Tiza Group

Home / Guides / Industry and automation

VFD Harmonics: Effects and Solutions

Why variable frequency drives generate harmonics, what damage they cause in a plant (capacitors, transformers, nuisance trips) and which solutions exist.

By Shadai García, CEO and protection engineer at Tiza Group.

gridMT/BTPCCPQClass A analyzerdetuning reactorbank~~MVFD~=active filterthe drive injects 5th and 7th harmonicsbank without reactor: resonance near the 5threactor and filter: below limitsvoltage at the PCC almost sinusoidaldrive currentZ(h) sweephr ≈ √(Ssc/Qc)Z(h) sweepvoltage at the PCCbeforeafterIh at the PCCIEEE 519 limit571113order hStudyClass A measurementZ(h) modelLimits at the PCCSolution© tizagrp.comgridMT/BTPCCPQClass A analyzerdetuning reactorbank~~MVFD~=active filterthe drive injects 5th and 7th harmonicsbank without reactor: resonance near the 5threactor and filter: below limitsvoltage at the PCC almost sinusoidaldrive currentZ(h) sweephr ≈ √(Ssc/Qc)Z(h) sweepvoltage at the PCCbeforeafterIh at the PCCIEEE 519 limit571113order hStudyClass A measurementZ(h) modelLimits at the PCCSolution© tizagrp.com
Harmonic study: spectrum, resonance and solution at the PCC. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

A variable frequency drive with a six-pulse diode rectifier draws current from the supply in pulses, not as a sine wave, and that current contains harmonics of order 5, 7, 11, 13 and higher. Harmonics heat transformers and cables, overload and resonate capacitor banks, distort the voltage and cause trips and equipment failures. They are controlled with reactors, higher-pulse or active rectifiers, passive or active filters and detuned banks, depending on what the measurement shows against IEEE 519.

Why a drive generates harmonics

Most low-voltage variable frequency drives have a six-pulse diode rectifier at the input that charges a DC bus with capacitors. The diodes conduct only when the supply voltage exceeds the bus voltage, so the input current is not a sine wave. It is a set of pulses near the peak of each half cycle.

That waveform breaks down into a fundamental plus harmonics, currents at multiples of the supply frequency. In a six-pulse rectifier the characteristic harmonics are of order 6k ± 1: 5th, 7th, 11th, 13th, and so on, with the 5th and 7th the largest. The more drives and the more power, the larger the harmonic current the plant injects into its network.

Current distortion is measured as THDi (total harmonic distortion of current) or, to compare with IEEE 519, as TDD (total demand distortion), referred to maximum demand. As these currents flow through the network impedances, they also distort the voltage (THDv), which is what affects the other equipment.

What damage they cause

EffectWhy it happens
Hot transformersHarmonic currents increase eddy-current losses in the windings; a transformer can overheat without being overloaded in kVA
Failing capacitorsResonance between the bank and the network, and overload from harmonic currents
Nuisance tripsBreakers and relays that misread distorted waveforms; capacitor fuses that blow
Electronics failuresPower supplies, PLCs and sensitive equipment fed with distorted voltage
Hot cables and connectionsMore RMS current for the same useful power
Low power factorDistortion lowers the true power factor, even if the displacement power factor is good

The costliest case in industry is a capacitor bank without detuning in a plant full of drives. The two guides on the reactive power cost problem are power factor in industry and capacitor bank.

One effect is often overlooked: the drive harmonic currents are also “seen” by on-site generation. A standby generator set has a much higher impedance than the grid, so the same harmonic current produces more voltage distortion when the generator runs in island mode. Drives that work well on the grid can cause problems with the generator.

What IEEE 519 says

IEEE 519-2022 sets voltage and current distortion limits at the point of common coupling (PCC), the point where the plant connects to the grid and where its harmonics can affect other users. Voltage limits depend on the voltage level at the PCC. Current limits depend on the ratio between the available short-circuit current and the plant maximum demand current: the weaker the grid compared with the load, the stricter the limit.

