ECP 35 Power Systems Earthing and HV Installations in NZ

ECP 35 in New Zealand: the power systems earthing code, how it links to HV installation rules in the regulations, and a ground potential rise example.

By Shadai García, CEO and protection engineer at Tiza Group.

G33 kV source33 kV lineinstallation5 000 A0.5 ohmearth gridGPR 1 500 V2 000 A: sheaths and earth wire3 000 A: through the groundPower / fault currentearth fault 5 000 A, 60 % through the ground5 000 x 0.6 = 3 000 A into the grid3 000 A x 0.5 ohm = 1 500 Vlimit 1 000 V needs 0.33 ohm5 000 A: 3 000 A ground + 2 000 A sheathsground potential rise 1 500 V1 000 V example limitgrid resistance: drawn 0.5 ohmneeded for the limit: 0.33 ohmillustrative; the limit is assumed, not from ECP 35EarthingFaultReturn splitGrid resistanceRiseLimit© tizagrp.comG33 kV source33 kV lineinstallation5 000 A0.5 ohmearth gridGPR 1 500 V2 000 A: sheaths and earth wire3 000 A: through the groundPower / fault currentearth fault 5 000 A, 60 % through the ground5 000 x 0.6 = 3 000 A into the grid3 000 A x 0.5 ohm = 1 500 Vlimit 1 000 V needs 0.33 ohm5 000 A: 3 000 A ground + 2 000 A sheathsground potential rise 1 500 V1 000 V example limitgrid resistance: drawn 0.5 ohmneeded for the limit: 0.33 ohmillustrative; the limit is assumed, not from ECP 35EarthingFaultReturn splitGrid resistanceRiseLimit© tizagrp.com
Ground potential rise at a 33 kV installation: a source and line feeding an installation with a phase-to-earth fault of 5 000 A, 3 000 A returning through the ground via an earth grid of 0.5 ohm and 2 000 A through cable sheaths and earth wire, giving a rise of 1 500 V against an example limit of 1 000 V that needs 0.33 ohm. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

ECP 35 is NZECP 35:1993, the New Zealand Electrical Code of Practice for Power Systems Earthing, issued by WorkSafe. It gives acceptable methods for judging whether an earthing system is safe. The Electricity (Safety) Regulations 2010 deem a high-voltage installation protected by an earthing system that complies with ECP 35 to prevent danger to people. High-voltage installations also need a certified design, a certificate of compliance and an independent inspection.

Short answer: what ECP 35 is

ECP 35 is NZECP 35:1993, the New Zealand Electrical Code of Practice for Power Systems Earthing. WorkSafe issues it under section 36 of the Electricity Act 1992 and lists it among the codes cited by the Electricity (Safety) Regulations 2010. It provides guidance on acceptable methods for determining the safety of earthing systems associated with works. The wider rules for high-voltage installations sit in the regulations, and ECP 35 is the earthing piece of them.

WorkSafe lists the 1993 edition as current. Its methods and limits are read in the code itself.

Figure: earth fault current path from a high-voltage installation to its earthing system and the surrounding ground.

The code sits beside the Wiring Rules and the other codes of practice, as the AS/NZS 3000 guide for New Zealand explains. For the companion code on distances, see NZECP 34. The grid codes guide gives the wider picture for plants that connect to the network.

How the regulations use it

WorkSafe’s guidance on high-voltage installations connects three things.

  • Regulation 42 sets requirements for earthing systems. Installations protected by an earthing system compliant with ECP 35 are deemed to prevent danger to any person. For railway electrification systems the equivalent is IEC 62128-1.
  • Regulation 14 makes it an offence to complete a design, including supervising it, that would not be electrically safe if built.
  • Regulation 62 brings several regulations into the design and construction of high-voltage installations, as if they were works. They include protective fittings, structural loading, earthing, isolation fittings, high-voltage conductors, permanent notices and record keeping.

WorkSafe lists earthing among the design issues that weigh more for high voltage than for low voltage. The earthing must keep the system safe under all conditions wherever people have legitimate access.

