Tiza Group

Home / Guides / Industry and automation / Plant maintenance

Plant maintenance

Industry and automation

MT/BTDry-Type Transformer Maintenance, Temperature, TestsDry-type transformer maintenance: normal temperature, thermal class F and H, RTD probes and temperature relay, cleaning, moisture and electrical tests.BT, MTSwitchgear and MCC commissioning: tests and checksCommissioning LV switchgear, panels and MCCs: IEC 61439 routine verification, FAT and SAT, insulation, functional tests, interlocks and energization.MT/BTSpain Transformation Centers: Maintenance and InspectionSpanish transformer substation: maintenance contract (ITC-RAT 22), inspection every three years (ITC-RAT 23), what is checked and who signs it in practice.BT, MT, AT, EATInfrared Thermography: What It Detects and How to Read ItWhat infrared thermography detects in electrical equipment, why it is done under load, how a hot spot is classified (ΔT) and how to read the report.MT/AT/EATHow Often Should a Substation Be Maintained?How often an electrical substation needs maintenance: what sets the frequency under local code, NFPA 70B and NETA, and what shortens or lengthens it.MT/AT/EATSubstation Maintenance Report: What It Must IncludeWhat a substation maintenance report must contain: scope, data per asset, results with criteria, comparison with the prior test, findings and appendices.MTMV Switchgear Maintenance: What Gets InspectedWhat to check in medium-voltage switchgear maintenance: busbars, insulators, breaker, withdrawable truck, interlocks, auxiliaries and electrical tests.BT/MT/ATNFPA 70B: Electrical Maintenance Is Now a StandardWhat NFPA 70B is, what changed when it went from recommended practice to standard, the 2026 edition, the maintenance program (EMP) and how to use it.BT/MT/AT/EATElectrical predictive maintenance: techniques and useWhat electrical predictive maintenance is, which techniques it uses on transformers, switchgear and cables, what each one detects and when it pays off.

Other topics in this section

WhatsApp