Double wye unbalance: neutral current or voltage

How unbalance protection works in an ungrounded double wye capacitor bank: current or voltage between neutrals, advantages and limits (IEEE C37.99).

By Shadai García, CEO and protection engineer at Tiza Group.

busN1N2star 1star 260unbalancehealthy bank: almost no neutral-to-neutral currentone unit isolated in one wye: current flows(a) Ungrounded: neutral-to-neutralcurrent, CT, overcurrent relay(b) Ungrounded: neutral-to-neutralvoltage, VT, overvoltage relay(c) Grounded: separate CTs,secondaries crossed to relay(d) Tied neutrals: VT at commonneutral, harmonic-filter relaydoubles sensitivity and removes the systemvoltage unbalance effect (cl. 8.2.3)ChainDouble wyeCT between neutralsUnbalance relayAlarm or trip© tizagrp.combusN1N2star 1star 260unbalancehealthy bank: almost no neutral-to-neutral currentone unit isolated in one wye: current flows(a) Ungrounded: neutral-to-neutralcurrent, CT, overcurrent relay(b) Ungrounded: neutral-to-neutralvoltage, VT, overvoltage relay(c) Grounded: separate CTs,secondaries crossed to relay(d) Tied neutrals: VT at commonneutral, harmonic-filter relaydoubles sensitivity and removes the systemvoltage unbalance effect (cl. 8.2.3)ChainDouble wyeCT between neutralsUnbalance relayAlarm or trip© tizagrp.com
Ungrounded double wye unbalance: CT between neutrals and current when a unit is isolated in one wye. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

In an ungrounded double wye capacitor bank, unbalance protection measures the current or voltage between the two neutrals. According to IEEE C37.99-2000 (cl. 8.2.6.2), this differential measurement avoids the effect of system voltage unbalance and is not affected by balanced third harmonics. In exchange, the CT or VT must be rated for system voltage, and faults can cancel between the two wyes.

Short answer

The ungrounded double wye splits the bank into two equal wyes whose neutrals are not connected to ground. The unbalance protection measures the current or voltage between those two neutrals: with the bank healthy, it is almost zero; when one wye loses a unit, a difference appears. According to IEEE C37.99-2000 (clause 8.2.6.2), this method avoids the effect of system voltage unbalance and is not affected by third harmonics when they are balanced. Care must be taken with the insulation of the CT or VT, which is rated for system voltage, and with faults that cancel between the two wyes.

How it works

With the two wyes equal, any external effect that acts on both equally, such as a variation of the system voltage, also appears at both neutrals and cancels in the measurement between them. Only a difference between one wye and the other produces a signal. If one wye loses a unit or an element, the neutral of that wye shifts relative to the other, and a current (or a voltage) proportional to that difference flows (or appears) between the two neutrals.

The standard states that, for this reason, an ungrounded bank can be split into two equal halves and thus inherently compensate for system unbalance, since the neutral current or voltage is measured differentially. The effect of manufacturing tolerance remains, and it is estimated with the equations of Annex C. It is covered in the guide on inherent unbalance.

The schemes for the other connections are neutral voltage in an ungrounded wye, neutral current in a grounded wye and voltage differential. The connections are compared in bank connection: grounded wye, ungrounded wye or delta.

The methods of figure 13

Clause 8.2.6.2 presents four methods. Three are for ungrounded banks and one for grounded banks; the latter is mentioned only to complete the picture.

SchemeBankWhat it measuresStandard’s remark
(a)UngroundedCurrent between neutrals with a CT and overcurrent relay, or a shunt and voltage relayCT rated for system voltage
(b)Ungrounded, isolated neutralsVoltage between neutrals with a VT and overvoltage relayVT rated for system voltage
(c)GroundedNeutrals grounded through separate CTs with secondaries crossed to an overcurrent relayCovered in separate guides
(d)Ungrounded, neutrals tied togetherVT between the common neutral and groundThe relay must have a harmonic filter

Schemes (a) and (b) avoid the effect of system unbalance, and neither is affected by third-harmonic current or voltage when the bank is balanced.

