The calculation runs in your browser and updates as you type.

Corrected resistance

— MΩ

Correction factor

—

Polarization index

—

DAR 60 s / 30 s

—

Trend

— %

Reference minimum

— MΩ

Corrected trend
  • Corrected to the reference
  • As measured
  • Minimum or limit
Each point is a measurement. Only readings corrected to the same temperature can be compared with each other; the large point is the current measurement.
Correction factor
  • Method factor
  • K = 1, reference temperature
  • Measured temperature
Logarithmic vertical axis. With the manufacturer's factor only the point you entered is drawn.

Step-by-step calculation

YearMeasuredTemp. or KCorrected

What it means for the equipment

    What it is for

    Insulation resistance halves, or worse, with every 10 °C rise, and power factor rises with temperature. A 2000 MΩ reading on a cold motor and a 600 MΩ reading on the same motor just stopped can describe the same insulation. To decide whether a winding is taking on moisture or aging, each measurement has to be brought to the same reference temperature and compared with the earlier ones. This tool makes that correction with the method you choose, evaluates the polarization index and DAR, and plots the trend of up to six past measurements.

    How it is calculated

    IEEE 4310 °C rule, 40 °C reference

    R40 = KT · RT · KT = 0.5(40 − T)/10

    It is the traditional IEEE 43 rule: resistance halves for every 10 °C rise. The 2013 edition keeps it for thermoplastic insulation (asphalt-mica and other older systems). Megger gives it as a general rule of thumb: 2 MΩ at 20 °C is 0.5 MΩ at 40 °C.

    IEEE 43-2013thermoset insulation

    KT = exp[−1245 · (1/(T + 273) − 1/313)] from 10 to 40 °C · KT = exp[−4230 · (1/(T + 273) − 1/313)] from 40 to 85 °C

    For epoxy-mica and polyester, the 2013 edition splits two ranges. The constants were taken from the EASA technical summary of the standard; check them against your copy of IEEE 43 before using them in a formal report. Below 40 °C this insulation changes much less than with the 10 °C rule: at 20 °C, KT = 0.76 against 0.25.

    ANSI/NETAtable 100.14, oil insulation column

    R20 = K · RT

    For oil-filled transformers the tool uses the factors of table II of Megger's "A Stitch in Time" guide, oil-filled transformer column, which NETA reproduces in its table 100.14: 0.25 at 0 °C, 0.50 at 10 °C, 1.00 at 20 °C, 1.98 at 30 °C, 3.95 at 40 °C, 7.85 at 50 °C, 15.85 at 60 °C and 44.70 at 75 °C. Between rows the tool interpolates on a logarithmic scale.

    IEEE 43polarization index and minimum resistance

    PI = R10 min / R1 min · DAR = R60 s / R30 s
    • Rotating machines, IEEE 43: minimum PI of 1.5 for class A and 2.0 for classes B, F and H. If the 1-minute resistance corrected to 40 °C exceeds 5000 MΩ, PI is not meaningful. Minimum 1-minute resistance at 40 °C: kV + 1 MΩ for windings built before 1970 and field windings, 100 MΩ for AC form-wound windings built after 1970 and 5 MΩ for random-wound and form-wound windings below 1 kV.
    • Transformers and DAR: Megger table I, which the manufacturer itself calls tentative. PI below 1, dangerous; 1 to 2, questionable; 2 to 4, good; above 4, excellent. DAR from 1.0 to 1.25, questionable; 1.4 to 1.6, good; above 1.6, excellent. The tool flags the 1.25 to 1.4 range, which the table does not classify, as an alert.
    • DAR is calculated as 60 s / 30 s, the Megger and AEMC definition. Some instruments offer other time pairs; if you use another one, do not compare it with these thresholds.
    • Neither PI nor DAR is corrected for temperature: they are ratios of two readings at the same temperature.

    IEEE C57.12.902010 editionIEEE C57.19.01bushings

    FP20 = K · FPT

    IEEE C57.12.90 withdrew its general power factor correction table in 2010, noting that the variation with temperature "is large and erratic, and no single curve fits all cases". That is why the tool does not make up a curve: use the factor from the transformer or bushing manufacturer's table, or the one from your test set. Each bushing manufacturer publishes its own by type.

    • Typical reference: 0.5 % at 20 °C for oil-filled power transformers (Bureau of Reclamation, FIST 3-31, 8.1) and for new OIP bushings (IEEE C57.19.01, table 6). You can change the limit.
    • Status (Tiza convention): pass up to the limit, alert up to twice the limit and fail above that. For a bushing with a 0.5 % limit, twice the limit matches the 1 % above which IEEE Std 62 suggests seeking expert help.
    • Current practice prefers to test with the insulation close to 20 °C or to use dielectric frequency response (DFR), which corrects each unit with its own curve.

    Trend

    Δ = Xcurrent / Xprevious − 1

    Each past reading is corrected with the same method, with its own temperature or its own K factor, and the current reading is compared with the one just before it. Tiza convention: alert if the corrected resistance drops 50 % or more, or if the corrected power factor rises 50 % or more.

