Home / Guides / Industry and automation / Motors and starting
Motors and starting
Industry and automation
BT/MTComAp InteliGen: What It Is, Models and UsesWhat the ComAp InteliGen is, how it differs from the InteliLite and InteliMains, and what the InteliGen 500 G2 datasheet shows. We configure it remotely.BT/MTSiemens SINAMICS G120, S120 and Perfect Harmony DrivesSiemens SINAMICS G120, G120C, G120X and S120 drives, plus medium-voltage Perfect Harmony GH180 and GM150: variants, motor protection and SCADA links.BTDirect-On-Line Motor Starting: Power and ControlDirect-on-line (DOL) motor starting: power and control circuit, device components, starting current, protection coordination and typical wiring mistakes.BT/MTDEIF AGC 150, AGC-4 Mk II and PPM 300 ControllersDEIF genset controllers AGC 150, AGC-4 Mk II, GC-1F, PPU and PPM 300: variants, synchronizing, power management and communications. We configure remotely.BTContactor and Relay Terminal NumberingTerminal markings of contactors and relays: A1-A2 coil, 1-2, 3-4, 5-6 power poles, 13-14 and 21-22 auxiliary contacts and 95-96 overload relay.BT/MTOpen vs Closed Transition Transfer: Differences and RisksOpen, delayed and closed transition transfer between utility and standby generator: outage, momentary paralleling, risks and permits. We do the study.BT/MTSoft Starter vs VFD: Which One to ChooseKey differences between a soft starter and a variable frequency drive: how they start, torque, current, harmonics, energy savings and motor protection.