GE Multilin 745 Relay: Transformer Protection

ANSI 87T

What the GE Multilin 745 relay is: two- or three-winding differential, overcurrent, frequency, overexcitation, records and communications.

By Shadai García, CEO and protection engineer at Tiza Group.

ATQ1Q2MTload87T2nd harmonic blockingtransformer de-energizedenergization: inrush current2nd harmonic > 15 %: 87T blocksQ2 closes: in service, Id ≈ 0internal transformer faultno 2nd harmonic: tripQ1 and Q2 open: transformer isolatedI restraintI differentialoperaterestraint15 %2nd harmonicblocksno blockingillustrative slopes and pickupIEC 61850PDIFPHARPTRCXCBR© tizagrp.comATQ1Q2MTload87T2nd harmonic blockingtransformer de-energizedenergization: inrush current2nd harmonic > 15 %: 87T blocksQ2 closes: in service, Id ≈ 0internal transformer faultno 2nd harmonic: tripQ1 and Q2 open: transformer isolatedI restraintI differentialoperaterestraint15 %2nd harmonicblocksno blockingillustrative slopes and pickupIEC 61850PDIFPHARPTRCXCBR© tizagrp.com
Transformer differential 87T: inrush blocked by 2nd harmonic, internal fault trips. Connection, operating characteristic and IEC 61850. Illustrative: actual values come from the settings study.
Short answer

The GE Multilin 745 is a management relay for power transformers with two or three windings. It combines dual-slope differential with harmonic restraint, per-winding overcurrent, frequency and overexcitation, and stores events, trends and waveform captures. It communicates over Modbus and DNP 3.0, with optional Ethernet.

What the 745 is

Short answer. The Multilin 745 is a protection and management relay for power transformers in GE’s Multilin family. It covers small, medium and large transformers, with two or three windings. Its core is the transformer differential (87T); to it are added per-winding overcurrent, frequency and overexcitation.

This sheet describes what the manufacturer specifies for the device. It contains no settings or procedures.

Protection functions

GroupFunctions (ANSI)
DifferentialThree-phase with dual percentage slope and harmonic restraint (87); unrestrained (87/50); optional restricted earth fault (87R)
Per windingInstantaneous phase, calculated neutral and ground overcurrent (50P, 50N, 50G); time phase, neutral and ground overcurrent (51P, 51N, 51G); instantaneous and time negative sequence (50_2, 51_2)
FrequencyUnderfrequency (81U), rate of change of frequency for load shedding (81R) and overfrequency (81O)
Voltage and fluxOverexcitation (24), when the relay is connected to a single-phase voltage transformer

The relay includes adaptive harmonic restraint, to tell inrush current from a fault, and adaptive time overcurrent elements, which adjust the pickup when the load carries harmonics. For function 24, see overexcitation protection.

The specifications also mention a harmonic derating factor and optional transformer loss-of-life monitoring. These are measurement and monitoring functions, not tripping functions.

Current transformer connection

The specification states that the relay automatically configures the compensation of the current transformers, so all of them are connected in wye. This avoids the special delta connections that older relays required. For the general criterion see vector group compensation in the 87T differential and CTs for transformer differential protection.

Records and analysis

  • Events: the last 256, with 1 ms time stamp.
  • Waveform capture: sampling at 64 times per cycle, up to 128 cycles, for phase currents, differential current, ground, voltages and digital inputs and outputs. Waveforms can be replayed with a simulation buffer.
  • Trends: parameter recording between 1 second and 1 hour, up to eight values.
  • Setting groups: up to four.

Communications

  • Front: RS232 with Modbus RTU.
  • Remote: two RS485 ports, one configurable as RS422, with Modbus RTU or DNP 3.0 level 2, up to 19 200 bit/s.
  • Optional Ethernet: 10BaseT with Modbus TCP.
  • Time synchronization: IRIG-B input.

The specification does not list IEC 61850. To integrate the relay into a SCADA, see gateway and redundant links to the control center.

Setting software

The manufacturer provides a Windows setting program with a graphical interface. The specification consulted says nothing more; that is why this sheet does not describe its menus. For an overview of GE tools see GE EnerVista software.

Services for the 745

At Tiza Group we review and set transformer relays remotely through our remote relay configuration and test the differential with secondary injection.

References

  • GE Multilin, “745 Guideform Specifications” (manufacturer specification, 2006).
  • ANSI/IEEE C37.2: device function numbers.

Frequently asked questions

Is the 745 suitable for two- and three-winding transformers?

Yes. The manufacturer's specification calls for options for two or three restraint windings. The number of windings is defined when ordering the relay.

What does the 745 differential function protect?

The three-phase differential with dual percentage slope and harmonic restraint, which prevents trips due to inrush current, and an unrestrained differential for high-magnitude internal faults. Restricted earth fault (87R) is optional.

What communications does the 745 have?

A front RS232 port with Modbus RTU, two remote RS485 ports (one configurable as RS422) with Modbus RTU or DNP 3.0 level 2, and an optional 10BaseT Ethernet port with Modbus TCP. It includes an IRIG-B synchronization input.