Tiza Group

Home / Guides / Industry and automation / Instrumentation and process control

Instrumentation and process control

Industry and automation

P&ID Diagrams and ISA 5.1 Instrument IdentificationWhat a P&ID is, how it differs from a PFD, how to read instrument tags under the ISA 5.1 convention and what it is used for in a project and its tags.Ziegler-Nichols Tuning and AlternativesHow to tune a PID with Ziegler-Nichols (ultimate gain and period), its limits and alternatives: relay, reaction curve and Cohen-Coon tuning for each loop.Control Loop: PV, SP and MV ExplainedWhat a closed control loop is: process variable, setpoint and manipulated variable, error, direct and reverse action, and how a loop is reviewed and tuned.PID Controller: What Each Action DoesWhat the P, I and D actions of a PID do, the parallel and standard forms, the effect of each gain, the derivative filter and common mistakes in practice.Inductive, Capacitive and Photoelectric SensorsHow inductive, capacitive and photoelectric proximity sensors work, what each one detects, how to select them and which installation mistakes to avoid.PID Windup and Limits: Causes and RemediesWhat integrator windup is in a PID, why it happens, how to prevent it and other limits such as dead time or valve stiction. We configure it remotely.Cascade, Ratio and Feedforward ControlWhen to use cascade, ratio and feedforward control to improve a PID loop, with requirements, examples and common mistakes. We configure it remotely.Industrial Pneumatics Basics: Components and ControlIndustrial pneumatics fundamentals: compressed air, FRL unit, cylinders, 5/2 valves, cylinder force, electrical valve control and safety step by step.Differential Pressure Flow MeasurementHow flow is measured with an orifice plate or Venturi: square root, beta ratio, taps, straight runs, limits and common installation errors in practice.Level and Pressure Measurement: Technologies and SelectionAbsolute, gauge and differential pressure; hydrostatic, ultrasonic, radar, float and capacitive level, with a numerical example and selection criteria.

Other topics in this section

WhatsApp