Tiza Group

Home / Guides / Codes and grid connection: US, UK, CA, AU

BS 7671 Inspection and Testing: Initial and EICR Rules

BS 7671 inspection and testing explained: initial verification, periodic inspection and EICR, the test order, insulation limits and a loop impedance check.

By Shadai García, CEO and protection engineer at Tiza Group.

DNO transformerPENPE and N linkedZe0.28 Ω32 A type B5 × 32 = 160 AR1 + R20.48 ΩZs0.76 ΩMET, electrodeNPEremote endLineN, PEoperating current 5 × 32 = 160 Alimit Zs = 0.95 × 230 / 160 = 1.37 ΩR1 + R2 = 0.40 × 1.20 = 0.48 Ω at 70 °CZs = 0.28 + 0.48 = 0.76 Ωfault 0.95 × 230 / 0.76 = 288 Aremote end 1.50 Ω would failΩ00.511.51.37Ze 0.28 + R1 + R2 0.48 = 0.76 Ωremote reading 1.50 ΩA0100200300160288 A, 1.8 times 160 Aillustrative values; cable data assumedCircuit pathSupplyDeviceCableRemote endTest© tizagrp.comDNO transformerPENPE and N linkedZe0.28 Ω32 A type B5 × 32 = 160 AR1 + R20.48 ΩZs0.76 ΩMET, electrodeNPEremote endLineN, PEoperating current 5 × 32 = 160 Alimit Zs = 0.95 × 230 / 160 = 1.37 ΩR1 + R2 = 0.40 × 1.20 = 0.48 Ω at 70 °CZs = 0.28 + 0.48 = 0.76 Ωfault 0.95 × 230 / 0.76 = 288 Aremote end 1.50 Ω would failΩ00.511.51.37Ze 0.28 + R1 + R2 0.48 = 0.76 Ωremote reading 1.50 ΩA0100200300160288 A, 1.8 times 160 Aillustrative values; cable data assumedCircuit pathSupplyDeviceCableRemote endTest© tizagrp.com
BS 7671 inspection and testing: the earth fault loop of a 32 A type B final circuit on a TN-C-S supply with the points where Ze of 0.28 ohm, R1 plus R2 of 0.40 ohm at 20 °C corrected to 0.48 ohm at 70 °C and the Zs of 0.76 ohm are measured against the limit of 1.37 ohm, giving a fault current of 288 A, 1.8 times the 160 A operating current, and a 1.50 ohm remote reading that would fail. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

Part 6 of BS 7671 covers inspection and testing. In the current edition, initial verification sits in Chapter 64 and periodic inspection in Chapter 65; the old Chapters 61 to 63 are not used. Initial verification checks a new or altered installation before it is energised for use, and periodic inspection produces an Electrical Installation Condition Report (EICR). Testing follows a fixed order, dead tests first and live tests after, and every result is compared with a limit calculated at design.

Inspection and testing is where a design meets the real installation. For a designer, the test limits are part of the design: every result at commissioning is compared with a value calculated earlier. The context is in the BS 7671 18th edition and the wider UK electrical codes and grid connection guide. The current edition is BS 7671:2018+A4:2026.

Short answer: how does BS 7671 inspection and testing work?

Part 6 of BS 7671 requires every new installation, addition or alteration to be inspected and tested before it is put into service, and existing installations to be inspected and tested periodically. The first is called initial verification and the second periodic inspection. In the current edition they are Chapter 64 and Chapter 65. The numbers 61 and 62 belong to the 17th edition. The 18th edition shows Chapters 61 to 63 as not used, and certification and reporting close each of the two new chapters. Inspection comes first, then dead tests with the supply isolated, then live tests with the supply on. The results go on an Electrical Installation Certificate for new work, or an Electrical Installation Condition Report (EICR) for periodic inspection.

Initial verification

Initial verification answers one question: does the finished work comply with the design and with the standard? It starts with a visual inspection against a checklist. The inspector looks at the connection of conductors, the identification of circuits, the choice of devices, the presence of required labels and the correct selection of cables for the installation method. Then come the tests. The inspector needs the design information: the circuit schedule, the maximum disconnection times and the calculated limits. Without these, a reading can be recorded but cannot be judged.

The test sequence

The tests have an order for a reason. Dead tests prove that the installation is safe to energise.

  1. Continuity of protective conductors, including main and supplementary bonding. The value R1+R2 for each circuit is recorded.
  2. Continuity of ring final circuit conductors, where they exist.
  3. Insulation resistance between live conductors and between live conductors and earth. For circuits up to 500 V, the test voltage is 500 V DC and the reading must be at least 1 MΩ. Separated and protective extra-low voltage (SELV and PELV) circuits are tested at a lower voltage with a lower minimum, and where sensitive electronic equipment cannot be removed, the standard allows a two-stage approach.
  4. Polarity.
  5. Earth electrode resistance, for TT systems.

