Home / Guides / Protection, control and communications / Relays by model
Relays by model
Protection, control and communications
RelaySEL acSELerator Architect (SEL-5032): What It Is and UsesSEL acSELerator Architect (SEL-5032) configures and documents IEC 61850 systems with SCL files. What it does and how it works with QuickSet. Done remotely.RelayGE Multilin 869 and 859 Motor Protection RelaysGE Vernova Multilin 869 and 859 motor relays of the 8 Series: motors they protect, ANSI functions, IEC 61850 and their replacement of the 469 relay.RelayGE Multilin 850 Feeder Protection Relay: FunctionsWhat the GE Vernova Multilin 850 feeder relay is, where it is used, its protection functions, IEC 61850 and DNP3, fault records. We configure remotely.RelayMultilin F60, F35, C60 and C30: UR Feeder RelaysGE Vernova Multilin F60, F35, C60 and C30 relays of the UR family: feeder, breaker and control, variants, IEC 61850 and EnerVista. We configure remotely.RelaySiemens DIGSI: What It Is, DIGSI 4 vs DIGSI 5, UsesDIGSI is Siemens software for configuring SIPROTEC relays. DIGSI 4 vs DIGSI 5, editions, System Configurator and SIGRA. We can configure it remotely.RelayGE EnerVista Software: UR Setup, 8 Series, LaunchpadGE Vernova EnerVista software: UR Setup, 8 Series Setup, Launchpad and Viewpoint for Multilin relays. What each does, which relays it supports, FAQs.RelaySEL-751, SEL-751A, SEL-551 and SEL-501 Feeder RelaysSEL-751 and SEL-751A feeder protection relays, and the earlier SEL-551 and SEL-501: variants, functions, settings, IEC 61850, DNP3 and event reports.RelaySEL-710-5 and SEL-710 Motor Protection Relay GuideWhat the SEL-710-5 motor protection relay and its predecessor SEL-710 are, which motors they protect, ANSI functions, arc-flash detection, IEC 61850.RelaySEL-311C and SEL-311L: Distance and Line DifferentialSEL-311C distance and SEL-311L line differential relays with distance backup: ANSI functions, channels, DNP3 and IEC 61850. We can configure them remotely.RelaySchneider Easergy P3 Relay: P3U30, P3U20, P3F30, P3T32Schneider Easergy P3 relays, P3U10 to P3G32: ANSI functions, IEC 61850, Easergy Pro software and remote setup offered for every variant in the P3 range.