Tiza Group

Home / Guides / Codes and grid connection: US, UK, CA, AU

NEC 310.16 Ampacity: Temperature Ratings and Derating

NEC 310.16 ampacity explained: how conductor temperature ratings, terminal limits and derating combine, with a worked example using assumed table values.

By Shadai García, CEO and protection engineer at Tiza Group.

conduit: six current-carrying conductors80 A continuousbreaker75 °Cterminalscandidate A: 94.6 A usable, below 100 A: failscandidate B: 105.6 A usable, above 100 A: passesneeds 80 x 1.25 = 100 A90 °C wire, 75 °C terminalsfactors 0.80 and 0.91 (assumed)PowerMeasure / control80 A x 1.25 = 100 A neededA: 130 x 0.91 x 0.80 = 94.6 A, below 100 AB: 145 x 0.91 x 0.80 = 105.6 A, passesusable: the smaller of derated and terminal100 A neededA: table 130 A, derated 94.6 Aterminal 115 A, usable 94.6 AB: table 145 A, derated 105.6 Aterminal 130 A, usable 105.6 A050100150 Aillustrative; table values and factors assumedAmpacityLoadTable ampacityDeratingTerminal limitUsable ampacity© tizagrp.comconduit: six current-carrying conductors80 A continuousbreaker75 °Cterminalscandidate A: 94.6 A usable, below 100 A: failscandidate B: 105.6 A usable, above 100 A: passesneeds 80 x 1.25 = 100 A90 °C wire, 75 °C terminalsfactors 0.80 and 0.91 (assumed)PowerMeasure / control80 A x 1.25 = 100 A neededA: 130 x 0.91 x 0.80 = 94.6 A, below 100 AB: 145 x 0.91 x 0.80 = 105.6 A, passesusable: the smaller of derated and terminal100 A neededA: table 130 A, derated 94.6 Aterminal 115 A, usable 94.6 AB: table 145 A, derated 105.6 Aterminal 130 A, usable 105.6 A050100150 Aillustrative; table values and factors assumedAmpacityLoadTable ampacityDeratingTerminal limitUsable ampacity© tizagrp.com
Conductor ampacity for an 80 ampere continuous load needing 100 amperes: a breaker, six current-carrying conductors in one conduit with 75 degree terminals, and the load, with the worked example of candidate A with an assumed 130 ampere table value derated by 0.91 and 0.80 to 94.6 amperes, which fails, and candidate B with an assumed 145 amperes derated to 105.6 amperes under a 130 ampere terminal limit, which passes. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

NEC Table 310.16 gives the allowable ampacity of insulated conductors in three temperature columns. The ampacity you can use is the lowest of three limits: the conductor after derating, the terminal temperature rating of the equipment, and the load requirement. Derating for ambient temperature and for more than three current-carrying conductors starts from the high-temperature column, and the result is then capped by the terminal column.

NEC 310.16 ampacity is the table that most designers open first when they size a conductor. It lists the allowable ampacity of insulated conductors rated up to 2,000 V, in three temperature columns, for no more than three current-carrying conductors in a raceway, cable or the earth. Article 310 of the National Electrical Code (NEC, NFPA 70) sets how that table is used.

The wider framework is in the US electrical codes and grid interconnection guide. Buried cables with soil and grouping factors use another method, explained in ampacity adjustment factors: temperature, soil and grouping. Both methods are needed in a real project.

Section and table numbers here follow the 2023 edition of the NEC. The 2026 edition is current, but the authority having jurisdiction (AHJ) decides which one applies. Confirm the numbering and local amendments in the adopted edition, and read the table values in the code.

Short answer

The ampacity you may use for a conductor is the lowest of several limits. Start with the table value in the column of the highest insulation rating. Apply the corrections for ambient temperature and for more than three current-carrying conductors to that value. Then compare the result with the table value in the column that matches the terminals of the equipment (section 110.14(C)), and take the smaller number. Finally, the conductor must be at least as large as the load requires, including the 125 percent factor for continuous loads and the rules of the specific article for the equipment.

The three temperature columns

Table 310.16 gives ampacities at 60 degrees C, 75 degrees C and 90 degrees C. The numbers rise from the first to the last, because insulation that tolerates more heat can carry more current. The 90 degrees C column is the one used for derating. It is not the one used for the circuit, unless the terminals allow it.

Three temperatures are in play:

  • The conductor insulation. For example, a conductor marked 90 degrees C.
  • The terminals. Breakers, lugs and equipment have their own rating, normally marked on the equipment or its listing.
  • The conditions of use. The ambient temperature and the number of conductors in the raceway.

The conductor cannot run hotter at the terminal than the terminal can take. That is the content of section 110.14(C), and the reason a 90 degrees C conductor connected to a 75 degrees C terminal is sized as a 75 degrees C conductor for that purpose.

Terminal temperature in practice

A common reading of 110.14(C) for equipment rated 100 A or less, or marked for conductors of the smaller sizes, is that the 60 degrees C column governs unless the equipment is listed and marked for a higher rating. For larger equipment the 75 degrees C column is the usual ceiling. The conditions have exceptions and variations, so read the section of the adopted edition and the equipment markings. A manufacturer’s marking, when present, beats a general rule.