The design, certification and inspection chain for HV installations

For a high-voltage installation, the regulations add a chain that the earthing design feeds into:

  1. Certified design. Anyone who designs or supervises the design of a high-voltage installation must ensure the finished design would be electrically safe. The 2013 changes introduced the requirement for a certified design.
  2. Construction by licensed electrical workers, to the design.
  3. Certificate of compliance for the work carried out, under regulation 65, with content set by regulation 66.
  4. Inspection by a person authorised by their registration and practising licence who did not carry out, supervise or certify the work. The inspection verifies compliance with NZECP 34 and with several regulations, including those on earthing and isolation.
  5. Safety checks before connection. The person making the connection must inspect and certify the work, be satisfied that tests have been done, and verify technical safety compliance of the supply.

For plants connecting to a network, the distributor’s or Transpower’s requirements add to this. See the Part 6 guide and the protection requirements guide for the connection side.

What earthing design needs from the network

An earthing design is only as good as its fault data. The inputs come from the network owner and from the plant design:

  • The earth fault current at the installation and the fraction that returns through the ground rather than through sheaths, earth wires or neutrals.
  • The clearing time of the protection, which links earthing to the protection settings the network owner agrees.
  • Soil resistivity measured at the site.
  • The layout of the earth grid, including connections to fences, buildings and cable sheaths.

Our guide on substation grounding design by the IEEE 80 method explains the same inputs for a common international method. The grounding practice comparison shows how countries differ. The Australian MEN earthing guide covers the low-voltage side that the two countries share.

Worked example: ground potential rise

All values are illustrative. The acceptance limit below is chosen for the example and is not a value from ECP 35.

A 33 kV installation has a single-phase-to-earth fault current of 5 000 A. The network owner advises that 60% of that current returns through the ground and 40% through the cable sheaths and earth wire.

  1. Current into the earth grid: 5 000 A × 0.6 = 3 000 A.
  2. Earth grid resistance, from the design: 0.5 Ω.
  3. Ground potential rise: 3 000 A × 0.5 Ω = 1 500 V.
  4. Suppose the design team sets an acceptance limit for the rise at 1 000 V for this site.
  5. The grid resistance that meets that limit is 1 000 V ÷ 3 000 A = 0.33 Ω.

The design misses the limit as drawn. Lower resistance is one answer, such as a larger grid or deeper rods. A higher return through sheaths and earth wires is another, and faster protection clearing is a third, where the voltage that matters depends on duration. The method in ECP 35 decides which voltages count and how they are assessed. The example only shows why fault data from the network owner changes the answer.

Checklist for the engineer

  • Record the ECP 35 edition and the Electricity (Safety) Regulations version in the design basis.
  • Obtain earth fault current, split of return paths and clearing time from the network owner.
  • Measure soil resistivity at the site.
  • Assess the earthing system by the method in ECP 35 and keep the calculations.
  • Check isolation fittings, notices and records as required for high-voltage installations.
  • Confirm the certified design, certificate of compliance and independent inspection are scheduled.
  • Check NZECP 34 distances for the layout.

From earthing data to a design ready for your engineer

A high-voltage installation needs a certified design, and engineering in New Zealand is reviewed and signed by a Chartered Professional Engineer (CPEng, registered with Engineering New Zealand). Tiza does not sign or certify designs in New Zealand. We deliver engineering design and the earthing studies behind it, with the inputs and calculations laid out, ready for your CPEng to review and sign. Contact us with the single-line diagram and the fault data from the network owner.

Frequently asked questions

What is ECP 35?

ECP 35 is the New Zealand Electrical Code of Practice for Power Systems Earthing, edition 1993 (NZECP 35:1993). WorkSafe lists it among the codes cited by the Electricity (Safety) Regulations 2010. It gives guidance on acceptable methods for determining the safety of earthing systems associated with works.

Is an earthing system that follows ECP 35 enough for a high-voltage installation?

For the earthing requirement, yes in the sense the regulations use: an installation protected by an earthing system that complies with ECP 35 is deemed to prevent danger to any person. The installation still needs a certified design, inspection and a certificate of compliance.

Is ECP 35 the same as the IEEE 80 method?

No. They are separate documents with their own methods, and the regulations name ECP 35. IEEE 80 remains a common reference for earthing grid calculations elsewhere, and the two should not be mixed without agreement from the reviewing engineer.