Tiza Group

Home / Guides / Testing, commissioning and faults / Before hiring

Before hiring

Testing, commissioning and faults

BT, MT, AT, EATPre-Commissioning, Commissioning and Start-Up ExplainedWhat commissioning is, how it differs from pre-commissioning and start-up, and what each stage covers on a substation or plant, with the English terms.BT, MT, ATCommissioning levels 1 to 5: what they areWhat commissioning levels 1 to 5 are, where they come from and how they map to FAT, SAT, system tests and integrated systems testing in substations.MT, AT, EATWhat to Require in a Protection Test ReportWhat a protection test report must contain: settings, injected points, times, breaker trip, calibration and the evidence a utility expects in practice.MT, AT, EATIs Remote Relay Configuration Secure?What makes remote relay configuration secure: IEC 62351, IEC 62443 segmentation, authorized-only access and logging. We can configure your relays remotely.MT/AT/EATSubstation SAS Specification: What the Tender Must RequireWhat a SAS specification must define: architecture, availability, protocols, signals, cybersecurity, FAT and SAT, deliverables and no brand lock-in.BT, MTHow to Review a Third-Party Coordination StudyA 20-point checklist for reviewing a protection coordination study made by another firm, with a timing mismatch worked example. We review the study.BT, MTWhat a Protection Coordination Study CostsWhat drives the price of a protection coordination study: settings, scenarios, data and review rounds, with a worked example. We can run this study.BT, MTWhat to Ask For in a Protection Study QuoteThe six points a protection study quote must state: scope, assumptions, scenarios, deliverables, reviews and deadline, with a worked comparison example.MT, AT, EATHow to Quote Power Transformer TestingWhat changes the scope and cost of power transformer testing, what information to send for a quote and what the test report must contain for acceptance.

Other topics in this section

WhatsApp