Tiza Group

Home / Guides / Testing, commissioning and faults / What each test is

What each test is

Testing, commissioning and faults

BT, MT, AT, EATInsulation Resistance Test: IR, PI and DAR on TransformersWhat the insulation resistance (megger) test measures on transformers, what PI and DAR reveal and what distorts the result. We review your test records.MT, AT, EATInsulating Oil Analysis: Sampling, DGA and FuransWhat breakdown voltage, moisture, acidity, dissolved gases (DGA) and furans reveal about insulating oil, how to sample it and what applies to each asset.MT, AT, EATPower Factor and Tan Delta (tan δ) Testing ExplainedWhat tan δ and capacitance measure in windings, bushings, CTs and CVTs, which insulation defects they reveal and why temperature correction applies.MT, AT, EATSF6 Gas Analysis: Moisture, Purity and DecompositionSF6 gas analysis in breakers and GIS: moisture, purity, decomposition products and leaks, under IEC 60480 and IEC 62271-4, with what each test shows.MT, AT, EATPartial Discharge Testing: What It Is and Where It AppliesWhat partial discharges are, how they are measured (IEC 60270, UHF, acoustic), how a new GIS is verified and which equipment and levels they apply to.BT, MT, AT, EATContact Resistance Test for Breakers and SwitchgearWhat contact resistance measures in breakers, disconnectors and busbars, which defects it reveals, the current IEC and IEEE specify and how to read it.MTMedium-Voltage Motor Testing: What Is Measured and WhyWhat is measured on a medium-voltage motor and why: insulation and polarization index, winding resistance, surge test, tan delta and partial discharge.BT, MT, AT, EATCircuit Breaker Timing Test: What It MeasuresWhat a circuit breaker timing test measures: opening, closing, pole discrepancy, coils and minimum operating voltage, for AIS and GIS, per IEC 62271-100.BT, MT, AT, EATTransformer Winding Resistance Test: What It DetectsWhat winding resistance measures in power transformers, VTs and CTs, which defects it reveals, temperature correction and how to interpret the result.MT, AT, EATFirst energization of a new substation: what to checkFirst energization of a new substation: preconditions, general sequence, no-load and on-load checks, and when the installation is declared in service.

Other topics in this section

WhatsApp