What to know about each element

Neutral current. It is half that of a grounded bank of the same rating. Although small, the CT ratio and the relay range can be chosen for the desired sensitivity, because in the ungrounded scheme they are not subject to the switching currents or single-phase load currents that do affect the CT of a grounded neutral.

System voltage. The CT or VT between neutrals must have system-voltage insulation, because the neutral is not grounded and can rise during switching. If the neutral displacement is measured with a VT, the transformation ratio is high, and the voltage signal reaching the relay can be very small. That is a disadvantage compared with current.

Neutral displacement. The voltage displacement can be determined in the same way as for a simple wye bank of the same rating as one section of the double wye. The calculation details (tables 2 and 3 of the standard) are left to the study of each bank.

Harmonics. In scheme (d), with the neutrals tied together, the relay must have a harmonic filter so that it does not respond to components at other frequencies.

What it sees and what it does not

The ungrounded double wye detects well the loss of units in a single wye, and does not depend on system unbalance. It has two limits of its own:

  1. Ambiguous indication. The standard points to the double wye as the classic example: fuse operations or shorted elements in one wye can cancel the signal generated in the other, and the bank is left unbalanced without the relay seeing it. It is covered in the guide on ambiguous indications.
  2. Rack-to-rack faults. In banks with groups connected phase over phase, the racks must be connected to alternating sides of each group so that a flashover between them produces current between neutrals (clause 8.2.2 and figure 10).

To reduce the first limit, the alarm must be as sensitive as possible, for a single fuse or a single element, and the trip must allow for faults that cancel.

The readings that can mislead the relay are in ambiguous indications and faults that unbalance does not see, and the signal of the healthy bank is in inherent unbalance and measurement error.

When this configuration is chosen

The standard gives a practical reason: splitting a wye bank into a double wye doubles the sensitivity of the protection and removes the effect of system voltage unbalance (clause 8.2.3). It is the usual choice when the bank is large enough to split and you do not want to compensate for the system with additional VTs.

If, instead, the bank is an ungrounded wye with a single neutral, the measurement is the neutral voltage. If the bank is grounded, the analysis changes: neutral current or voltage differential is used.

The function that uses the signal is unbalance protection (ANSI 60).

What not to do

  • Do not choose a CT rated below the system voltage for the isolated neutral.
  • Do not assume that a current near zero means a healthy bank (ambiguity).
  • Do not connect the racks to only one side in phase-over-phase banks.
  • Do not forget the harmonic filter when the neutrals are tied together.

When to contact us

If your bank is a double wye and you are not sure which faults your relay covers or which CT ratio suits it, at Tiza Group we review it and document the scheme. We do remote relay configuration and quote the work according to its scope. Write to us.

References

  • IEEE C37.99-2000, IEEE Guide for the Protection of Shunt Capacitor Banks, clauses 8.2.2, 8.2.3, 8.2.6.2 and Annex C (table C.1), figures 7, 10 and 13.

Frequently asked questions

Why is protection between neutrals not affected by system unbalance?

Because it compares two halves of the same bank. A system voltage unbalance acts on both wyes equally and produces no difference between their neutrals. IEEE C37.99-2000 (cl. 8.2.6.2) states that both ungrounded schemes avoid that effect. The effect of the manufacturing tolerance of the capacitors remains.

How much current flows through the CT between neutrals compared with a single bank?

The standard states that the neutral current is half that of a grounded bank of the same rating. Even so, the CT ratio and the relay range can be chosen for the desired sensitivity, because in the ungrounded scheme they are not exposed to switching currents or single-phase load currents.

Which fault can go unnoticed in a double wye?

A fault that cancels between the two wyes, for example the same number of units out in the same phase on both sides. The current between neutrals is almost zero, just as with a healthy bank. That is why a sensitive alarm, for a single fuse or element, is recommended.