Home / Guides / Protection, control and communications / IEC 61850 and protocols
IEC 61850 and protocols
Protection, control and communications
MT/AT/EATIEC 61850 Traffic in Wireshark: What a Capture RevealsWhat a Wireshark capture of GOOSE, Sampled Values and MMS shows: stNum, sqNum, TAL, simulation, smpCnt and the patterns that reveal each network fault.MT/AT/EATIEC 61850 Edition 1 vs 2 vs 2.1: differencesWhat changed between IEC 61850 Editions 1, 2 and 2.1: test and simulation, LGOS and LSVS, SCL and quality, and what to check when mixing IED editions.MT/AT/EATIEC 61850 GOOSE: How It Works, stNum, sqNum and TestingHow GOOSE works (IEC 61850-8-1): layer 2 multicast, VLAN, retransmission with stNum, sqNum and TAL, transfer time and uses. We can configure it remotely.AT/MTIEC 60870-5-104: How It Works and How to Test ItIEC 60870-5-104 protocol: APCI and ASDU, I, S and U frames, cause of transmission, k, w, t0 to t3, redundancy and security. We can configure it remotely.MT/AT/EATIEEE 802.1Q: VLAN Tag, Priority and VID for GOOSE and SVIEEE 802.1Q defines the VLAN tag: TPID, PCP and VID. It separates and prioritizes GOOSE and sampled values in substations. We configure it remotely.MT/AT/EATIEC 61850: What It Is, Its Parts and Data ModelIEC 61850 series guide: parts of the standard, data model (server, LD, LN, DO, DA), services, MMS, GOOSE and SV mappings, SCL, editions and conformance.AT/MTDNP3 (IEEE 1815): How It Works and How to Test ItDNP3 (IEEE 1815) in substations: layers, groups and variations, event classes, unsolicited responses, time sync, Secure Authentication v5 and testing.AT/MTModbus RTU and TCP: registers, address 40001, errorsHow to read Modbus RTU and TCP registers: why 40001 is address 0, function codes, RTU frame, MBAP header and wrong 32-bit values. Remote setup offered.MT/AT/EATIEC 61850 SCL Files: ICD, IID, SSD, SCD, CID and SEDWhat SCL (IEC 61850-6) is and what each file does: ICD, IID, SSD, SCD, CID and SED. Engineering workflow, common errors. We can configure it remotely.MT/AT/EATIEC 61850 Station Bus: Traffic, Topology and TestingWhat the station bus of an IEC 61850 substation is: MMS, GOOSE and time traffic, IEC TR 61850-90-4 topologies, redundancy, design and testing.