Some distribution utilities require a recloser immediately upstream of the metering equipment once an industrial load passes a threshold, for example 1 MVA at 13.2 kV or 1.5 MVA at 34.5 kV. The design then checks the threshold, the rated current, the coordination with the utility feeder protection and what is set remotely in the control.
Short answer
At an industrial service entrance, a recloser upstream of the meter is the customer’s main protection against the network. When a utility sets a load threshold for it, the first design step is to compare the connected load with that threshold. Published utility rules use values such as 1 MVA at 13.2 kV or 1.5 MVA at 34.5 kV; check the figure your utility applies, because it varies by utility and by document version.
What a recloser is and how it operates is covered in recloser. The design has four steps: the threshold check, the current rating, the coordination and the remote setup.
Design flow
- Customer: Connected load and voltage level. kVA and kV at the point of connection
- Customer: Does the load reach the utility threshold? Yes: continue; No: go to step 4.
- Customer: Recloser immediately upstream of the metering. Required by the utility rule
- Customer: Current check and coordination study. Load, short-circuit and utility feeder protection
- Utility: Review of the design and settings. Protection, communications and metering
- Customer: Settings loaded and verified. Active group confirmed against the study
Check the current rating
Rated current follows from load and voltage, I = S ÷ (√3 × V). The values below are assumptions for the example.
| Case (assumed) | Load | Voltage | Load current | Recloser upstream of the meter |
|---|---|---|---|---|
| A | 1 200 kVA | 13.2 kV | 52.5 A | Yes, above 1 MVA |
| B | 900 kVA | 13.2 kV | 39.4 A | Not required by that threshold; optional |
| C | 1 700 kVA | 34.5 kV | 28.5 A | Yes, above 1.5 MVA |
For case A: 1 200 ÷ (1.732 × 13.2) = 52.5 A. The recloser rating is chosen from the data sheet above that current, with the growth margin and the short-circuit interrupting capacity of the point. Do not size the metering current transformers from this number alone; use the utility’s own ratio table for the load range.
Coordination with the utility feeder
The customer recloser sits downstream of the utility’s feeder protection, so its settings must clear a plant fault before the utility device operates. The study works with:
- the utility’s time-current curves and reclosing sequence at the feeder head;
- the fault levels at the point of connection, maximum and minimum;
- the inrush of the plant’s transformers, so the instantaneous element does not trip on energization.
Typical design rule: a temporary fault inside the plant should be cleared by the customer’s fast operation before any upstream fuse is damaged. How that is done step by step is in recloser-fuse coordination.
Remote configuration of the control
The control of the recloser is configured through its communications port. Remote configuration lets the engineer load or review the setting groups without a site visit, always against the approved study:
- keep one setting file per group, with the study reference;
- save the previous file before loading a new one;
- after loading, confirm the active group and run the secondary test the study requires.
Checklist
- Connected load and voltage level confirmed.
- Utility threshold confirmed in its current document version.
- Load current, growth and short-circuit level calculated.
- Coordination study with the utility feeder protection.
- Settings files stored with the study reference.
- Communications accepted by the utility.
- Active group verified after loading.
How we help
We provide the design engineering of recloser installations, from the network data and the coordination study to the settings and the remote configuration of the control: contact us with your load and voltage level and we will propose a scope. See also remote configuration of reclosers.
Related guides
- Recloser: what it is, how it works and tests
- Recloser-fuse and recloser-relay coordination
- Recloser for a feeder: ratings and construction
Frequently asked questions
Why would a utility require a recloser before the meter?
It separates the customer installation from the network. A fault inside the plant is cleared by the customer's own device, so the feeder is not tripped and other customers keep their supply. The meter sits after that switching device.
What must be defined before choosing the recloser?
Connected load in kVA and voltage level, load current with expected growth, short-circuit current at the point of connection, the utility feeder protection to coordinate with, and the communications the utility accepts. Settings come from the coordination study, not from the catalog.
Can the settings be changed remotely?
Yes, if the control has a communications port and the utility accepts remote access. Each change is made against a record of the study, with a backup of the previous file and a check of the active group afterwards.