No guides on this topic for that voltage level. See all guides or write to us.
Designing, expanding or upgrading a substation?We do the primary engineering: bus arrangement, physical layout, earthing grid, station service and drawings for the grid operator.
Primary engineeringOther sections
ProtectionEvery ANSI function, protection schemes and teleprotection, relays and reclosers by model, and coordination fundamentals.Testing and commissioningWhat each test is and which standard defines it, protection testing and commissioning, by equipment and voltage level.Automation and communicationsIEC 61850 and the other protocols, SCADA, substation networks and clocks, control, interlocking and logic.Faults and tripsWhat to do after a trip, an alarm or a device that does not operate: likely causes, how to confirm them from the records and how to fix them.Solar energyStandards and permits in Colombia, PV components, solar park design and storage, testing, switching and solar equipment by brand.IndustryWhat a plant needs: maintenance, motors, drives and standby generation, transformers, power quality, its substation and load growth.Standards and grid connectionGrid connection requirements, the technical standards and the electrical studies they call for.