The steps of an automatic bank are the capacitor blocks the controller switches in and out. Their size sets the control resolution and their sequence, 1:1:1 or 1:2:4, defines how many contactors are needed and how hard each one works. The controller needs a sensitivity setting, C/k, calculated from the smallest step and the current transformer ratio.
The steps of an automatic capacitor bank are the blocks of reactive power that the controller switches in and out to follow the load. They are chosen by four items: size, sequence, contactors and controller setting. To decide between fixed and automatic, see automatic or fixed bank; for the whole panel, the power factor correction panel; and for the family, types of electrical panels.
Short answer
Each step is a group of capacitors with its contactor and protection. The size of the smallest step sets the resolution: the bank cannot correct more finely than that value. The sequence (equal, 1:2:2 or binary 1:2:4) sets how many steps and contactors are needed for that resolution. The controller’s C/k setting is calculated from the smallest step and the current transformer ratio.
Worked example
A 200 kvar bank at 400 V, with an 800/5 A current transformer. Four ways to split it:
| Split | Steps (kvar) | Contactors | Resolution | Positions |
|---|---|---|---|---|
| Equal | 8 × 25 | 8 | 25 kvar | 9 |
| 1:2:2:2:1 (base 25) | 25 + 50 + 50 + 50 + 25 | 5 | 25 kvar | 9 |
| 1:1:2:4 (base 25) | 25 + 25 + 50 + 100 | 4 | 25 kvar | 9 |
| Binary 1:2:4:8 (base 12.5) | 12.5 + 25 + 50 + 100 | 4 | 12.5 kvar | 16 |
The binary split adds up to 187.5 kvar, not 200. With four contactors it reaches 16 positions, from 0 to 187.5 kvar in 12.5 kvar jumps.
What changes from one to another:
- The binary sequence needs fewer contactors and gives more resolution, but the large step (100 kvar) switches a big block at once, and the inrush current grows with the step size and with the steps already connected.
- With equal steps the controller can rotate the switching order so all steps wear evenly. In a binary sequence the small steps operate far more than the large ones.
- More equal steps means more contactors, more fuses and a larger panel, in exchange for gentler switching.
Contactor and protection of each step
Capacitor contactors are selected in category AC-6b of IEC 60947-4-1, the category for switching capacitor banks. In addition, the capacitor is allowed to carry continuously a current above its rated value because of harmonics and overvoltage (IEC 60831-1:2014, clause 21), and its real capacitance can exceed the rated value within the manufacturing tolerance. That is why the contactor and the protection are selected with a margin; this example takes 1.5 times the rated current, and the final value is confirmed with the capacitor manufacturer’s data. For the 25 kvar step at 400 V:
- Rated current = 25,000 / (√3 × 400) = 36.1 A.
- Continuous design current = 1.5 × 36.1 = 54 A.
The contactor and the protection are selected above that value. The difference from a motor contactor is explained in utilization categories AC-1, AC-3 and AC-4: a motor category cannot be used for capacitors. A general-purpose contactor wears out or welds with the transient current.
C/k setting of the controller
The controller measures the load current with the current transformer and compares the reactive deficit with what the smallest step would supply. C/k is that threshold, expressed in secondary amperes. One way to calculate it is:
C/k = current of the smallest step / (CT primary current / 5)
With the data of the example: 36.1 A / (800 / 5) = 36.1 / 160 = 0.23 A. On the secondary, the smallest step is equivalent to 0.23 A.
Controller manufacturers give slightly different rules: some ask to set the value near two thirds of the calculated one (here, about 0.15) so the controller connects the step when the deficit reaches that level. Follow the manual of the installed controller.
The two typical errors are:
- C/k too low: the controller connects the step, the reactive power becomes surplus, it disconnects it and repeats the cycle. The contactors wear out early.
- C/k too high: the controller does not see the deficit and leaves the power factor below the target.
Many controllers include an automatic setting function; the device manual states under which load conditions it is run.
When the steps are not enough
- Minimum load smaller than the smallest step. At night, with a 20 kvar deficit and a 25 kvar step, the bank stays off and the power factor drops slightly. This is normal; the fix is a smaller step, not a lower C/k.
- Loads that change in seconds. Contactors do not tolerate switching every few seconds. Thyristor switches are used instead: they switch with a minimal transient and without mechanical wear.
- Harmonics. With drives or rectifiers, each step gets a detuning reactor, which raises the cost and the size of the step. It is covered in the power factor correction panel.
- Discharge. A step must not be reconnected before its capacitors discharge; the controller enforces a waiting time. The effects of a poorly handled discharge are in capacitor discharge in a short circuit.
Checklist
- Total power calculated from plant measurements, as in how to size a capacitor bank.
- Smallest step smaller than the reactive change to follow and than the minimum off-peak deficit.
- Sequence chosen and number of contactors consistent with the resolution.
- Contactors in category AC-6b.
- Rated current of the step calculated, with protection above the continuous design current.
- Current transformer ratio and C/k calculated and noted on the drawing.
- Discharge time and waiting time between operations of the same step.
- Rating plate with the kvar of each step.
How we help
We design the steps, contactors and controller settings of your bank remotely, worldwide, from your load profile and measurements, adapted to the local code and the utility requirements you give us. See our primary engineering service and write to us.
Related guides
- Types of electrical panels: which one to choose for your load
- Power factor correction panel
- Indirect metering panel
- Automatic or fixed capacitor bank: which one fits
- How to size a capacitor bank in a plant
- Contactors: utilization categories AC-1, AC-3 and AC-4
- Capacitive reactive power
References
- IEC 60947-4-1:2023 (edition 5), contactors and motor-starters, utilization category AC-6b (switching of capacitor banks).
- IEC 61921:2017, low-voltage power factor correction banks.
- IEC 60831-1:2014, shunt power capacitors of the self-healing type for low-voltage a.c. systems.
Frequently asked questions
How many steps should an automatic bank have?
Enough for the smallest step to be smaller than the reactive change you want to follow. A 200 kvar bank can have 8 steps of 25 kvar or 4 steps in a 1:1:2:4 sequence. Both reach 25 kvar of resolution; the second uses half the contactors.
What is the C/k setting of a power factor controller?
It is the sensitivity with which the controller decides to switch a step in or out. It is calculated from the current of the smallest step and the current transformer ratio. If it is set too low, the controller switches the same step on and off continuously; if it is too high, the bank does not correct.
Which contactor is used to switch a capacitor step?
One of utilization category AC-6b under IEC 60947-4-1, the category for switching capacitor banks. Energizing a capacitor produces a very high transient current, especially when other steps are already connected, and a general-purpose contactor welds or wears out sooner.