NEC section 110.16 requires a field marking on certain electrical equipment other than in dwelling units, so that a qualified person is warned of the arc flash hazard before working on it. The 2026 edition changed the section from a warning to a marking with defined content: nominal voltage, arc flash boundary, incident energy or protective equipment level, and the date of the assessment. The values come from an arc flash study, not from the NEC.
NEC 110.16 arc flash label requirements decide what a worker sees on the front of a panel before opening it. The requirement belongs to the National Electrical Code (NEC, NFPA 70) and is written to be a field marking on installed equipment.
The section, its 2026 change, NFPA 70E and the study that produces the values fit together as shown below. The wider framework is in the US electrical codes and grid interconnection guide. The label content in detail is in the existing guide on arc flash labels and what they must say.
The 2023 and 2026 editions of the NEC are compared here. Many jurisdictions still enforce 2023 or earlier, sometimes with amendments, so confirm which edition your authority having jurisdiction (AHJ) has adopted.
Short answer
Section 110.16 requires arc flash marking on equipment such as switchboards, panelboards, industrial control panels and motor control centers, in other than dwelling units. The 2023 edition asked for a general warning. It added a label with voltage, fault current, clearing time and date on service and feeder equipment rated 1,000 A or more. The 2026 edition removes the 1,000 A threshold and defines the content: nominal system voltage, arc flash boundary, incident energy or minimum protective equipment level, and the date of the assessment. The values come from a study, not from the code.
What the section is for
Arc flash is the release of energy when current passes through air between conductors. The danger is to the person standing in front of the equipment. The label tells a qualified person that the hazard exists and, with the study behind it, how large it is.
Two related documents are easily mixed up:
- The NEC requires the marking on the installed equipment.
- NFPA 70E, the standard for electrical safety in the workplace, sets how workers are protected and what a label should carry for its own purposes. It documents the calculation method and requires review of the assessment at intervals that do not exceed five years.
The NEC says that the marking has to be there. NFPA 70E says how workers use it.
The 2023 and 2026 editions
The main differences between the editions are:
| Topic | 2023 edition | 2026 edition |
|---|---|---|
| Section character | A warning that follows applicable industry practice | A marking with its content listed in the section |
| Rating threshold | 1,000 A or more for the detailed label on service and feeder equipment | None |
| Content | General warning; for 1,000 A and up: nominal voltage, available fault current, clearing time and date the label was applied | Nominal voltage, arc flash boundary, incident energy or minimum protective equipment level, assessment date |
| Dwelling units | Excluded | Excluded |
The threshold decides the scope. Under 2023, only service and feeder equipment of 1,000 A or more needs the detailed label. Under 2026, equipment of any rating in scope carries the full marking.
Where the numbers come from
The label values are not found in a table. They are the result of a study:
- Fault current. The study starts from the short-circuit calculation at each piece of equipment. The same value supports the marking covered in the guide on NEC 110.24 available fault current marking.
- Clearing time. The protective device upstream sets how long the arc lasts. Settings, coordination and maintenance modes change it.
- The arc flash method. IEEE 1584-2018 is the usual calculation method for incident energy. The study guide Arc Flash Study: IEEE 1584 and NFPA 70E explains the process.
- The result. Incident energy and the arc flash boundary go on the label, together with the date.
If the protection settings change, the incident energy changes with them, and the label is out of date. That is why the date is part of the content.
Figure: a switchboard with its upstream breaker and relay, with the arc flash marking on the front and two clearing times compared.
Worked example: the effect of clearing time
The data are illustrative. At a 480 V switchboard, a study finds an incident energy of 8.0 cal/cm² at the working distance with an arc duration of 0.5 s. A maintenance mode on the upstream breaker is proposed to shorten the clearing time to 0.1 s.
- For a given arcing current and working distance, incident energy grows roughly in proportion to arc duration. We use that as a first estimate, not as a calculation method.
- Estimated incident energy with the shorter time: 8.0 × (0.1 / 0.5) = 1.6 cal/cm².
- The reduction is a factor of five, and it holds only if the arcing current stays the same. A different setting can change the current that the device sees.
- The label cannot be updated from this estimate. The study is rerun with IEEE 1584-2018 and the new settings, and the label gets the new value and a new date.
The lesson is that a label is a snapshot of the settings and the system on its date. The guide on how to reduce incident energy lists the measures that change the numbers. The guide on arc flash PPE categories explains how the result is used in work practices.
How it fits with the other articles
The label applies to equipment that Article 408 and Article 409 also cover. See the sister guides on NEC Article 408 switchboards and panelboards and NEC Article 409 industrial control panels.
Checklist for the engineer
- Confirm the NEC edition and local amendments adopted by the AHJ.
- Decide which equipment is in scope under that edition: 1,000 A and up in 2023, any rating in 2026.
- Run or update the arc flash study with a documented method and current protection settings.
- Record nominal voltage, arc flash boundary, incident energy or protective equipment level and the date of the assessment.
- Specify a permanent, durable label that is not handwritten.
- Set a review interval and a rule that any change to the source, the equipment or the protection settings triggers a new assessment.
- Coordinate the label with the available fault current marking so the two do not contradict.
- Keep the study report with the other record documents.
Who signs and seals
In the United States a design normally has to be signed and sealed by a professional engineer licensed in the state of the project. Arc flash studies are usually prepared by an engineer and then reviewed by the engineer of record or the owner’s safety program.
From the label to a study your engineer of record can stamp
Tiza prepares power-system studies, including short-circuit and arc flash studies, ready for your engineer of record to review and stamp, remotely and in English. Tiza does not sign, seal or certify work in the United States. Contact us with the single-line diagram, the protection settings and the equipment data.
Frequently asked questions
Does NEC 110.16 require an arc flash study?
The NEC asks for the marking. To fill in the incident energy or the protective equipment level, someone has to calculate them, and in practice that is an arc flash study under IEEE 1584 and the rules of NFPA 70E. The calculation method and the review interval are set by NFPA 70E, not by section 110.16.
What changed in 110.16 between the 2023 and 2026 editions?
The 2023 text asked for a general warning, plus a label with fault current and clearing time on service and feeder equipment rated 1,000 A or more. The 2026 text removes the 1,000 A threshold and sets the content: nominal voltage, arc flash boundary, incident energy or protective equipment level, and the assessment date.
Is the 110.24 label the same as the arc flash label?
No. The 110.24 marking records the available fault current for checking equipment ratings. The 110.16 marking warns a worker about arc flash. They use related data but they are separate requirements, and one does not replace the other.