Home / Guides / Industry and automation / Plant substation and transformers
Plant substation and transformers
Industry and automation
MT/ATExpanding a Plant Substation: What to Check FirstWhat to check before expanding: capacity, short-circuit level, busbars and switchgear, protection, arc flash, space and local code. We do the study.MT/ATTransformer Overheating: Causes and RisksCauses of transformer overheating in a plant: overload, harmonics, cooling, high voltage and internal faults, and what is at risk for the equipment.MT/BTPole-Mounted Substation: Parts, Limits and ProtectionWhat a pole-mounted substation is, its parts, the transformer size limit on a pole, how it is protected and which tests it needs, in plain language.MT/BTPad-Mounted Substation: What It Is, Radial or LoopWhat a pad-mounted substation is, how it differs from a compact one, when to choose radial or loop arrangement and what the design covers. We design it.MT/ATIndustrial Substation: Parts, Types and ProtectionWhat an industrial substation is in a plant, its parts, the types available (pole, pad-mounted, compact, conventional) and how it is protected and metered.ANSI 49Overloaded Transformer: How to Tell and What It RisksHow to tell whether your plant transformer is overloaded, how much overload IEC 60076-7 and IEEE C57.91 allow, and what options you have. We do the study.MT/ATWhy Transformers Fail: Causes of Burnout and Next StepsWhy a transformer burns out: aged insulation, external short circuits, overvoltages, moisture and slow protection. What to check before re-energizing.MT/BTHow Many kVA Does Your Plant Need: Sizing a TransformerHow to estimate the kVA rating of a plant transformer: maximum demand, power factor, harmonics, motor starting, altitude and growth. We run the study.BTBusway Protection in Industrial PlantsHow a 600 V busway is protected: types, bolted and arcing faults, current-limiting fuses, ground fault protection and tests before energizing.BT/MT/ATWhy a Transformer Hums and When to WorryWhy a transformer hums: core magnetostriction, load and fans. Which noises are normal and which point to a problem, with diagnosis steps and checks.