The 2026 NEC keeps Articles 690, 705 and 706 under the same numbers as 2023 and changes what is inside them. Photovoltaic circuit calculations gain a rounding rule and a wider engineered method, the system disconnect rules move to 705.20, supply-side conductor length limits return in 705.11, and Section 706.16 is deleted. Your authority having jurisdiction decides which edition governs the project.
The NEC 2026 vs 2023 question comes up on every solar and storage job: the edition in the drawing notes decides which clauses the inspector checks. The 2026 NEC (NFPA 70) keeps Articles 690, 705 and 706 under the same numbers as 2023. What changed is inside them, and a few sections moved.
Short answer
Six changes matter most for solar and storage designers:
- Rounding and calculation methods in Article 690. A new 690.4(G) covers fractions of an ampere or volt. The engineered calculation method for maximum voltage and current no longer stops at a system size.
- Circuit current from the module instructions. 690.8(A)(1)(a)(2) allows maximum circuit current to follow the listed module’s instructions, which helps with bifacial modules.
- System disconnect rules in one place. 690.13 now sends the installer to 705.20, and locking requirements point to 110.25.
- Supply-side conductor length. 705.11(C)(1) brings back a limit on conductor length that the 2023 edition had dropped.
- Storage disconnects and backup. 706.15 points to 705.20, and 706.16 is deleted.
- Rapid shutdown initiation devices. The 2026 edition rewrites the 690.12(C) language, and NFPA issued a Tentative Interim Amendment (TIA) on it.
The NFPA Standards Council issued the 2026 edition on 20 August 2025, with an effective date of 9 September 2025. That is the date it became available for adoption. The authority having jurisdiction (AHJ) sets the date it becomes enforceable where you build.
Which edition applies to your project
Adoption in the United States is local. One state may enforce 2026 while its neighbor enforces 2020, and a city can adopt amendments on top. Utilities add their own requirements through their interconnection rules, as the US electrical codes and grid interconnection guide explains.
Put the edition and the amendments in the drawing notes. A reviewer who sees “NEC” with no year has to guess, and the wrong guess costs a resubmittal.
Article 690: photovoltaic systems
690.4(G), new in 2026. It sets how to treat fractions of an ampere or volt in PV calculations. Fractions below 0.5 are dropped. Only the final result, after correction factors and conditions of use, is rounded, not each intermediate step.
690.7(A)(3) and 690.8(A)(1)(a)(3). A licensed engineer can use a documented calculation method to determine maximum PV system voltage and current. In 2023 that route applied only to systems of 100 kW or more. The 2026 edition removes the size limit, so it applies to any system.
690.8(A)(1)(a)(2), new in 2026. Maximum circuit current can follow the module manufacturer’s instructions. For bifacial modules, where rear-side gain complicates the usual factor, this gives the designer a documented path. See how to read a module data sheet.
690.13. The system disconnect requirements are now installed under 705.20, and locking requirements refer to 110.25. The substance is largely the one in 2023, reordered. Check cross-references in your drawing notes and specifications.
690.12. The limits that matter in the field stay as they were. Conductors inside the array boundary are controlled to 80 V within 30 seconds of initiation. Conductors outside it go to 30 V within 30 seconds. The 2026 edition changes the 690.12(C) text on initiation devices. The basics are in rapid shutdown in solar systems, and NEC 690.12 rapid shutdown follows the section clause by clause.
Article 705: interconnected sources
705.11(C)(1). Supply-side connections inside a building again have a limit on conductor length between the connection and the first overcurrent device. The 2020 edition had it, the 2023 edition dropped it, and the 2026 edition restores it. The length is measured along the conductor, not in a straight line.
705.13. The section is focused on power control systems, with informational notes that point to UL 3141 and UL 1741 for listed equipment. If your design limits export or manages load to stay inside a busbar rating, read this section with the inverter listing.
705.20. It is now the disconnect section that 690.13 and 706.15 point to. A supply-side or load-side source connection still follows 705.11 or 705.12, and the load-side busbar method continues to be part of Article 705. The sibling guide on Article 705 shows how the pieces fit.
Article 706: energy storage systems
706.15 now refers to 705.20 for the disconnecting means, so storage follows the same rules as other power production sources. Section 706.16 is deleted. Most storage that backs up loads is now treated as an optional standby system under Article 702. In one- and two-family dwellings, a listed power control system is a compliance option for sizing in 702.4.
If your project pairs storage with solar, read AC-coupled vs DC-coupled BESS and battery energy storage system parts and standards to tie the equipment to the code sections above.
Worked example: measuring a supply-side conductor length
This example is illustrative. The numbers are not from a project and the limit in your edition decides the result.
A 3.0 m straight line separates the service conductors from the planned disconnect. The conductor route is:
- 2.2 m horizontal run.
- 1.5 m vertical drop.
- 0.8 m of slack and termination length at each end, 1.6 m in total.
Conductor length: 2.2 + 1.5 + 1.6 = 5.3 m, which is 17.4 ft. That is 5.3 / 3.0 = 1.77 times the straight-line distance, or 77% more. A reviewer who measures across the room would pass a connection that fails when measured along the conductor. Compare the 5.3 m with the limit in your edition’s 705.11(C)(1), which depends on the type of building.
Checklist for the engineer
- Confirm the adopted NEC edition, the amendments and any TIA adopted by the AHJ, in writing.
- Update cross-references: disconnects in 705.20, locking in 110.25.
- Recalculate PV voltage and current with 690.4(G) in mind, rounding only the final result.
- Decide whether the engineered method of 690.7(A)(3) and 690.8(A)(1)(a)(3) adds value, and document it.
- Measure supply-side conductor length along the route and compare it with 705.11(C)(1).
- Re-read the storage disconnect and backup logic against 706.15 and Article 702.
- Check the rapid shutdown initiation device against the 690.12(C) text the AHJ enforces.
- Confirm the utility’s interconnection requirements, which sit outside the NEC.
Who signs and seals
In the United States a design normally has to be signed and sealed by a professional engineer licensed in the state of the project. Tiza delivers engineering ready for your engineer of record to review and stamp. Tiza does not sign, seal or certify work in the United States.
How Tiza can help
If a solar or storage project moves from one NEC edition to another, Tiza prepares the single-line diagram, conductor and protection calculations and drawing notes for the edition your authority enforces. We deliver this engineering design remotely and in English. It is ready for your engineer of record to review and stamp. Send the site data, the adopted edition and the utility requirements and we will scope the work with you. Contact us to start.
Frequently asked questions
Is the 2026 NEC the edition I must use?
Only if your state or local authority having jurisdiction has adopted it. NFPA issued the 2026 edition in 2025, but adoption is set locally and many places still enforce 2020 or 2023, sometimes with amendments. Confirm the adopted edition and amendments in writing before you design.
Did the rapid shutdown voltage limits change in 2026?
No. The voltage and time targets did not change. The 2026 edition reorganizes the language on initiation devices in 690.12(C), and NFPA issued a Tentative Interim Amendment to that subsection. Check whether your authority has adopted the amendment.
Do the 2026 changes affect a design already permitted under 2023?
Not by themselves. A permit is normally reviewed under the edition in force on the application date. A redesign, a resubmittal or a change of authority can move the project to a newer edition, so ask the authority how it treats revisions.