Two practical consequences. First, compliance is assessed at the PCC, not at each drive. Second, the same drive can be acceptable in a plant with a strong grid and problematic in another with a weak grid or on-site generation. The tables and the method are in harmonic study under IEEE 519. Further detail on the IEEE 1531 criteria for applying and specifying passive filters: harmonic filters and the IEEE 1531 criteria.

The solutions

SolutionHow it worksWhen it fits
Line reactor or DC chokeSmooths the current pulses and reduces distortionFirst step, low cost, on almost any drive
12- or 18-pulse rectifierCancels low-order harmonics with phase-shifted transformersLarge drives
Active rectifier (AFE)Draws almost sinusoidal currentNew, regenerative drives or demanding networks
Tuned passive filterGives a low-impedance path to one specific harmonicA few large drives with a stable load
Active filterInjects currents that cancel the measured harmonicsMany drives, variable load, several orders
Detuned bankCompensates reactive power with a series reactor that moves resonance below the 5th harmonicPlants that need compensation and have drives

There is no universal solution. Choosing without measuring usually ends in a filter that falls short or one that is oversized.

Harmonics are not the only drive effect

On the motor side, the drive output produces fast voltage edges that, with long cables, cause overvoltages at the terminals and bearing currents. That is a different problem with different solutions (dv/dt or sine filters, suitable cables and grounding). For protection of a motor fed by a drive, see motor protection relay.

Signs that your plant has a harmonics problem

  • Capacitor fuses that blow or capacitors that swell.
  • A transformer that runs hotter than its kVA load would justify.
  • Breakers or relays that trip for no apparent reason when the drives start.
  • PLCs, computers or drives that reset or fail without explanation.
  • Differences between what different instruments measure at the same point.
  • A power factor that does not improve even though compensation was added.

How it is diagnosed

  1. Measure with a Class A power quality analyzer at the main switchboard and at the boards with drives, over a representative operating cycle. See power quality analyzer.
  2. Identify the sources and the dominant harmonic orders.
  3. Model the network: transformer, cables, capacitors and the external grid impedance, to find resonances.
  4. Compare with IEEE 519 at the PCC and decide the solution.

How we help

Our team carries out harmonic and power quality studies for industrial plants. We measure, model the network and its resonances, compare against IEEE 519 and recommend the technically and economically suitable solution, with the specification to buy it. We do the analysis and design remotely, worldwide. In Colombia, or elsewhere on request, we also measure and verify on site after installation.

See our power quality service or write to us telling us how many drives you have and what is failing.

References

  • IEEE 519-2022, Standard for Harmonic Control in Electric Power Systems.
  • IEC 61000-4-7, measurement techniques for harmonics and interharmonics.
  • IEC 61000-4-30, power quality measurement methods (Class A).
  • IEEE C57.110, Recommended Practice for Establishing Liquid-Immersed and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents.
  • IEEE 18, Standard for Shunt Power Capacitors.

Frequently asked questions

Which harmonics do variable frequency drives generate?

A drive with a six-pulse rectifier mainly generates harmonics of order 6k ± 1: 5th, 7th, 11th, 13th and higher, with the 5th and 7th the largest. With twelve-pulse rectifiers the dominant ones become the 11th and 13th, and with an active front end (AFE) the current distortion is much lower.

Why do capacitors burn out in a plant with drives?

Because the capacitor bank and the network inductance form a resonant circuit. If its resonant frequency falls near a harmonic the drives inject, that harmonic is amplified, overloads the capacitors and raises the voltage. It is avoided with detuning reactors or by changing the type of compensation, as the study indicates.

Which is better for drive harmonics: a passive or an active filter?

It depends on the load. A tuned passive filter is robust and economical for one or a few large drives with a stable load; an active filter adapts to variable loads and to several harmonic orders at once. Sometimes the simplest option, a line reactor or a drive with more pulses, is enough. The choice comes from measurement and study.

WhatsApp