Tiza Group

Home / Guides / Codes and grid connection: US, UK, CA, AU

NEC Article 250 Grounding and Bonding: A Design Guide

How NEC Article 250 organizes grounding and bonding: system grounding, electrodes, conductor sizing and equipment bonding, with a worked ground rod case.

By Shadai García, CEO and protection engineer at Tiza Group.

utility servicedisconnectservice enclosurebondingjumperpanelEGC 250.122GEC 250.66ground rodconcrete-encasedelectrodePowerBondingrho 100 ohm-m, 8 ft x 5/8 in rod6.52 x (7.12 - 1) = about 39.9 ohmone rod over 25 ohm: add electrodetwo rods 6 ft apart: about 20 ohmground resistance (ohm)25 ohm39.9 ohmone rodabout 20 ohmtwo rodsmeasure the soil resistivity, do not assume itGroundingServiceBonding jumperGECEGCElectrodes© tizagrp.comutility servicedisconnectservice enclosurebondingjumperpanelEGC 250.122GEC 250.66ground rodconcrete-encasedelectrodePowerBondingrho 100 ohm-m, 8 ft x 5/8 in rod6.52 x (7.12 - 1) = about 39.9 ohmone rod over 25 ohm: add electrodetwo rods 6 ft apart: about 20 ohmground resistance (ohm)25 ohm39.9 ohmone rodabout 20 ohmtwo rodsmeasure the soil resistivity, do not assume itGroundingServiceBonding jumperGECEGCElectrodes© tizagrp.com
NEC Article 250: a service with its main bonding jumper, the grounding electrode conductor to a ground rod and a concrete-encased electrode, the equipment grounding conductor to the panel, and the resistance of one rod in 100 ohm-meter soil. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

NEC Article 250 covers grounding and bonding of electrical installations, with systems over 1,000 V ac moved to Article 270 in 2026. It separates system grounding, the grounding electrode system, the grounding electrode conductor sized from Table 250.66 and the equipment grounding conductor sized from Table 250.122. Grounding limits voltage to earth. Bonding gives fault current a path that lets the breaker trip.

Grounding and bonding are easy to confuse. The words sound alike, the sections are many and a mistake is often hidden inside a wall. A clear map of Article 250 saves time.

Section numbers in this guide follow the 2023 edition of the NEC (NFPA 70). NFPA issued the 2026 edition in 2025, and moved the rules for systems over 1,000 V ac or 1,500 V dc from Part X of Article 250 to a new Article 270. Many jurisdictions still enforce an earlier edition, so confirm the one adopted where you build.

Short answer

NEC Article 250 covers grounding and bonding of electrical installations. In 2023 its Part X also covers systems over 1,000 V; in 2026 those rules sit in Article 270. It has four jobs. It grounds the system, connects it to an electrode system in the earth and sizes the conductors that make those connections. It also bonds all metal parts so fault current finds a low-impedance path to the source. The grounding electrode conductor is sized from Table 250.66 and the equipment grounding conductor from Table 250.122.

Figure: a service with a grounding electrode conductor to a rod, a bonding jumper at the main disconnect and equipment grounding conductors running with each feeder.

The wider framework is in the US electrical codes and grid interconnection guide. The sizing of the equipment grounding conductor has its own guide on NEC 250.122 equipment grounding conductor sizing.

Grounding is not bonding

The two words describe different connections with different purposes.

  • Grounding connects the system, and the metal parts, to the earth through an electrode. It limits the voltage that lightning, line surges or a contact with a higher-voltage line can put on the system. It also stabilizes the voltage during normal operation.
  • Bonding connects metal parts to each other and to the source. It makes sure that when a live conductor touches a metal enclosure, a large current flows in a low-impedance loop and the breaker opens quickly. It also keeps all the metal at one potential, so a person touching two parts is not between two voltages.

A common wrong idea is that the rod clears faults. Earth is a poor conductor compared with a copper wire. The current that trips the breaker returns through the equipment grounding conductor, not through the soil.

How Article 250 is organized

You can think of Article 250 as six blocks.

  1. General rules set the purpose and the requirements for grounded and ungrounded systems.
  2. System grounding says which systems are grounded and where the connection is made, including the rules for separately derived systems such as a transformer secondary.
  3. Grounding electrode system lists the electrodes, such as metal water pipes, building steel, concrete-encased electrodes and driven rods, and the rules for installing and bonding them together.
  4. Grounding electrode conductor sets the conductor between the system and the electrode, sized from Table 250.66.
  5. Bonding sets how the enclosures, raceways and metal parts are connected.
  6. Equipment grounding lists the types of conductor that can act as an equipment grounding conductor and sizes it from Table 250.122.

