Tiza Group

Home / Guides / Industry and automation / Variable frequency drives

Variable frequency drives

Industry and automation

BTSTO and SS1: Functional Safety in VFDsWhat the STO and SS1 functions of a VFD are, which stop category they act in, which standard defines them and how they fit a safety circuit in practice.BTPumping With a VFD: Application and ControlHow to apply a VFD to pumping: pressure or flow control, PID loop, minimum speed, starting, protections and installation errors. We configure it remotely.BTBasic VFD Parameters and What They MeanBasic drive parameters: motor nameplate data, control mode, command source, speed ramps, limits and protections, and the effect of each parameter group.BTWave Reflection and VFD Cable Length LimitsWhy a long cable between a VFD and motor causes overvoltage at the motor terminals, which factors make it worse and how the motor insulation is protected.BTV/f, Vector and DTC Control in VFDs: DifferencesDifferences between scalar V/f, sensorless and closed-loop vector control, and direct torque control (DTC) in drives, and how to pick one for your load.BT/MTIEEE 519 Harmonic Limits: Key Concepts, PCC and TDDWhat IEEE 519 sets for harmonics: point of common coupling, THD and TDD, short-circuit ratio, and who is responsible for voltage and for current.BTHow a Variable Frequency Drive Works: Stages and PWMHow a variable frequency drive (VFD) works: rectifier, DC bus, inverter and PWM, and why changing the output frequency changes motor speed in practice.BTEMC and Shielding for Variable Frequency DrivesHow to reduce VFD electromagnetic interference: IEC 61800-3 categories, RFI filter, shielded motor cable, 360° termination and high-frequency grounding.BTMotors for VFD Use: IEC 60034-25 and NEMA MG 1What a VFD-fed motor must meet: insulation, bearings, cooling and low-speed torque. What IEC 60034-25, IEC 60034-18-41 and NEMA MG 1 Part 31 cover.BTVFD Sizing and Derating: Current, Duty and SiteHow to size a variable frequency drive: motor current, load type and duty cycle, overload and derating for temperature, altitude and switching frequency.

Other topics in this section

WhatsApp