Home / Guides / Industry and automation / Functional safety and industrial cybersecurity
Functional safety and industrial cybersecurity
Industry and automation
BT, MTPredictive Maintenance of Motors and DrivesPredictive maintenance of motors and VFDs: vibration, thermography, current, insulation and capacitors; what each technique measures and when it pays off.BT, MTOT Network Segmentation: Zones and ConduitsHow to segment an industrial plant network: Purdue model, zones and conduits, DMZ, VLANs and firewalls, with design criteria and the most common mistakes.BT, MTFunctional Safety: SIL and PL Key ConceptsWhat functional safety is, how SIL and PL differ, when IEC 61508, IEC 61511, IEC 62061 and ISO 13849 apply and what a project must document in a project.BT, MTIndustrial Cybersecurity and IEC 62443: IntroductionHow the IEC 62443 series is organized for a manufacturing or process plant: roles, parts, security levels (SL) and where to start a security program.BT, MTAutomation Project Documentation: What to DeliverDocuments an industrial automation project delivers: scope, drawings, I/O list, functional description, FAT, SAT, as-built records, manuals and change log.