Tiza Group

Home / Guides / Equipment, switchboards and substations

Sub-Distribution Board: What It Holds and How to Size It

A sub-distribution board feeds a floor, zone or process from another board. What it holds, how to choose its incomer and a worked voltage drop example.

By Shadai García, CEO and protection engineer at Tiza Group.

MT/BTGinterlockATSLV busMMfeederCCMauxiliariesbusesUF 1UF 2UF 3term.Form 1no partitionsForm 2separate busbarsForm 3separate unitsForm 4separate terminalsIEC 61439-2: forms of internal separationIntegrationLSIG unitGatewaySCADA© tizagrp.comMT/BTGinterlockATSLV busMMfeederCCMauxiliariesbusesUF 1UF 2UF 3term.Form 1no partitionsForm 2separate busbarsForm 3separate unitsForm 4separate terminalsIEC 61439-2: forms of internal separationIntegrationLSIG unitGatewaySCADA© tizagrp.com
LV switchboard and MCC: automatic transfer and forms of separation. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

A sub-distribution board receives power from another board and feeds a zone, a floor or a process. It is sized from the load of its zone, the short-circuit level at its location, the voltage drop of its feeder and a margin for growth.

A sub-distribution board receives power from another board, usually the main one, and distributes it to a zone, a floor or a process. It is the most repeated board in an installation, so a design error is multiplied.

Short answer

A sub-distribution board is a second-level board: it is fed from another board by cable or busway and protects the circuits of its zone. It is sized from the load current of that zone, the short-circuit current where it is installed, the voltage drop of the feeder and the margin for expansion. Floor boards and distribution panels are the same thing under other names. The comparison with other types is in types of electrical switchboards.

How it differs from the main board

AspectMain boardSub-distribution board
Fed fromTransformer or service entranceAnother board
Fault currentThe highest in the installationLower, because of feeder impedance
Outgoing breakersGenerally larger ratingsMolded-case or miniature
Metering and transferFrequentUncommon
Role in selectivityUpstream of everythingIntermediate: waits for its outgoing breakers and lets the main board act first

Whether a sub-distribution board is a power assembly or a distribution board depends on who operates it: boards for ordinary persons fall under IEC 61439-3, boards for skilled or instructed persons under IEC 61439-2.

What it holds

  • Incoming breaker with its short-circuit rating, protecting the internal busbars and allowing isolation of the board.
  • Busbars sized for the incoming current, with neutral and earth bars.
  • Outgoing breakers for each circuit or group, with residual-current protection where the design requires it. See residual-current devices: types AC, A, F and B.
  • Spare ways: unoccupied space with busbars and outgoing connections prepared.
  • Circuit directory visible inside the board and updated with every change.

Choosing the incomer

  1. Calculate the load current of the zone, with a justified diversity factor.
  2. Choose a breaker whose rating covers that load and does not exceed the capacity of the incoming cable.
  3. Check the short-circuit current at the location: the breaking capacity must be equal or greater, or be backed up by the upstream breaker according to the manufacturer’s coordination (IEC 61439-1, clause 9.3.4).
  4. Check the feeder voltage drop and the selectivity with the upstream breaker. See selectivity in low voltage.

Where to place it

Place the board near the center of the loads it serves, to shorten circuits and voltage drop, and where maintenance staff can reach it without obstacles. It needs clear space in front to open doors and work, and must not sit behind equipment or storage. In a multi-story building, put each sub-distribution board in the same vertical position so that the riser runs straight and the taps are identical. The location is fixed during design, before the civil drawings, because moving a board later forces feeders and conduits to be redone.

Worked example

A floor board supplies 45 kVA at 208 V three-phase. The feeder is 50 mm² copper, 40 m from the main board (assumed data).

  1. Load current: 45 kVA / (√3 × 0.208 kV) = 124.9 A.
  2. Conductor resistance: copper resistivity is 0.0172 Ω·mm²/m at 20 °C; at 75 °C, with a coefficient of 0.00393 per degree, it becomes 0.0209 Ω·mm²/m. R = 0.0209 × 40 / 50 = 0.0167 Ω.
  3. Line voltage drop at power factor 0.9, ignoring reactance: √3 × 124.9 A × 0.0167 Ω × 0.9 = 3.26 V, or 1.57% of 208 V.
  4. This is an approximation. The final design adds the cable reactance for its installation method and compares the result with the voltage drop limit of the applicable standard.
  5. Spare capacity: if expected growth is 25%, the incomer must cover 124.9 × 1.25 = 156 A, and the cable must be checked for that value, not only for 124.9 A.

For the full formula see voltage drop in AC cables.

Checklist

  1. Load current and spare capacity, each with its assumption written down.
  2. Short-circuit current at the board’s location.
  3. Feeder rating and voltage drop with the future load.
  4. Selectivity with the source board and with the outgoing breakers.
  5. Residual-current protection where applicable.
  6. Clear space to work and to open doors.
  7. A legible, updatable circuit directory.

What to avoid

  • Do not size the board for today’s load if the floor will be expanded.
  • Do not use a residential-type board where the fault level is high without checking its breaking capacity.
  • Do not forget the neutral: with electronic loads the neutral current can be high. See low-voltage breakers and harmonic currents.
  • Do not fill the last way: without spare capacity, the next expansion forces a board replacement.

How we help

We prepare the engineering design of sub-distribution boards: load schedule, feeder and short-circuit calculations, selectivity, specification and drawings. See engineering design and studies or contact us.

References

  • IEC 61439-1:2020, clause 9.3.4, coordination of protective devices.
  • IEC 61439-2:2020 and IEC 61439-3:2024, power and distribution assemblies.

Frequently asked questions

Does a sub-distribution board need its own incoming breaker?

Almost always. It lets you de-energize the whole board for maintenance without touching the upstream board, and its rating protects the internal busbars. Its short-circuit rating must cover the fault at its location.

How much spare capacity should be left?

The amount set by the expected growth. Count it in empty ways and also in busbar and feeder capacity: an empty way is useless if the incoming cable is already at its limit.

When is a sub-distribution board a power assembly and when a distribution assembly?

It depends on who operates it: a board intended to be operated by ordinary persons is a distribution board under IEC 61439-3; one operated by skilled or instructed persons is a power assembly under IEC 61439-2. The assembly manufacturer declares which part applies.

WhatsApp