Home / Guides / Testing, commissioning and faults / CTs and VTs
CTs and VTs
Testing, commissioning and faults
CT Excitation and Knee Point: What It Is, What It FindsWhat a CT excitation curve measures, how IEC 61869-2 and IEEE C57.13 define the knee point, which defects it reveals and how the results are interpreted.ANSI 87BCT for Busbar 87B and Line 87L DifferentialWhat busbar 87B and line 87L differential protection ask of their CTs: extreme saturation, different ratios and anti-remanence type, per IEC TR 61869-100.MT/AT/EAT5P and 10P Protection CT Classes: Accuracy Limit FactorWhat 5P20 means on a protection CT: composite error limit, accuracy limit factor (ALF), how it differs from class PR per IEC 61869-2 and why it matters.AT/EATCT Duty Cycles: C-O and C-O-C-OWhat the C-O and C-O-C-O duty cycles of IEC 61869-2 are, what t′al, t′, tfr and t″al measure, and how reclosing and remanence affect CT sizing.ANSI 87TCT for 87T Transformer Differential: SpecificationWhat the 87T differential asks of its CTs: external and internal faults, ratio matched to the transformer and low-remanence classes, per IEC TR 61869-100.MT/AT/EATRemanence and Air Gap in a Current TransformerWhat causes remanence in a CT, how it affects protection and how an air gap in the core limits it, per IEC 61869-2 and IEC TR 61869-100 in practice.MT/AT/EAT3P and 6P Classes of a Protection Voltage TransformerWhat classes 3P and 6P of IEC 61869-3 and -5 mean: 3 and 6 % errors, phase displacement, 2 to 100 % voltages, voltage factor and tests step by step.ANSI 50/51CT for Overcurrent Protection: Which Class to UseCT saturation in 50/51 overcurrent protection and how to choose the accuracy limit factor and burden, per IEC TR 61869-100. We do the engineering design.AT/EATWho Sizes the Protection CT: IEC TR 61869-100Who decides the oversizing of a protection CT: relay manufacturer, system designer and CT manufacturer, according to IEC TR 61869-100 and IEC 61869-2.MT/AT/EATEquivalences Between Protection CT Classes (IEC 61869-2)How the IEC 61869-2 classes P, PR, PX, PXR, TPX, TPY and TPZ relate through their limiting e.m.f., and why the designation cannot always be swapped.