Special systems have their own sections: solar and storage connect to Article 250 through Articles 690 and 706. For dc systems, the grounding electrode conductor is sized in 250.166, which is a different section from the equipment grounding conductor in 250.122.

Grounding electrodes in practice

A building can have several electrodes available: a concrete-encased electrode in the footing, structural steel, buried water piping and driven rods. The code expects those that are present to be bonded together into one grounding electrode system. When none is available, rods or plates are driven or installed. A rod electrode is at least 8 ft (2.44 m) long and 5/8 in (15.87 mm) in diameter, unless listed for a smaller size. Section 250.53 sets the rules for driving, spacing and supplementing a single electrode. The electrode system limits voltage to earth. It is not a promise of any particular resistance unless a rule says so.

For a substation or a large site, the NEC is not the whole answer. The ground grid design follows other documents, as described in the guides on grounding of distribution substations and the IEEE 80 design method. On the dc side of solar, the guide on DC ground-fault detection covers a different part of the problem.

Worked example

Illustrative data, not from any project. The soil resistivity at a small site is 100 ohm-meters. A copper-bonded rod is 8 ft long (2.44 m) with a 5/8 in diameter (radius 0.0079 m). Estimate the resistance of one rod with this formula:

R = rho / (2 x pi x L) x (ln(4L / a) - 1)

  1. Leading term: 100 / (2 x 3.1416 x 2.44) = 6.52 ohms.
  2. Logarithm: 4 x 2.44 / 0.0079 = 1,235.4, and ln(1,235.4) = 7.12.
  3. Bracket: 7.12 - 1 = 6.12.
  4. Resistance: 6.52 x 6.12 = about 39.9 ohms.
  5. Two rods placed far enough apart not to interfere would give roughly half, about 20 ohms. Real rods placed close together give less improvement, so treat 20 ohms as a lower bound.

The lesson is that one rod in 100 ohm-meter soil is not a low-resistance ground. Under 250.53(A)(2), a single rod needs a supplemental electrode unless it measures 25 ohms or less, so this rod needs one. The two rods must be at least 6 ft (1.8 m) apart. A site with a stricter need, such as a substation, sets its own target through a study. The soil resistivity must be measured, not assumed. The guide on the Metrel MI 3290 earthing analyzer describes one way to measure.

Common mistakes

  • Using grounding and bonding as if they meant the same thing.
  • Relying on the rod to clear faults.
  • Sizing the equipment grounding conductor from the load instead of from the overcurrent device.
  • Using the ac electrode conductor table for a dc system.
  • Bonding the neutral to ground at more than one point on the same system.
  • Leaving a separately derived system with no bonding and no electrode connection.
  • Citing a section from one edition against a project reviewed under another.

Checklist for the engineer

  • Identify the NEC edition and local amendments the authority enforces.
  • List every system and every separately derived source, and decide where each is grounded.
  • Identify the electrodes present at the site and bond them into one system.
  • Measure the soil resistivity if rods or a grid are needed.
  • Size the grounding electrode conductor from the table that applies to ac or dc.
  • Size each equipment grounding conductor from its overcurrent device.
  • Show the single point of neutral-to-ground bonding on each system.
  • Check the extra rules for solar, storage and generators on the same site.
  • Show the grounding scheme on the single-line diagram.

Who signs and seals

A grounding design for a US project is normally signed and sealed by a professional engineer licensed in the state of the project. Tiza delivers engineering design ready for your engineer of record to review and stamp. Tiza does not sign, seal or certify work in the United States.

How Tiza can help

If your project needs the grounding scheme prepared for permit, Tiza delivers the grounding design remotely and in English. It is ready for your engineer of record to review and stamp. Send us the site data and the equipment list, and we will scope the work with you. Contact us to start.

Frequently asked questions

What is the difference between grounding and bonding in the NEC?

Grounding connects the system and the equipment to earth, which limits voltage from lightning, surges and contact with higher-voltage lines. Bonding connects metal parts together so fault current has a low-impedance path back to the source and the overcurrent device opens. Both are required, and they do different jobs.

Does a ground rod make a fault trip the breaker?

No. Earth is a poor return path for fault current. The breaker trips because of the equipment grounding conductor and the bonding that carry fault current back to the source. The rod and the electrode system control voltage to earth, not the fault clearing.

Where is the grounding electrode conductor sized?

For ac systems, the sizing rules are in 250.66, based on the size of the largest ungrounded service conductor or equivalent. The dc grounding electrode conductor has its own section. Equipment grounding conductors are sized in 250.122.

WhatsApp