A low-voltage switchboard is designed from its application: the use decides the continuity it must provide, the degree of protection, the type of loads, the backup source and the special rules that apply.
Short answer
Switchboards by application share the same product standard, IEC 61439, but the use decides four things: the continuity it must provide, the environment and degree of protection, the type of loads (motors, electronics, lighting) and the additional rules that apply to the place. With those four answers the specification is defined.
What is common to any switchboard design is in LV switchboard and MCC.
What changes with the use
| Use | What changes most in the switchboard | Where to go deeper |
|---|---|---|
| Hospitals | Dual source with transfer, backup within a set time, UPS for life support and IT system in operating rooms | RETIE in hospital installations |
| Buildings | Many sub-panels, metering per unit, selectivity between levels and space in technical rooms | AC station-service switchboard |
| Data centers | Redundant supply, metering per circuit and maintenance without stopping the load | Automatic source transfer |
| Water and pumping | Motor starting, drives, dry-run protection and standby units | Pumping with a drive |
| Mining | Dust, vibration and altitude; high mechanical protection and quick maintenance | MCC |
| Agro-industry | Humidity, washdown and corrosion; irrigation and refrigeration motors | IP codes |
| Solar plants | DC and AC combined, protection and communications | RETIE in PV installations |
| EV charging stations | Residual-current protection, surge protection and charger grounding | Protection of a charging station |
| Oil, gas and hazardous areas | Equipment certified for the zone and group, or the switchboard outside the area | Hazardous areas under RETIE |
| Industry and manufacturing | Mix of motors, drives and automation; future growth | Soft starter or drive |
For the relevant codes by country, the references are the NEC (Article 517 for health care facilities, Articles 500 to 505 for hazardous locations, Article 625 for EV charging and Articles 690 and 705 for PV and interconnected sources) and the national equivalents.
A single switchboard rarely meets two different uses. A hospital switchboard incorporates transfer and insulation monitoring that a pumping switchboard does not need, and a pumping one carries starters and drives that a building switchboard may not have. That is why the specification names the use and not only the current.
How to choose the starting point
- Is there an explosive atmosphere from gases, vapors or dust?
- Yes: Hazardous area: equipment certified for the zone, or the switchboard outside the area
- No: Does the load require continuity of supply for safety of people or the process?
- Yes: Dual source with transfer and backup; IT system if there are patients
- No: Distribution switchboard or MCC according to the loads and environment
The answer does not replace the design: it defines the switchboard family. Details such as rated current and short-circuit rating come from the calculation and are written in data to specify an LV switchboard.
Worked example: three pumps, two running
A pumping station with three 55 kW motors at 440 V, two running and one standby. An efficiency of 0.93 and a power factor of 0.88 are assumed (example assumptions; use nameplate values).
- Current of each motor: I = P ÷ (√3 × V × η × cos φ) = 55,000 ÷ (1.732 × 440 × 0.93 × 0.88) = 55,000 ÷ 623.7 = 88 A.
- All three at once: 3 × 88 = 264 A.
- Normal operation, two pumps: 2 × 88 = 176 A.
- Outgoing circuit with a 100 A breaker: the rule in clause 5.4 of IEC 61439-1, RDF × rated current of the circuit ≥ assumed load, requires RDF ≥ 88 ÷ 100 = 0.88 on each outgoing circuit.
The difference between 264 A and 176 A is what changes the sizing of the busbars and the incomer. The specification must say that the third pump only replaces one, and must ask the manufacturer to confirm how the design verification handles that condition. If it is not declared, the switchboard is designed for the worst possible combination. See rated diversity factor (RDF).
What data the owner must give, by use
Without these data, the manufacturer fills the gaps with its own standard. The general template is in data to specify a switchboard; depending on the use, add:
| Use | Data to add |
|---|---|
| Hospitals | Critical areas, transfer time, life-support loads, earthing scheme |
| Buildings | Number of units, metering scheme and technical rooms available |
| Pumping | Power and number of pumps, how many run at once, type of starting |
| Mining and outdoors | Altitude, dust, temperature, vibration and access for maintenance |
| Hazardous areas | Classification drawing with zone, group and temperature class |
| Solar and charging | DC voltages, number of inputs and utility requirements |
At higher altitude, air loses cooling and insulating capacity; the guide on special service conditions of a switchboard explains how it is declared.
Application checklist
- Use and environment described: indoor, outdoor, dust, humidity, altitude.
- Continuity required: dual source, backup, transfer time.
- Type of loads: motors, drives, sensitive electronics, lighting.
- Special rules of the place: health care, hazardous area, solar, EV charging.
- Suitable IP degree and impact resistance.
- Simultaneous loads and diversity factor declared.
- Room to grow and to maintain without stopping the process.
How we help
We provide the design engineering of switchboards for each application, from the single-line diagram and the ratings to the specification package: contact us with the use, the loads and the environment, and we will propose the design.
Related guides
- LV switchboard and MCC
- Data to specify an LV switchboard
- Hospital installations under RETIE
- Special service conditions of a switchboard
- Certified or uncertified switchboard
- Switchboard manufacturing and handover
- LV Switchboard Standards: What Applies and When
- Types of Electrical Panels: How to Choose by Load
- Parts of an Electrical Panel: What It Holds and Why
- Electrical Panel Design: From Data to Drawings
- Switchboard Maintenance: Plan, Tasks and Intervals
- Recloser Installation: Design Checklist and Key Decisions
- How to Specify an LV Switchboard Before Ordering
References
- IEC 61439-1 and IEC 61439-2, low-voltage switchgear and controlgear assemblies; the rated diversity factor is covered in IEC 61439-1.
- Ministerio de Minas y Energía, RETIE (Resolution 40117 of 2024, amended by Resolution 40284 of 2026), numerals 3.28.3.1 and 3.28.3.2.
- NFPA 70, National Electrical Code, Articles 500 to 505, 517, 625, 690 and 705.
Frequently asked questions
Why does the application change the switchboard design?
Because the use defines what the switchboard must guarantee: continuity of supply, protection of people, working environment and type of loads. A hospital switchboard, a pumping switchboard and one for a hazardous area can start from the same product standard, IEC 61439, but the specification and the additional requirements are different.
Does a hospital switchboard need anything special?
Yes. Codes treat medical facilities as special installations: two independent sources with automatic transfer, an alternate source that picks up within a set time, UPS for life-support equipment and an isolated IT system with insulation monitoring in operating rooms and critical care. In Colombia the RETIE sets the alternate source at 10 s.
What is the rated diversity factor (RDF) and why does it matter in a specification?
It is the share of the rated current of each outgoing circuit that the assembly accepts in continuous duty when several circuits are loaded at the same time. The assembly manufacturer assigns it and the user states the assumed load of each outgoing circuit. If the specification does not say how the loads operate, the design cannot be matched to reality.