No guides on this topic for that voltage level. See all guides or write to us.
Trips and alarms
Downloading relay event reports and oscillography by brandWhat records a relay stores (events, SOE and COMTRADE oscillography), which software downloads them for each brand and what to keep after a trip.Resetting a relay after a trip: LEDs, 86 and recordsWhat is reset on a relay after a trip (LEDs, messages, 86 lockout relay, alarms), what not to erase before saving the events, and when not to reset.
A trip or an alarm nobody can explain?We read the events, oscillography and settings of your relays and deliver the cause, with evidence, and the fix it needs.
Relay trip analysisOther sections
ProtectionEvery ANSI function, protection schemes and teleprotection, relays and reclosers by model, and coordination fundamentals.SubstationsSubstation types and bus arrangements, design, earthing, station service and compact substations.Testing and commissioningWhat each test is and which standard defines it, protection testing and commissioning, by equipment and voltage level.Automation and communicationsIEC 61850 and the other protocols, SCADA, substation networks and clocks, control, interlocking and logic.Solar energyStandards and permits in Colombia, PV components, solar park design and storage, testing, switching and solar equipment by brand.IndustryWhat a plant needs: maintenance, motors, drives and standby generation, transformers, power quality, its substation and load growth.Standards and grid connectionGrid connection requirements, the technical standards and the electrical studies they call for.