    Limits of the calculation

    • It is an estimate, not a diagnosis. The factors are averages of many units; yours may behave differently, especially if it is wet or contaminated.
    • The farther from the reference you measure, the larger the correction error. If you can, test with the insulation close to 40 °C (machines) or 20 °C (transformers).
    • The thermoset constants of IEEE 43-2013 come from a technical summary, not from the text of the standard. The Megger and NETA tables apply to oil-filled transformers, not to dry-type units or units with natural ester.
    • The temperature that matters is the insulation temperature: winding temperature by resistance or detector, or top oil after a rest period, not ambient.
    • Insulation resistance and power factor do not detect every defect. A decision about the equipment should rest on the full set of tests and on the factory history.

    Frequently asked questions

    How is insulation resistance corrected to 40 °C?

    IEEE 43 brings the reading to 40 °C with R40 = KT · RT. The traditional rule assumes that resistance halves for every 10 °C rise: KT = 0.5^((40 − T)/10), so 2000 MΩ measured at 20 °C equal 500 MΩ at 40 °C. The 2013 edition keeps that rule for thermoplastic insulation and gives another expression for thermoset insulation (epoxy-mica), which changes much less below 40 °C. Any factor is an average: the best comparison is between readings taken at similar temperatures.

    What is the minimum polarization index of a motor?

    IEEE 43 recommends a polarization index (R at 10 min / R at 1 min) of at least 1.5 for class A insulation and 2.0 for classes B, F and H. If the 1-minute resistance corrected to 40 °C exceeds 5000 MΩ, the index is no longer meaningful. It also sets a minimum 1-minute resistance at 40 °C: 100 MΩ for most AC form-wound windings built after 1970, 5 MΩ for random-wound and form-wound windings below 1 kV, and kV + 1 MΩ for older windings and field windings.

    How is the power factor of a transformer corrected to 20 °C?

    With the factor from the manufacturer's table or from the test set: PF20 = PFT · K. IEEE C57.12.90 withdrew its general table in 2010 because the variation of power factor with temperature is large and erratic, and no single curve fits every case. That is why current practice prefers to test with the insulation at a known temperature close to 20 °C, or to use dielectric frequency response (DFR), which allows an individual correction for each unit. As a typical reference, the power factor of an oil-filled transformer should not exceed 0.5 % at 20 °C.

    We test the insulation of your equipment on site

    We measure insulation resistance, polarization index, power factor and dielectric response on transformers, bushings and motors, in Colombia, or elsewhere on request, with the temperature recorded and the trend against your past tests.

    Other tools

    COMTRADE generatorCreate a COMTRADE fault record (.cfg/.dat or .cff) for your test set: fault, DC offset and breaker opening.ANSI / IEEE C37.2 device numbersDevice function numbers 1 to 94, common suffixes and their IEC 61850 logical node, with search.Relay coordinationUp to six relays, reclosers and fuses on a log-log plot, with the IEEE C57.109 damage curve, inrush and the coordination margin of each pair.Inverse-time curvesCalculator and log-log plot of the IEC 60255-151 and IEEE C37.112 curves, with the coordination margin.CT burdenLead resistance, relay burden and comparison with the rated burden of the current transformer.Short-circuit currentQuick estimate of the three-phase fault at the secondary of a transformer.COMTRADE viewerOpen .cfg/.dat or .cff fault records in your browser: waveforms, digital channels, cursor and RMS. The file is not uploaded.IEC 61850 SCL viewerOpen .scd, .cid or .icd files in your browser: IEDs, GOOSE and SV addresses, datasets, subscribers and checks. The file is not uploaded.GOOSE and SV addressesCheck IEC 61850 multicast MAC, APPID, VLAN and priority, find duplicates and export the table as CSV.Process bus networkSV and GOOSE bandwidth, worst-case latency, PRP, HSR or RSTP redundancy and PTP time error of an IEC 61850 network.Interlocking table and CILO equationsInterlocking matrix per device, IEC 61850 EnaOpn and EnaCls equations, GOOSE signals between bays and FAT/SAT test cases per configuration.Per-unit base conversionBase current and impedance, conversion between %, pu and ohms, and change of base for transformers, generators and lines.Harmonic distortion THD and TDDVoltage THD and current TDD against the IEEE 519-2022 limits, with the spectrum as a bar chart.Symmetrical componentsPhase quantities to zero, positive and negative sequence and back (Fortescue), with phasor diagrams and what they mean for 46, 67Q and 51N.Vector group compensation (87T)TAP of each winding, phase compensation matrix, zero-sequence removal and the HV-to-LV clock diagram.Primary and secondary impedance (21)Primary to secondary ohms with the CT and VT ratios, line Z1, Z0 and k0, and zone reaches on the R-X plane.CT saturationRequired versus available voltage (5P/10P, PX or C class), time to saturation and the saturated waveform.DGA interpretationIEEE C57.104-2019 DGA status, Duval triangles 1, 4 and 5, IEC 60599 ratios and CO₂/CO of your transformer.Capacitor bankkvar to correct the power factor, steps of the automatic bank, capacitance and resonance with the transformer.Cable voltage dropΔV and % with R and X per km, copper or aluminium, mm² or AWG/kcmil, and the short-circuit check of the cable size.Battery sizingAh, number of cells and charger of a DC battery bank from its duty cycle, per IEEE 485 and IEEE 1115.Grounding resistanceGround rods, horizontal conductor and grid (BS 7430, IEEE 80), and soil resistivity from Wenner measurements.Technical glossarySubstation, protection and communications terms, explained in one or two sentences.
    WhatsApp