Home / Guides / Testing, commissioning and faults / Trips and fault analysis
Trips and fault analysis
Testing, commissioning and faults
MT/AT/EATTrip Circuit Supervision Alarm (74TC): Causes and FixesWhat to do about a 74TC trip circuit alarm: open coil or wiring, 52b path, control voltage, input threshold and intermittent alarms. We configure remotely.MT/AT/EATPower System Fault Analysis: From Trip to Root CauseHow to analyze a fault or protection trip: records, sequence of events, oscillography, settings and likely causes. We can review the records remotely.MT/AT/EATCircuit Breaker Will Not Close: Causes and DiagnosisWhy a circuit breaker will not close: uncharged springs, unreset 86 lockout, interlocks, synchro-check or latched anti-pump, and how to diagnose each.MT/AT/EATDC Ground Fault Alarm: How to Locate the FaultWhat the DC ground alarm (64) means, how to locate the fault, why a second ground can cause false trips and how to isolate it safely while in service.MT/AT/EATSF6 Low Pressure Alarm: Causes and What to DoWhat to do when a low SF6 density alarm appears on a circuit breaker or GIS: real leak, temperature effect, faulty monitor, short fill and first checks.MT/AT/EATVT Fuse Fail Alarm: Loss of Potential ExplainedWhat the loss of potential (VT fuse failure) alarm means, which functions it blocks, why it appears without a VT fault and how to diagnose it in service.MT/AT/EATHow to Read a Fault Oscillography Step by StepInterpreting an oscillography: pre-fault, fault and clearing, phasors, symmetrical components, DC offset, CT saturation and pole timing. We review records.ANSI 63Buchholz or Sudden Pressure Relay Trip: What to DoWhat a Buchholz or sudden pressure relay trip or alarm means, how the gas is analyzed and what to verify, in order, before re-energizing the transformer.BT/MT/AT/EATHot Terminals and Connections: Causes and What to DoWhy terminals and connections overheat in substations and panels: loose torque, oxidation, copper-aluminum joints, bad crimps or overload.MT/AT/EATTransformer Trip on Energization: Causes and DiagnosisWhy an 87T or 50 trips when a transformer is energized: magnetizing inrush, second harmonic, residual flux and sympathetic inrush. We can run the study.