NEC 250.122 sizes the equipment grounding conductor from the rating of the overcurrent device that protects the circuit, using Table 250.122, not from the load. When the ungrounded conductors are enlarged, for example for voltage drop, the equipment grounding conductor is enlarged in proportion. Parallel runs need an EGC in each raceway. Section 250.166 sizes the dc grounding electrode conductor, which is a different conductor.
The equipment grounding conductor (EGC) is the wire that carries fault current home. It is small next to the circuit conductors, so it is easy to undersize. The mistake only shows on the day of a fault.
Section numbers in this guide follow the 2023 edition of the NEC (NFPA 70). NFPA issued the 2026 edition in 2025. Many jurisdictions still enforce an earlier edition, so confirm the one adopted where you build.
Short answer
NEC 250.122 sizes the equipment grounding conductor from the rating or setting of the overcurrent device that protects the circuit, using Table 250.122. The load and the size of the circuit conductors are not the starting point. When the ungrounded conductors are made larger, for example to limit voltage drop, the EGC is increased in proportion. Parallel conductors in several raceways have their own rule, and a separate section covers the dc grounding electrode conductor, which is not the EGC.
Figure: a feeder with its overcurrent device, the circuit conductors and the equipment grounding conductor bonded to the enclosure at each end.
The overview is in NEC Article 250 grounding and bonding, and the wider framework in the US electrical codes and grid interconnection guide. Sections 250.166 and 250.122 are often paired, but 250.166 sizes the dc grounding electrode conductor. The EGC is sized in 250.122.
What the EGC does
When a live conductor touches a metal enclosure, the fault current flows through the EGC back to the source. The current must be large enough to open the overcurrent device quickly, and the EGC must carry it without melting before the device opens. So the EGC is sized from the device that must open, not from the load.
This is why a 20 A circuit with a 12 AWG circuit conductor and a 100 A feeder with its own bigger conductors get different EGCs. The device rating decides.
The main rules in 250.122
- Size from the device. The table gives the minimum EGC for each range of device ratings. The device is the one ahead of the equipment, such as the feeder or branch breaker. Use the table of your edition for the values.
- Never larger than needed. The EGC is not required to be larger than the circuit conductors it runs with.
- Increase in proportion. If the ungrounded conductors are made larger for any reason, such as voltage drop, the EGC is enlarged in proportion to the circular mil area of the increase.
- Single conductor. If several circuits share one raceway, one EGC can serve them, sized for the largest device among them.
- Parallel conductors. For conductors in parallel in more than one raceway, an EGC runs in each raceway. Each one is sized from the table for the full device rating, not as a share of it.
- Motor circuits and special cases. Some circuits, such as certain motor and feeder circuits, have their own references.
Which conductor types may serve as an EGC at all is a different section, 250.118, covering items such as metal conduit and listed cable armor.
Why the EGC matters for protection
Fault current in the loop depends on the impedance of the whole path: the circuit conductor and the EGC. A thin EGC adds impedance and lowers fault current, so the device opens more slowly. The same goes for voltage rise on the enclosure during the fault. The guide on the PE circuit of an assembly explains the same idea in IEC terms. The guide on ground-fault and phase coordination in low voltage shows how fault current affects the protection.
Worked example
Illustrative data, not from any project. A feeder is protected by a 100 A breaker. For this rating, Table 250.122 gives an 8 AWG copper EGC.
- The circuit conductors are 3 AWG copper, area 52,620 circular mils.
- The long run causes too much voltage drop, so the designer increases the circuit conductors to 1/0 AWG copper, area 105,600 circular mils.
- Ratio of increase: 105,600 / 52,620 = 2.01.
- Base EGC: 8 AWG, area 16,510 circular mils.
- Required EGC area: 16,510 x 2.01 = about 33,130 circular mils.
- The 6 AWG copper conductor has 26,240 circular mils, which is too small. The 4 AWG has 41,740, which is enough. The EGC becomes 4 AWG.
The device did not change, and the EGC grew by two sizes because the conductors grew. A drawing that shows an 8 AWG EGC with 1/0 AWG circuit conductors on this feeder would fail the review. The conductor areas used here are the standard AWG areas, and the base size comes from the table of the edition in force.
Common mistakes
- Sizing the EGC from the load, or from the circuit conductor.
- Forgetting to increase the EGC when the circuit conductors are increased.
- Using 250.166 for an equipment grounding conductor.
- Splitting the EGC size among parallel raceways.
- Choosing a wiring method as an EGC without checking that it is permitted for that use in 250.118.
- Taking the device size from the wrong place when a circuit has a device on each end.
Checklist for the engineer
- Identify the NEC edition and local amendments the authority enforces.
- List the overcurrent device rating or setting for every circuit.
- Look up the EGC in Table 250.122 of that edition.
- Compare the result with the circuit conductor and apply any proportional increase.
- For parallel runs, put a full-size EGC in each raceway.
- Confirm that each wiring method used as an EGC is permitted for that use.
- Keep dc grounding electrode conductor sizing in its own calculation.
- Show the EGC size next to the circuit conductors on the schedule.
For the conductors that run with the EGC, see the guide on PV conductor sizing and raceways and NEC Article 240.
Who signs and seals
A conductor schedule for a US project is normally signed and sealed by a professional engineer licensed in the state of the project. Tiza delivers engineering design ready for your engineer of record to review and stamp. Tiza does not sign, seal or certify work in the United States.
How Tiza can help
If your project needs the conductor and grounding schedules prepared, Tiza delivers them remotely and in English, ready for your engineer of record to review and stamp. Send us the single-line diagram and the schedules, and we will scope the work with you. Contact us to start.
Frequently asked questions
How is the equipment grounding conductor sized under NEC 250.122?
From the rating or setting of the overcurrent device ahead of the circuit, using the table in 250.122, not from the load or from the circuit conductor size. The conductor must also be large enough for the special rules in the section, such as upsizing and parallel runs.
Is 250.166 the equipment grounding conductor section?
No. Section 250.166 sizes the direct-current grounding electrode conductor, which connects a dc system to the grounding electrode. The equipment grounding conductor that runs with the circuit is sized in 250.122. The two are different conductors with different jobs, which is why the two sections should not be merged in one calculation.
Do I upsize the equipment grounding conductor when I upsize the circuit conductors?
Yes, in proportion, when the ungrounded conductors are increased in size for a reason such as voltage drop. The equipment grounding conductor is increased by the same ratio in circular mil area, based on the size chosen from the table. The rule keeps the fault path in step with the circuit.