Home / Guides / Protection, control and communications / Cybersecurity
Cybersecurity
Protection, control and communications
MT/AT/EATIEC 62351: Cybersecurity for IEC 61850, 104 and DNP3What IEC 62351 covers: TLS for MMS and 104, GOOSE and SV authentication, role-based access control, key management and its link to IEC 62443 in practice.MT/AT/EATSecure Remote Access to Substations: DMZ and VPNSecure remote access architecture for protective relays: VPN, DMZ, jump server, multi-factor authentication, recorded sessions. We configure it remotely.AT/EATIntrusion Detection (IDS) in Substation NetworksHow an IDS works on a substation network: passive monitoring, a baseline of IEC 61850, IEC 104 and DNP3 traffic, typical alerts and sensor placement.IEEE 1686: IED cybersecurity capabilitiesWhat IEEE 1686-2022 requires of a protective relay or IED: access control, roles, audit trail, configuration, firmware and ports, and how to specify it.AT/EATGOOSE and Sampled Values Security: IEC 62351-6 and -9How IEC 61850 GOOSE and sampled values are protected: why they do not use TLS, group-key authentication, GDOI in IEC 62351-9 and what to check in practice.MT/AT/EATPatch and Firmware Management for Relays and IEDsPatch and firmware management for relays and IEDs: vendor advisories, assessment, bench testing in the lab, backup, installation and compensating controls.MT/AT/EATHardening relays, switches and IEDs: the controlsWhat to harden in relays, controllers, switches, gateways and clocks: accounts, ports, services, logging, firmware and baseline. We configure it remotely.MT/AT/EATOT asset inventory of a substationWhat to inventory in a substation (IEDs, switches, firmware, ports, accounts, connections), how to rank it by criticality and how to keep it current.MT/AT/EATRole-Based Access Control in IEDs: IEC 62351-8Role-based access control per IEC 62351-8:2026 in relays and IEDs: predefined and custom roles, access tokens, LDAP integration and personal accounts.