Tiza Group

Home / Guides / Industry and automation / Power quality and energy

Power quality and energy

Industry and automation

BT/MTActive vs Passive Harmonic Filter: Which One to ChooseActive or passive harmonic filter in a plant with drives: how each works, resonance risk and when each one fits. We run the harmonic study beforehand.BT/MT/ATTHD: What It Is, How to Calculate It and IEEE 519 LimitsWhat THD is, how to calculate it, the difference between THDv, THDi and TDD and the IEEE 519-2022 limits at the connection point. We run the studies.BT/MTVFD Harmonics: Effects and SolutionsWhy variable frequency drives generate harmonics, what damage they cause in a plant (capacitors, transformers, nuisance trips) and which solutions exist.BT/MTSolar Panels and Power Factor: Why Reactive Charges RiseWhy power factor drops and reactive charges appear after installing solar panels at a plant, and how inverters and capacitor banks help to correct it.BT/MTVoltage Unbalance: Effect on Motors and MeasurementWhat voltage unbalance is, how it is calculated per NEMA and by negative sequence, why it overheats motors, what limit applies and how to correct it.BT/MTTransient Overvoltages in Plants: Causes and ProtectionTransient overvoltages in plants: lightning, switching and capacitor banks. Protection with zoned SPDs, surge arresters, grounding and SPD coordination.BT/MTCapacitor Bank Resonance: Why Banks FailWhy capacitors burn out and bank fuses blow: resonance with harmonics. How to detect it, how detuned reactors prevent it and how a harmonic study helps.BT/MT/ATCFE Low Power Factor Penalty: How It Is CalculatedHow CFE calculates the low power factor surcharge and the high power factor bonus: the official formula, step-by-step examples and large customer cases.BT/MTPower Quality in Industry: Problems and CausesPower quality problems in industrial plants: harmonics, sags, overvoltages, unbalance, flicker and reactive power. Causes, standards and measurement.

Other topics in this section

WhatsApp