Bypass and transfer disconnector interlocking

Transfer (89T) and bypass disconnector interlocking: one circuit transferred at a time, the transfer breaker and moving the protection to it.

By Shadai García, electrical engineer, founder and CEO of Tiza Group. Reviewed by the Tiza Group engineering team · .

89BL15289L89T89BL25289L89T89TT52T89TP57TR123Close 89T of L21transfer: 89TP, 52T, 89TT closed289T of L1, T1, T2 open357TR open4L2 protection transferredCILO.EnaClstruefalsefalsecommand: close 89T of L2 · blockedcommand: close 52 of L1 · executedcommand: open 89T of L1 · executedcommand: restore L1 protectioncommand: transfer L2 protection to 52Tcommand: close 89T of L2 · executedIEC 61850XCBRXSWICILOCSWIXSWI© tizagrp.com89BL15289L89T89BL25289L89T89TT52T89TP57TR123Close 89T of L21transfer: 89TP, 52T, 89TT closed289T of L1, T1, T2 open357TR open4L2 protection transferredCILO.EnaClstruefalsefalsecommand: close 89T of L2 · blockedcommand: close 52 of L1 · executedcommand: open 89T of L1 · executedcommand: restore L1 protectioncommand: transfer L2 protection to 52Tcommand: close 89T of L2 · executedIEC 61850XCBRXSWICILOCSWIXSWI© tizagrp.com
Bypass and transfer disconnectors: one circuit transferred at a time. Location in the system, operating principle and IEC 61850. Illustrative: actual values come from the nameplate and the manufacturer's manual.
Short answer

The transfer disconnector (89T) and the bypass disconnector let a bay breaker be taken out for maintenance without interrupting the circuit, which then depends on the transfer breaker or the bus coupler. Their interlocking ensures the disconnector operates with no current or with both paths in parallel, and that only one circuit is transferred at a time, because the breaker replacing it can protect only one.

Why they exist

In a substation with one breaker per circuit, maintaining that breaker means taking the circuit out of service. Arrangements with a transfer path avoid it by adding an alternative route:

  • Main and transfer bus. Each bay has a transfer disconnector (89T) toward an auxiliary bus, and a transfer breaker ties that bus to the main bus.
  • Double bus with transfer. A transfer bus is added to the double bus, with its own breaker or with a bus coupler performing both functions.
  • Double bus with bypass. There is no transfer bus: a bypass disconnector bridges the bay breaker and one of the buses acts as the transfer bus, with the coupler as the substitute breaker.

In every case, during maintenance the circuit is protected and switched by another breaker. The interlocking must make sure that change happens without any disconnector interrupting or making load, and that only one circuit is substituted.

The sequence the interlocking protects

There are two practices for moving a circuit to the transfer bus. Both keep the disconnector free of any significant change in voltage across its terminals, as the International Electrotechnical Vocabulary definition of a disconnector requires (IEV 441-14-05):

Transferring a circuit to the transfer bus
  1. 01Close the transfer breaker and check the busThe transfer bus is energized from the main bus
  2. 02Open the transfer breakerThe transfer bus is dead
  3. 03Close the bay transfer disconnectorIt closes onto a dead bus, with no current
  4. 04Close the transfer breakerIt is now in parallel with the bay breaker
  5. 05Open the bay breaker and its disconnectorsThe circuit is now on the transfer breaker

The variant closes the transfer disconnector with the transfer breaker already closed. Since the bay breaker is also closed, both terminals of the disconnector are at the same potential. IEC 62271-102 recognizes this switching between parallel paths, for example when bypassing a breaker, and the capability of the disconnector depends on the current being commutated and on the size of the loop.

Usual conditions

Bay transfer or bypass disconnector:

  1. Transfer breaker (or coupler acting as transfer breaker) open, or that breaker and the bay breaker closed, with their disconnectors closed.
  2. No other transfer or bypass disconnector closed in another bay.
  3. Transfer bus earthing switches open.
  4. Valid position of every device involved.

Transfer breaker:

  1. Its disconnectors both open or both closed, as with any coupler.
  2. While a circuit is transferred and its own breaker is open, blocked against opening by command, except for a protection trip. It is now the circuit’s only breaker.

Bay breaker: it should not open by command before the circuit is in parallel with the transfer breaker, if the aim is not to interrupt service. That is an operating condition more than a safety one, and many designs leave it to procedure.

Condition 2 of the disconnector is the one most often forgotten. If two bays close their 89T, the transfer bus ties them together. A fault on either opens the transfer breaker and leaves both out of service, and in some states it can form a loop between circuits through the auxiliary bus.

Transferring the protection

The transfer breaker needs a protection that suits the circuit it replaces. There are two solutions:

  • Trip transfer. The bay protection keeps measuring, with its current transformers if they remain in the path, and its trip is switched to the transfer breaker. A selector switch or the logic does the switching, following the 89T position.
  • Own protection with a settings change. The transfer breaker has its own relay, and a settings group suited to the transferred circuit is activated.

The choice depends on where the current transformers are. If they are on the bay breaker side, which is under maintenance, the bay protection loses its measurement and only the second solution works. The transfer also affects the bus differential protection 87B, which must know which current belongs to the transfer bus and which zone to assign it to, and the 50BF, whose trip destination changes. Both solutions are covered in the guide on transferring protection to the transfer breaker.

Double bus with bypass and a combined coupler

When the coupler also serves as the transfer breaker, the logic must tell the two modes apart. As a coupler, it ties buses and is blocked against opening during on-load transfers between buses. As a transfer breaker, it replaces a circuit and is blocked against opening while that circuit depends on it. The safe approach is to determine the mode from the topology, that is from the disconnector positions, and not from a manual selector that can be left in the wrong position. While a circuit is bypassed, the substation loses the ability to transfer other bays between buses on load.

Implementation and testing

Condition 2 of the disconnector and the protection transfer are station-wide: they depend on every bay. In numerical substations each bay controller publishes the position of its 89T by GOOSE, and the IEC 61850-7-4 CILO logical node of each disconnector evaluates it. The test takes each bay into transfer, tries to transfer a second one, checks the trip transfer by injection and verifies that the transfer breaker does not accept an open command.

We help with your logic

Our team configures the transfer logic, the trip transfer and the settings groups in bay controllers and protective relays of the main brands, in high and extra-high voltage substations and in industry. See remote relay configuration and secondary engineering, or contact us.

References

  • IEC 60050-441, International Electrotechnical Vocabulary, 441-14-05 (disconnector).
  • IEC 62271-102:2018, Alternating current disconnectors and earthing switches, annex B (bus-transfer current switching).
  • IEC 61850-7-4, logical nodes CILO, CSWI and XSWI.
  • IEC 61936-1:2021, Power installations exceeding 1 kV AC, 6.2.16.
  • IEEE C37.234, Guide for Protective Relay Applications to Power System Buses.

Frequently asked questions

Why can only one circuit be transferred at a time?

Because the transfer breaker, or the coupler acting as one, has a single protection, set for the circuit it replaces. With two circuits transferred, a fault on either would open both, and the protection would not be set for either one in particular.

When may a bay transfer disconnector be closed?

With the transfer breaker open, when the transfer bus is dead, or with that breaker and the bay breaker closed, when both terminals of the disconnector are at the same potential. In both cases there is no significant change in voltage across its terminals when it closes.

What happens to the protection of the transferred circuit?

It must keep protecting it. Depending on the design, the bay protection is switched to trip the transfer breaker, or the transfer breaker protection takes on the circuit settings. If that transfer is not done, the circuit is left without adequate protection.