Huawei LUNA2000 Battery: S0, S1 and 200KWH Explained

Huawei LUNA2000-5/10/15-S0, LUNA2000-S1 and LUNA2000-97/129/161/200KWH batteries: modules, parts, power, communication and SUN2000 inverter connection.

By Shadai García, CEO and protection engineer at Tiza Group.

utility gridPC67/32BT/MT~=PCSbatteriesBMSfire protectionEMScontrol center12345charge: the grid feeds the batteriesidledischarge: the batteries export to the gridSoCP to gridtdischargeloadno fault: the PCS reverses the power flowChainBMSPCSTransformerGrid connectionEMS/SCADA© tizagrp.comutility gridPC67/32BT/MT~=PCSbatteriesBMSfire protectionEMScontrol center12345charge: the grid feeds the batteriesidledischarge: the batteries export to the gridSoCP to gridtdischargeloadno fault: the PCS reverses the power flowChainBMSPCSTransformerGrid connectionEMS/SCADA© tizagrp.com
BESS commissioning: from the BMS to the point of interconnection. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

LUNA2000 is Huawei FusionSolar's battery storage family. The LUNA2000-5/10/15-S0 and the LUNA2000-S1 are residential lithium iron phosphate batteries with a power module and stackable battery modules, connected to SUN2000 hybrid inverters; the LUNA2000-97/129/161/200KWH is a commercial and industrial cabinet system with its own control.

What it is and where it is used

LUNA2000 is the name Huawei (FusionSolar line of Huawei Digital Power) gives to its batteries for solar systems. They are lithium iron phosphate (LiFePO4) batteries that are DC-coupled to a SUN2000 hybrid inverter, and they come in three families: the residential LUNA2000-5/10/15-S0, the residential LUNA2000-5/7/10/…/21-S1 and the commercial and industrial LUNA2000-97/129/161/200KWH system.

They are used to store the day’s solar surplus, supply loads at night, back up essential loads when the grid goes out and, in the commercial system, reduce demand peaks. They are a component of photovoltaic systems. For the inverter they connect to, see Huawei SUN2000 inverter and SmartLogger.

Which battery models Huawei or its distributors offer in each country is confirmed directly with them.

Variants: LUNA2000-S0, S1 and 200KWH

ModelApplicationMain difference
LUNA2000-5-S0 / 10-S0 / 15-S0ResidentialLUNA2000-5KW-C0 power module and one to three LUNA2000-5-E0 battery modules of 5 kWh: 5, 10 or 15 kWh usable
LUNA2000-S1 (5/7/10/12/14/15/17/19/21)ResidentialLUNA2000-10KW-C1 power module and LUNA2000-5-E1 (5 kWh) and LUNA2000-7-E1 (6.9 kWh) modules, combinable: from 5 to 20.7 kWh
LUNA2000-97KWH-1H1Commercial and industrialSix packs in series (6S1P), 96.8 kWh
LUNA2000-129KWH-2H1Commercial and industrial8S1P, 129.0 kWh
LUNA2000-161KWH-2H1Commercial and industrial10S1P, 161.3 kWh
LUNA2000-200KWH-2H1Commercial and industrial12S1P, 193.5 kWh of maximum capacity

Huawei warns in its sheet that the 97, 129 and 161 kWh versions are not offered in mainland China or Japan; availability by country is defined by Huawei.

Main features

  • LUNA2000-S0. Huawei’s sheet gives 2.5 kW continuous with one battery module and 5 kW with two or three, with peaks of 3.5 and 7 kW for 10 s. The assembly has an IP66 protection rating, operates from -20 to 55 °C, is cooled by natural convection and its operating voltage is 350 to 560 V single-phase and 600 to 980 V three-phase.
  • LUNA2000-S1. It supports one to three battery modules per power module and up to four systems in parallel. Charge and discharge power is 3.5, 7 and 10.5 kW depending on the configuration. It has IP66 and RS485, FE and CAN communication, the latter only between systems in parallel.
  • LUNA2000-97/129/161/200KWH. Outdoor cabinet system, IP55, from -30 to 55 °C. It includes industrial air conditioning, fire suppression, type II DC surge protection and a 220 V AC auxiliary supply. It supports up to 20 systems in parallel, although Huawei’s table applies to sets of up to five.
  • Safety. The sheets list certifications such as IEC 62619 and UN 38.3 for the residential models, and UL 9540A and IEC/EN equipment safety standards for the commercial cabinet. Check in the certificate for your region which ones apply.

