Tiza Group

Home / Guides / Testing, commissioning and faults / Test equipment

Test equipment

Testing, commissioning and faults

MT, AT, EATOMICRON CPC 100: Power Transformer TestingWhat the OMICRON CPC 100 is, which outputs it has and which power transformer tests it covers, from winding ratio to power factor with its accessories.MT/AT/EATOMICRON CMC 356, CMC 430 and Test Universe Relay TestersOMICRON CMC 356, CMC 430, CMC 353 and CMC 310 relay test sets with Test Universe and RelaySimTest: what they are, uses, GOOSE and IEC 61850 support.MT, AT, EATOMICRON CPX 200: Current and Voltage InjectionOMICRON CPX 200: a modular primary injection system with a high-current module and HVX10 for transformer, CT, VT and breaker tests, and how it is used.Secondary injection relay test set: what it isWhat a secondary injection relay test set is, what it generates and measures, which types exist (including IEC 61850) and what to check when choosing one.MT, AT, EATOMICRON CMC 500: Portable Secondary InjectionWhat the OMICRON CMC 500 is, the modular protective relay test set: variants, outputs, IEC 61850, safety, cybersecurity, test software and applications.BT, MT, ATOMICRON COMPANO 100: Primary and Secondary InjectionWhat the OMICRON COMPANO 100 is: a 10 kg battery test set, up to 110 A and 150 V, for basic protection, micro-ohm, timing, earthing and line impedance.MT, AT, EATOMICRON Test Universe and Protection Testing LibraryWhat OMICRON Test Universe and the Protection Testing Library are: test modules, templates by relay type, settings import and automatic test reports.MT, AT, EATOMICRON RelaySimTest: Protection Scheme TestingWhat OMICRON RelaySimTest is: software that simulates the primary network and validates the complete protection scheme, even across several substations.BT/MT/AT/EATDoble F6150e, Megger SMRT410 and Freja Relay Test SetsDoble F6150e, F6150sv and F8000, Megger SMRT410 and Freja 300, ISA DRTS and Ponovo relay test sets: what they are, variants, uses and what each tests.MT, AT, EATOMICRON CP TD1: Power Factor and Tan Delta TestingThe OMICRON CP TD accessory for the CPC 100: capacitance and dissipation factor (tan δ) up to 15 kV, where it is used and how to read the test result.

Other topics in this section

WhatsApp