Home / Guides / Codes and grid connection: US, UK, CA, AU / United Kingdom
United Kingdom
Codes and grid connection: US, UK, CA, AU
MT/ATBattery Storage Connection UK: G99 and Grid Code ProcessHow a battery storage project connects in Great Britain: import, export, G99 Issue 2 storage rules, the Grid Code for larger plants and a rating example.BTBS 7671 18th Edition Explained: Structure and UseBS 7671 18th edition explained: how its seven parts are organised, how the amendments fit and how one circuit is traced through it, with a worked example.BTBS 7671 Amendment 4 (2026): What ChangedBS 7671 Amendment 4 of 2026 explained: publication and withdrawal dates, the verified list of changes, and what the new battery rules mean for a design.BTBS 7671 Cable Sizing and Voltage Drop ExplainedBS 7671 cable sizing and voltage drop explained: current-carrying capacity, correction factors, the 3% and 5% limits and a three-phase submain example.BTBS 7671 Chapter 41: Protection Against Electric ShockBS 7671 Chapter 41 explained: automatic disconnection of supply, maximum disconnection times, 30 mA RCD additional protection and a loop impedance example.BTBS 7671 Chapter 43: Overcurrent Protection ExplainedBS 7671 Chapter 43 explained: overload and short-circuit protection, how to choose the protective device, the energy check and a worked cable example.BTBS 7671 Chapter 44: Surge Protection (SPD) ExplainedBS 7671 Chapter 44 explained: transient overvoltage protection in Section 443, SPD selection in Section 534, protection level and a lead-length example.BT/MT/ATCDM 2015 Electrical Designer Duties and Principal DesignerWhat CDM 2015 requires of an electrical designer in Great Britain: designer duties, the principal designer, notification, the safety file and an example.MTDistribution Code and DNO Connection Offers ExplainedHow the GB Distribution Code frames a DNO connection offer: who maintains it, what it asks of a generator, and a voltage rise check at the connection.MTDNO Connection Studies: Load Flow, Fault Level, ProtectionThe studies a GB DNO runs for a generation connection: load flow, fault level, protection and power quality, with a fault level check on an 11 kV busbar.