Communications and integration

The residential battery has no direct connection of its own to the cloud: it communicates with the SUN2000 inverter through the communication port, and the inverter reports it to the FusionSolar platform. The smart power sensor (Smart Power Sensor) at the connection point also uses the inverter’s RS485, so the connection is made following the manufacturer’s guide. The commercial system uses Ethernet or SFP and Modbus TCP, according to the manufacturer’s sheet.

The residential battery is DC-coupled to the hybrid inverter; AC or DC coupling is explained in hybrid solar system with batteries. The parts of a BESS are in BESS: parts, functions and standards. For the complete storage system and its tests, see BESS commissioning.

Frequently asked technical questions

  • LUNA2000 manual: Huawei publishes the user manual for each series (for example, the LUNA2000-S1 manual has a September 2025 edition). Use the one for your series and the inverter firmware.
  • The battery does not charge or is not detected: check the inverter firmware version, the communication signal and the series compatibility before the battery itself.
  • Backup during a grid failure: it depends on the inverter and on how many battery modules there are. Huawei states, for example, a minimum number of modules to operate in island mode with certain inverter series.
  • Service life and warranty: the terms are set by Huawei by region and are not summarized here.

What to check before specifying a LUNA2000 battery

  • Inverter series. Compatibility depends on the series and the firmware version of the SUN2000 inverter. Huawei states, for example, minimum updates for some series and that only certain series support four batteries in parallel.
  • Phase and voltage. The residential battery works in a range of 350 to 560 V for single-phase systems and 600 to 980 V for three-phase; the inverter defines which one applies.
  • Location. The IP66 rating allows outdoor installation, but Huawei gives a temperature range of -20 to 55 °C and a maximum altitude of 4000 m with derating above 2000 m; check the site.
  • Meter. The Smart Power Sensor at the connection point is part of the system; export control and backup depend on it.
  • Commercial system. The LUNA2000-200KWH-2H1 requires a foundation, an AC supply, communication to the control system and the site’s fire safety plan; these requirements are defined in the project and with the utility.

How we help

Our scope is the electrical part that connects the system to the grid: protection at the point of connection, interconnection studies and commissioning. If your project with Huawei batteries needs the interconnection protection defined, see the interconnection study; for commissioning a plant with storage, see solar plant commissioning, which we carry out in Colombia, or elsewhere on request. Write to us through the contact page.

References

  • Huawei FusionSolar, specifications for LUNA2000-5/10/15-S0, LUNA2000-5/7/10/…/21-S1 and LUNA2000-97/129/161/200KWH, and the LUNA2000-S1 user manual.
  • IEC 62619; IEC 62933 for storage systems; UN 38.3.

Frequently asked questions

How many kWh does the Huawei LUNA2000-15-S0 battery have?

According to Huawei's specification sheet, the LUNA2000-15-S0 has three 5 kWh battery modules (LUNA2000-5-E0), that is, 15 kWh of usable energy measured at 100% depth of discharge, at 0.2 C and 25 °C, at beginning of life. The 5 and 10 kWh versions use one and two modules.

Which inverter does a LUNA2000 battery connect to?

To Huawei SUN2000 family hybrid inverters, and the list depends on the battery series. Huawei publishes a compatibility table by series, firmware version and number of batteries in parallel; check it before specifying, because not every combination is valid.

What is the LUNA2000-200KWH-2H1?

It is a Huawei cabinet energy storage system for commercial and industrial applications, with 12 battery packs, 193.5 kWh of maximum capacity and charge and discharge power of up to 100 kW according to its specification sheet. It is installed outdoors and includes industrial air conditioning and fire suppression.