Tiza Group

Home / Guides / Testing, commissioning and faults

Similar Transformer: When No Short-Circuit Test Is Needed

What a similar transformer is under IEC 60076-5, the nine criteria it must meet against the reference unit and how it is assessed without a test.

By Shadai García, CEO and protection engineer at Tiza Group.

1Same type of operationmatch2Same conceptual designmatch3Same winding arrangementmatch4Same conductor typematch5Same main winding typematch6Short-circuit apparent power: 30 to 130 %numeric7Forces and stresses: up to 120 %numeric8Same manufacturing processesmatch9Same clamping and supportmatchAnnex B: nine criteria of the assessed transformershort-circuit apparent power (S / z)forces and stresses0 %100 %150 %short-circuit apparent power against the reference's30 %130 %ref.0 %100 %150 %forces and stresses against the reference's120 %ref.ChainReference9 criteriaPowerForces© tizagrp.com1Same type of operationmatch2Same conceptual designmatch3Same winding arrangementmatch4Same conductor typematch5Same main winding typematch6Short-circuit apparent power: 30 to 130 %numeric7Forces and stresses: up to 120 %numeric8Same manufacturing processesmatch9Same clamping and supportmatchAnnex B: nine criteria of the assessed transformershort-circuit apparent power (S / z)forces and stresses0 %100 %150 %short-circuit apparent power against the reference's30 %130 %ref.0 %100 %150 %forces and stresses against the reference's120 %ref.ChainReference9 criteriaPowerForces© tizagrp.com
Similar transformer per IEC 60076-5 Annex B: nine criteria and the two numeric ones, apparent power of 30 to 130 % and forces up to 120 % of the reference. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

A transformer is similar to a reference transformer that has already passed a short-circuit test if it shares nine design and manufacturing characteristics and its short-circuit apparent power is between 30% and 130% of the reference's. Under that condition, IEC 60076-5 allows dynamic withstand to be demonstrated by calculation, without testing the unit.

Why the concept exists

Testing a power transformer for short circuit is not always possible. Large transformers sometimes exceed the capacity of test stations. That is why IEC 60076-5 allows, if purchaser and manufacturer agree before the order, dynamic withstand to be demonstrated by calculation and design and manufacturing considerations (clause 4.2.1). For more on the short-circuit test procedure for a transformer: transformer short-circuit test.

One way to do that is to compare the transformer with another one that has already been tested successfully, called the reference transformer. That comparison is valid only if the transformer being assessed is similar to the reference. Annex B, which is informative, defines when it is.

The nine criteria of Annex B

A transformer is similar to a reference transformer if they share these characteristics:

#CriterionExamples given by the standard
1Same type of operationGenerator step-up, distribution, interconnection
2Same conceptual designDry-type or oil-immersed; core with concentric, sandwich or shell-type windings; circular or non-circular coils
3Same arrangement and geometric sequence of the main windings
4Same conductor typeAluminum, aluminum alloy, annealed or hardened copper, foil, wire, flat conductor, continuously transposed conductor and epoxy bonding if used
5Same type of main windingHelical, disc, layer, pancake coil
6Short-circuit apparent power between 30% and 130% of the reference’sRated power divided by per-unit impedance
7Axial forces and winding stresses in short circuit not exceeding 120% of the reference’s
8Same manufacturing processes
9Same winding clamping and support system

Criteria 6 and 7 are numerical. The others are about matching the design.

How the power criterion is applied

Short-circuit apparent power is the rated power divided by the per-unit short-circuit impedance.

Take a 100 MVA reference transformer with 12% impedance. Its short-circuit apparent power is 100 / 0.12 = 833 MVA. The similarity range goes from 30% to 130% of that value, that is, from 250 to 1,083 MVA. More on the thermal short-circuit withstand over 2 s in thermal short-circuit withstand of 2 s.

  • A 60 MVA transformer with 11% has 545 MVA. It is inside the range.
  • A 150 MVA transformer with 10% has 1,500 MVA. It is outside.

Meeting this is not enough. The other eight criteria must be met too.