Live tests follow:

  1. Earth fault loop impedance at the origin and at the remote end of circuits, compared with the maximum values for each protective device.
  2. Prospective fault current, which must not exceed the breaking capacity of the devices.
  3. Residual current device (RCD) operation, checked with an AC test at the rated residual current (IΔn) and by the test button. Since Amendment 2 (2022), a test at five times IΔn is no longer required, though some inspectors still record it. The limits are in the shock protection guide.
  4. Phase sequence on three-phase supplies and functional testing of switchgear and controls.

Periodic inspection and the EICR

An EICR records the condition of an existing installation. The inspector agrees the extent and the limitations with the client, because it is rarely possible to test everything. Each observation is given a classification code. C1 means danger present and requires immediate action. C2 means potentially dangerous. C3 means improvement recommended. FI means further investigation is required. An overall outcome of satisfactory or unsatisfactory follows. In England, under the 2020 regulations, an unsatisfactory report on a rented home triggers a duty to complete remedial work. The deadline is 28 days, or less if the report states it. For workplaces the legal duty comes from the Electricity at Work Regulations 1989, which expects systems to be maintained, and the report interval is chosen from the type of use and the results of the previous report.

Worked example: checking earth fault loop impedance

The numbers are illustrative and the data are assumed. A TN-C-S final circuit is protected by a 32 A type B circuit breaker with a 0.4 s disconnection time. Type B devices are assumed to operate magnetically at five times their rating.

  1. Operating current: 5 × 32 = 160 A.
  2. Maximum Zs: 0.95 × 230 / 160 = 1.37 Ω.
  3. Measured at the origin: Ze = 0.28 Ω.
  4. Measured R1+R2 at the ambient temperature of 20 °C: 0.40 Ω.
  5. Copper resistance at 70 °C, the conductor temperature under load, is higher by about 20 % (resistivity rises about 0.4 % per kelvin, so 1 + 0.004 × 50 = 1.20). The corrected value is 0.40 × 1.20 = 0.48 Ω.
  6. Expected Zs under load: 0.28 + 0.48 = 0.76 Ω, which is below 1.37 Ω.
  7. The fault current at that impedance: 0.95 × 230 / 0.76 = 288 A, which is 1.8 times the operating current of 160 A. The circuit passes with margin.

The check works in both directions. If the measured value at the remote end had come out as 1.50 Ω, the circuit would fail even though each part of the cable looks sound. A failed reading usually points to a loose termination, a wrong conductor size or a longer run than designed.

Figure: a single-line diagram of a final circuit with the points where Ze, R1+R2 and Zs are measured.

Common problems in practice

  • Recording results without the limit next to them, so no one can tell a pass from a fail.
  • Comparing a cold measured Zs with the limit without any temperature allowance.
  • Testing insulation with sensitive equipment still connected.
  • Using a continuity result from a test with the leads not nulled.
  • Recording an RCD as tested from the test button alone, with no timed test at IΔn.
  • Issuing a certificate with the circuit schedule incomplete.
  • Quoting Chapters 61 and 62 on a certificate for work done to the 18th edition.

Checklist for the engineer

  • Prepare the circuit schedule with the device, the maximum disconnection time and the calculated Zs limit for each circuit before the work finishes.
  • State the standard and amendment on the certificate.
  • Agree who tests which circuits when several contractors are involved.
  • Plan the dead tests so that equipment is not exposed to the test voltage.
  • Keep the instrument calibration certificates with the records.
  • For new generation and storage, add the tests that the connection process needs; see the G99 commissioning guide.
  • Hand the records to the client with the as-built drawings, since the next EICR starts from them. The earthing results link back to Chapter 54.

In the UK there is no statutory stamp for electrical designs or test results. A chartered engineer or other competent person reviews the work and signs the certificate or report under their own responsibility. The test records are the evidence on which the duty under the Electricity at Work Regulations is met. Commissioning of switchgear is covered in switchgear and MCC commissioning.

How Tiza can help

If your project needs the verification planned in advance, Tiza prepares the engineering remotely and in English: calculated test limits for every circuit, the schedule and the test record formats. Tiza does not stamp, sign or certify designs or test results in the UK; we deliver engineering ready for your chartered engineer or competent person to review and sign. Contact us with the circuit list and the supply data.

Frequently asked questions

Which chapters of BS 7671 cover inspection and testing?

In the 18th edition, Chapter 64 covers initial verification and Chapter 65 covers periodic inspection and testing. Older notes and some websites still use Chapters 61 and 62, which are the numbers from the 17th edition. Chapters 61 to 63 are now shown as not used.

What insulation resistance is acceptable?

For circuits up to 500 V, the test voltage is 500 V DC and the minimum acceptable reading is 1 MΩ. Extra-low voltage SELV and PELV circuits are tested at 250 V DC with a lower minimum. Table 64 of Regulation 643.3 sets the values; always read the current text.

How often does a rented home need an EICR in England?

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require the fixed electrical installation to be inspected and tested at least every five years, or sooner if the report says so. Other nations and other building types have their own rules, and the report interval for a workplace comes from risk and use.

WhatsApp