Tiza Group

Home / Guides / Industry and automation

Coordinated SPDs: class I, II, III and Iimp current

How SPDs are coordinated between LPZ zones under IEC 62305-4: class I, II and III tests, Iimp current, effective protection level and isolating interfaces.

By Shadai García, CEO and protection engineer at Tiza Group.

inputmainpanelsub-distributionboarddeviceclassI IimpclassII InclassIII UOCUP/F marked at each stageUP/F = UP + ΔU (voltage-limiting SPD)ΔU: inductive drop, 1 kV per metre of conductorSPD at equipmentterminals: UP/F ≤ UWUp to 10 m fromequipment: UP/F ≤ 0.8 UWOver 10 m from equipment:UP/F ≤ (UW − UI) / 2UW: equipment impulse withstand voltageChainClass I IimpClass II InClass III UOCUP/F ≤ UW© tizagrp.cominputmainpanelsub-distributionboarddeviceclassI IimpclassII InclassIII UOCUP/F marked at each stageUP/F = UP + ΔU (voltage-limiting SPD)ΔU: inductive drop, 1 kV per metre of conductorSPD at equipmentterminals: UP/F ≤ UWUp to 10 m fromequipment: UP/F ≤ 0.8 UWOver 10 m from equipment:UP/F ≤ (UW − UI) / 2UW: equipment impulse withstand voltageChainClass I IimpClass II InClass III UOCUP/F ≤ UW© tizagrp.com
Coordinated SPDs in IEC 62305-4: class I at the main panel, class II at the sub-distribution board and class III at the equipment, with the effective protection level UP/F. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

A coordinated SPD system installs surge protective devices at the entrance of each protection zone, with energy coordinated between them. IEC 62305-4 chooses the test class by location and lightning source: class I (impulse current Iimp, 10/350 µs) at the structure entrance, class II (nominal current In) and class III (combination wave) near the equipment. The effective protection level must stay below the equipment withstand voltage.

Short answer. A coordinated system of SPDs (surge protective devices) places SPDs at the entrance of each lightning protection zone (LPZ), with energy coordinated between stages. IEC 62305-4 (clause 7 and Annexes C and D) sets where each test class goes: class I, with impulse current Iimp, at the structure entrance where direct lightning is possible; class II and class III near the equipment. It works if the effective protection level stays below the voltage the equipment can withstand.

What a coordinated system is

IEC 62305-1 (definition 3.54) calls a coordinated SPD system a set of SPDs properly selected, coordinated and installed to form a system that reduces failures of electrical and electronic systems. Clause 7 of Part 4 establishes that:

  • With more than one inner zone (LPZ 1, LPZ 2 and subsequent), an SPD is installed at the line entrance of each zone.
  • With only LPZ 1, at least one SPD is installed at the line entrance to LPZ 1.
  • In both cases additional SPDs may be needed if the distance between the SPD and the equipment is large.
  • Both power and signal lines are protected.

SPD testing is governed by IEC 61643-1 (power) and IEC 61643-21 (telecommunications and signalling).

The three test classes and where they go

Test classTest parameterWhere it is used per IEC 62305-4
Class IImpulse current Iimp (typical shape 10/350 µs)Structure entrance (LPZ 1 boundary, for example the main panel), where direct or partial lightning current is present
Class IINominal discharge current In (typical shape 8/20 µs)Structure entrance, only if the lines enter entirely within LPZ 0B or failure due to strikes to the structure or line can be neglected; and near the equipment (sub-distribution board, socket outlet)
Class IIICombination wave with open-circuit voltage UOCNear the equipment, with the same condition of lines within LPZ 0B or negligible risk

The short-circuit current of a class III SPD follows from UOC, because the test uses a combination wave generator with a 2 Ω impedance. An SPD with class I and II characteristics can be used at the sub-distribution board.

The condition for neglecting SPD failure due to strikes to the structure (ND) or to the line (NL) is ND + NL ≤ 0.01. In general, the standard recommends class I where direct or partial currents are involved (strikes to the structure or to the lines) and class II or III for induced effects (nearby strikes). Many buildings do not need protection against direct strikes, and for them a well-designed class II system may be enough.

The Iimp current

Table D.1 gives the preferred values of Iimp for SPDs connected line to neutral, with the corresponding charge Q and specific energy W/R:

Iimp (kA)1251012.52025
Q (C)0.512.556.251012.5
W/R (kJ/Ω)0.2516.252539100156

Iimp is associated with longer waveforms (such as 10/350 µs) than those of Imax. To choose it, the current at the point of installation must be estimated, which depends on the protection level and on how the current divides. Without a specific current-sharing calculation, the standard assumes that 50 % of the current goes to the building’s earthing system and the other 50 % returns through the equipotential bonding SPDs. With level I (200 kA) and a three-phase system with neutral, that gives 25 kA per SPD. If instead three metallic services enter and the Part 1 model is applied, the current in each bonding SPD of the three-phase system drops to 8.3 kA. The earthing arrangement also affects the sharing.

Effective protection level

Clause C.2.1 compares the protection level UP of the SPD, which is the residual voltage at its nominal current In, with the impulse withstand voltage UW of the equipment. But the voltage at the equipment is the effective protection level UP/F:

  • For voltage-limiting SPDs: UP/F = UP + ΔU.
  • For voltage-switching SPDs: UP/F = the larger of UP and ΔU.

