Tiza Group

Home / Guides / Industry and automation / Industrial networks

Industrial networks

Industry and automation

BTModbus Register Map, Data Types, and PollingHow to design and read a Modbus register map: 16-bit registers, 32-bit integers and floats, scaling and polling time in practice. We configure it remotely.BTIO-Link: Smart Sensors and How They ConnectWhat IO-Link is, how master and devices connect, what process data and parameters give, and what to watch in wiring, cabling and commissioning in plants.BTSCADA: Architecture, Tags, and HistorianHow an industrial SCADA is structured: levels, servers, PLC and RTU communication, tag database, historian, alarms and sizing. We configure it remotely.BTOPC UA: What It Is, How It Works, and Why Use ItOPC UA: information model, client-server and publish-subscribe, certificate-based security, and when it is preferable to Modbus or PROFINET in plants.BTIndustrial Network Topologies and CablingStar, line, ring, and tree in industrial networks; RS-485 versus Ethernet, copper versus fiber, shielding, cable routing, and redundancy in a design.BTPROFIBUS and PROFINET: Differences and MigrationWhat PROFIBUS DP and PA and PROFINET IO are, how controller and devices communicate, what changes in wiring and diagnostics, and how to migrate.BTHMI Screen Design and Alarm ManagementHow to design a readable HMI and manage its alarms: screen hierarchy, color, priorities, alarm floods and alarm lifecycle. Remote setup is available.BTEtherNet/IP and CIP: Messages, Connections, DesignWhat EtherNet/IP and CIP are, how explicit and implicit messages differ, what RPI is, and what to watch in the network for controllers and I/O.

Other topics in this section

WhatsApp