When the reference is accepted

Annex A, clause A.3.3.2.1, adds conditions for a transformer to serve as a reference:

  • It is similar to the one being assessed.
  • It was designed with basically the same calculation methods and the same mechanical strength criteria.
  • It was manufactured with basically the same practices, quality assurance and quality control instructions.
  • The validity range of the short-circuit design rules covers the characteristics of both.
  • It passed the short-circuit test successfully.

In addition, the test report, the main electromagnetic design data, the calculations and mechanical criteria used, and the manufacturing and quality practices are examined.

If the manufacturer does not have a single suitable reference, clause A.2 allows the transformer to be compared with several tested ones, provided each Annex B characteristic matches that of at least one of them. The standard gives an example: in a three-phase autotransformer with a reduced-capacity delta tertiary, the series and common windings are compared with an autotransformer without tertiary, and the tertiary with a three-phase transformer that has a tested reduced-capacity tertiary.

Comparing forces and stresses

If the reference is acceptable, clause A.3.3.2.2 requires first comparing the winding structures, the main insulation and the clamping system. It must be possible to conclude that the assessed transformer is, in principle, as robust as the reference in its basic mechanical structure.

Then the forces and stresses of each are compared, in Tables A.1 or A.2. The transformer is considered suitable if no figure exceeds 1.2 times that calculated for the reference. There are exceptions in core-type transformers, where the limit drops to 1.1 times: the average compressive stress in disc, helical and single-layer windings, the equivalent compressive stress in multi-layer ones, and the thrust on the low-voltage lead-outs. On the forces a short circuit produces in the windings, read short-circuit forces in transformer windings.

Assessment against a tested reference
  • Does it meet the nine similarity criteria with a reference that passed the test?
    • Yes: Does any force or stress exceed 1.2 times the reference's?
      • No: Suitable by design review
      • Yes: Not suitable, the design is reviewed
    • No: Test, or verification with the manufacturer's design rules

Who declares similarity

The Annex B criteria do not declare that a given transformer is similar to another. That conclusion comes from the design review with the manufacturer’s complete documentation. The information the manufacturer provides remains its intellectual property and must be kept confidential (clause A.3.4).

Category and test

Annex A applies mostly to categories II and III. For category I, which is normally bought in batches, the standard prefers testing one or two units from the batch, because it considers that the quickest and cheapest way to verify conformity. It also admits a design review. The categories are defined by rated power: up to 2,500 kVA, from 2,501 to 100,000 kVA and above 100,000 kVA. Further detail on the short-circuit withstand categories and the design current: short-circuit withstand: categories and design current.

What to ask for as purchaser

  1. Decide the demonstration method before the order and put it in writing.
  2. If a design review is accepted, ask for the reference test report and the comparison in Tables A.1 or A.2.
  3. Ask for the written statement of a positive result. It does not release the manufacturer from its obligations on the transformer’s withstand capability.

We can help with the specification and the tests

At Tiza Group we carry out short-circuit studies that give the short-circuit power and fault current at your transformer’s point of connection, data you must hand to the manufacturer, remotely and worldwide. We also measure short-circuit impedance and FRA on site, to compare them with the factory reference, in Colombia, or elsewhere on request. Contact us with the single-line diagram and the nameplate.

References

  • IEC 60076-5, Power transformers – Part 5: Ability to withstand short circuit, clause 4.2.1 and Annexes A and B (informative).

Frequently asked questions

What does short-circuit apparent power mean?

It is the rated power divided by the per-unit short-circuit impedance (Annex B of IEC 60076-5). A 100 MVA transformer with 12% impedance has 833 MVA. To be similar, the transformer being assessed must fall between 30% and 130% of that value, that is, between 250 and 1,083 MVA.

Is a transformer similar just because it has the same power and voltage?

No. Power and voltage are not enough. Annex B also requires the same type of operation, the same conceptual design, the same winding arrangement, the same conductor type, the same winding type, the same manufacturing processes and the same winding clamping and support. It also limits axial forces and winding stresses to a maximum of 120% of the reference's.

Who decides whether a transformer is similar?

It is decided in the Annex A design review, with the manufacturer's documentation. The positive conclusion is formally acknowledged in a written statement agreed by purchaser and manufacturer (clause A.3.4). The purchaser must have accepted before the order that the demonstration will be by calculation (clause 4.2.1).

WhatsApp