ΔU is the inductive drop in the connecting conductors. At the structure entrance, 1 kV per metre of conductor is assumed. If the conductors are 0.5 m or shorter, UP/F = 1.2 × UP may be assumed. The shorter they are, the better.

The internal systems are protected if they are energy-coordinated with the upstream SPDs and one of three conditions is met:

Circuit length between SPD and equipmentConditionTypical case
NegligibleUP/F ≤ UWSPD at the equipment terminals
Up to 10 mUP/F ≤ 0.8 UWSub-distribution board or socket outlet
More than 10 mUP/F ≤ (UW − UI) / 2Structure entrance or remote sub-distribution board

UI is the overvoltage induced in the loop between the SPD and the equipment. If there is spatial or line shielding, it is usually negligible. If a failure could cost lives or leave the public without service, the standard calls for considering twice the voltage due to oscillation and requiring UP/F ≤ UW / 2. A long circuit can double the voltage (up to 2 × UP/F) if the equipment is left open-circuit.

Installation procedure

Annex C.3.5 summarises the procedure:

  1. Install SPD 1 at the structure entrance, with the current requirements of C.2.2.
  2. Determine the withstand voltage UW of the internal systems and the protection level UP1 of SPD 1, and verify C.2.1.
  3. If it is not met, install SPD 2 closer to the equipment (sub-distribution board), energy-coordinated with SPD 1, and verify again.
  4. If it is still not met, install SPD 3 next to the equipment, coordinated with the previous ones, and verify that UP/F3 ≤ UW.

Energy coordination between cascaded SPDs follows IEC 61643-12 or IEC 61643-22, and the manufacturer must supply the information needed to achieve it. SPDs must be installed with the shortest possible connecting conductors, with the cross-sections of Table 1 of Part 4 (16 mm² copper for class I, 6 mm² for class II, 1 mm² for class III). The closer to the entrance an SPD is, the more equipment it protects; the closer to the equipment, the more effective it is.

Spark gap and varistor

Part 1 (Annex D.6) treats SPDs with spark gaps and SPDs with metal-oxide varistors as different cases. In the spark gap, wear comes from erosion of the electrodes by the arc and from mechanical shock. In the varistor, damage comes from overload by absorbed energy and from flashover, and the main parameter is the charge. For the surge arresters of MV, HV and EHV switchyards, see surge arresters, and for photovoltaic systems, SPDs in photovoltaic systems.

Isolating interfaces

Clause 8 and definition 3.56 call isolating interfaces the devices capable of reducing conducted surges on lines entering the zone. They include isolation transformers with an earthed screen between windings, metal-free fibre-optic cables and optoisolators (optocouplers). Annex B adds double-insulated class II equipment without a PE conductor. Their withstand level must be coordinated with the overvoltage categories of IEC 60664-1, and if necessary they are protected with SPDs. A fibre cable without a metal armour, metal moisture barrier or steel wire between structures needs no protection measures.

Which SPD class at the structure entrance
  • Are the incoming lines entirely within LPZ 0B, or ND + NL ≤ 0.01?
    • Yes: Is the equipment withstand voltage met with UP/F of the class II SPD?
      • Yes: Class II SPD (In) at the entrance, and verify coordination with the following stages
      • No: Class II SPD plus an additional stage near the equipment
    • No: Class I SPD (Iimp) at the entrance, with the sharing current of the protection level

Guides in the same series

The boundaries where the SPDs are installed are the lightning protection zones (LPZ); the set of measures is in SPM against LEMP; the bonding of the SPDs to the network is in equipotential bonding network and 3D earthing system. In an industrial plant, see also industrial lightning protection.

When to call us

The selection of classes, currents and protection levels depends on the lightning protection level, the earthing, the cables and the withstand voltage of each item of equipment. If you are designing or reviewing the surge protection of a plant, a control room or a substation, our engineering design and studies team can support you on the electrical side of the project. Write to us through the contact page.

References

  • IEC 62305-4:2010, Protection against lightning, Part 4: Electrical and electronic systems within structures: clauses 7 and 8, Annex B.10 and B.13, Annex C (selection and installation of coordinated SPDs) and Annex D (Table D.1).
  • IEC 62305-1:2010, definitions 3.54 to 3.56, Annex D.6 and Annex E.5.
  • IEC 61643-1, IEC 61643-12, IEC 61643-21, IEC 61643-22, IEC 60364-5-53 and IEC 60664-1.

Frequently asked questions

What is the Iimp current of an SPD and what is it for?

It is the impulse current used to test a class I SPD, with a long waveform, typically 10/350 µs, representing the partial current of a direct lightning strike. IEC 62305-4, Table D.1, gives the preferred values: 1, 2, 5, 10, 12.5, 20 and 25 kA, with their associated charge and specific energy.

When is a class II SPD enough at the structure entrance?

When the incoming lines are entirely within zone LPZ 0B, or when the probability of SPD failure due to strikes to the structure or to the lines can be neglected, which is the case if the sum of the dangerous events ND and NL is less than or equal to 0.01. In all other cases, the entrance requires a class I SPD.

Why is it not enough to pick an SPD whose protection level UP is lower than the equipment withstand voltage?

Because the inductive drop in the connecting conductors is added to UP, which the standard takes as 1 kV per metre at the structure entrance, and, if the circuit to the equipment is long, the oscillation that can double the voltage. For that reason the standard requires UP/F less than or equal to UW, 0.8 UW or (UW minus the induced voltage) / 2, depending on the circuit length.

WhatsApp