Derating: ambient temperature and number of conductors

Two corrections apply to the ampacity of the 90 degrees C column when the conditions depart from those of the table:

  1. Ambient temperature. Higher than the table basis, the allowable ampacity falls by a factor.
  2. More than three current-carrying conductors in the same raceway or cable, the ampacity falls by a percentage that depends on the count. Neutrals and grounding conductors count in specific cases, which the code lists.

The corrected ampacity is the derated value. It then meets the terminal limit, and the lower of the two becomes the usable ampacity. This order is the reason a larger insulation rating still helps: derating starts from a higher number, and the terminal caps what is left.

The sequence matters. A designer who applies derating to the 75 degrees C column instead of the 90 degrees C one will oversize the conductor. A designer who stops at the 90 degrees C value will undersize the terminal.

Special cases the table does not cover

  • Dwelling services and feeders have their own provisions in the article, which allow a specific reduction. Check the section in the adopted edition.
  • Medium-voltage conductors use other tables, and underground installations use calculated methods (the Neher-McGrath method, as explained in the guide on adjustment factors).
  • Motor circuits, transformers, generators and EV chargers each have their own rule that sets the minimum before the table: see the sister guides on motor circuits under Article 430 and on EV charging under Article 625.
  • Copper and aluminum have different tables. For the choice between them, see copper or aluminum conductors.

Figure: a conductor in conduit with its three limits: the derated ampacity, the terminal rating and the load requirement.

Worked example: six conductors in a conduit

The data are illustrative. All table values are labelled “assumed” and stand for numbers to be read in Table 310.16 of the adopted edition. The factors are also assumed.

  • Continuous load: 80 A. The circuit needs at least 80 × 1.25 = 100 A.
  • Terminals: 75 degrees C. Conductors with 90 degrees C insulation.
  • Six current-carrying conductors in the conduit: adjustment factor 0.80 (assumed).
  • Ambient temperature correction factor: 0.91 (assumed).

Candidate A: assumed ampacity 130 A at 90 degrees C and 115 A at 75 degrees C.

  1. Derated: 130 × 0.91 × 0.80 = 94.6 A.
  2. Terminal limit: 115 A.
  3. Usable ampacity: the smaller, 94.6 A. This is under 100 A. Candidate A fails.

Candidate B, one size up: assumed ampacity 145 A at 90 degrees C and 130 A at 75 degrees C.

  1. Derated: 145 × 0.91 × 0.80 = 105.6 A.
  2. Terminal limit: 130 A.
  3. Usable ampacity: 105.6 A, which meets the 100 A requirement. Candidate B passes.

The overcurrent device is then chosen against the usable ampacity, with the rules of Article 240 for rounding up. The decisive number here is the derated one, not the table value. In a conduit with few conductors and a mild ambient, the terminal column would decide instead.

Common mistakes

  • Using the 90 degrees C table value directly as the circuit ampacity.
  • Derating from the 75 degrees C column and oversizing.
  • Forgetting the conductors that count: harmonic neutrals, for instance.
  • Ignoring the markings on the equipment terminals.
  • Skipping the continuous load factor before choosing the conductor.
  • Taking a number from a previous edition of the table without checking it.

Checklist for the engineer

  • Confirm the NEC edition and amendments adopted by the AHJ.
  • Determine the load requirement, including the 125 percent factor for continuous loads.
  • Identify the terminal temperature rating of every device in the circuit.
  • Take the table value at 90 degrees C and apply ambient and grouping corrections.
  • Cap the result with the terminal column, and use the smaller figure.
  • Check the overcurrent device and the voltage drop.
  • For buried or special installations, use the calculated method.

Who signs and seals

In the United States a design normally has to be signed and sealed by a professional engineer licensed in the state of the project.

From the rules to a design your engineer can stamp

Tiza provides engineering design for power circuits: conductor sizing, voltage drop, protection ratings and cable schedules, ready for your engineer of record to review and stamp. Tiza does not sign, seal or certify work in the United States. Contact us with the load list, the routes and the equipment data.

Frequently asked questions

Which column of NEC Table 310.16 should I use?

It depends on the terminals. Section 110.14(C) limits the ampacity to the lowest temperature rating of any connected termination, conductor or device. Equipment rated 100 A or less is generally treated as 60 degrees C unless it is marked otherwise, and larger equipment can use the 75 degrees C column. A conductor with 90 degrees C insulation can start the derating from its own column, but the terminal column still caps the result.

Where do the derating factors start from?

Ambient temperature correction and the adjustment for more than three current-carrying conductors are applied to the ampacity of the 90 degrees C column. The result must not exceed the ampacity of the column that matches the terminals. The smaller of the two numbers governs.

Has Article 310 changed in the 2026 NEC?

The section numbers in this guide follow the 2023 edition. The code is renumbered in places from one edition to the next, so check the adopted edition and the local amendments before you cite a section in a design.

WhatsApp