ISO 8528-3 supplements IEC 60034-1 for the alternator of a generating set. It defines the basic continuous rating BR (duty S1) and the peak continuous rating PR (duty S10), which allows higher temperature at the cost of faster insulation ageing. It sets by performance class the steady-state and load-step voltage limits, the reactive droop for parallel operation and the unbalanced load capability.
Short answer
The alternator turns the engine’s rotation into electrical energy. ISO 8528-3 sets its characteristics under the control of its voltage regulator when it works in a generating set, and supplements IEC 60034-1. It defines two ratings: basic continuous (BR) and peak continuous (PR). It also sets, for each performance class G1 to G4, the steady-state voltage deviation, the dip under a load step and the recovery time. For parallel operation, it asks for a reactive droop that shares the kvar.
Basic (BR) and peak (PR) ratings
ISO 8528-3:2005, clause 5, asks to specify the alternator with one of two duties of IEC 60034-1:
- Duty S1, continuous. Its maximum continuous output is called basic continuous rating, BR. The alternator must deliver it over the whole range of operating conditions with a total temperature of 40 °C plus the temperature rise set by IEC 60034-1 (clause 6.1).
- Duty S10, with discrete constant loads. It also allows a peak continuous rating, PR. At PR the alternator may run hotter.
The total temperature increase allowed at PR depends on thermal class and size:
| Thermal class | Below 5 MVA | 5 MVA or more |
|---|---|---|
| B or F | +20 °C | +15 °C |
| H | +25 °C | +20 °C |
Values from Table 2 of ISO 8528-3:2005 for classes B, F and H; wording and format by Tiza Group.
With ambient below 10 °C, that increase is reduced by 1 °C for each degree below 10 °C.
Running hotter costs life. The note in clause 6.2 says that at PR the insulation ages two to six times faster than at BR: 1 h at PR roughly equals 2 h to 6 h at BR. That is why the manufacturer must state the relative thermal life expectancy factor, TL, and mark it on the nameplate.
How to read the nameplate (clause 14). In S1 the output is followed by “BR”. In S10 the plate shows BR plus the peak output with “PR”, the maximum running time per year (500 h or 200 h, which correspond to the LTP and ESP categories of the set) and the TL factor. The set categories are explained in COP, PRP, LTP and ESP ratings.
Voltage: steady state and load steps
The standard defines several voltage quantities (Table 1):
- Steady-state voltage deviation, δUst: how much the steady voltage changes between no load and rated load, including temperature.
- Transient dip, δU⁻dyn: how much the voltage drops when rated load is switched on suddenly, with the alternator at rated speed and voltage.
- Transient rise, δU⁺dyn: how much it rises on sudden rejection of rated load.
- Recovery time, tU: from the load change until the voltage returns to and stays within the tolerance band.
- Voltage unbalance, δU2,0: negative or zero sequence component relative to positive sequence, at no load.
Clause 13 sets limits by class. For example, for G2 and G3:
| Quantity | G2 | G3 |
|---|---|---|
| Steady-state deviation | ±2.5 % | ±1 % |
| Transient dip on switching rated load | −24 % | −18 % |
| Recovery time | < 1.5 s | < 1.5 s |
Values from Table 3 of ISO 8528-3:2005; wording and format by Tiza Group. In G4 the values are agreed between manufacturer and customer.
Three conditions go with those values. They apply to alternator, exciter and regulator at constant rated speed, starting from ambient temperature. They assume rated apparent power with a constant impedance load. And the engine speed regulation can change them: the performance of the complete set does not come from the alternator data alone (Annex A).
The same table carries a useful warning: asking for a dip or recovery time smaller than needed can lead to a much larger alternator and a higher fault level.
Our own example: reading a voltage dip
A 480 V alternator delivers 360 V at the lowest point of the dip when its rated load is switched on.
- δU⁻dyn = (360 − 480) / 480 × 100 = −25 %.
- For G2 the limit is −24 %: it fails by a small margin. For G1, whose limit is −30 %, it would pass.
Before concluding, check that the test was done as the standard requires: alternator at no load and rated voltage before the step, linear impedance load and constant speed. If the engine slowed down during the step, part of that dip belongs to the engine. The voltage regulator acting at that moment is explained in generator excitation and AVR.
Parallel operation: reactive droop
When the alternator runs in parallel with other sets or another source, clause 9 asks for means to ensure stable operation and correct sharing of reactive power. The usual way is to feed the regulator a reactive current signal, which creates a voltage droop for reactive loads.
The droop grade, δQCC, is the difference between no-load voltage and the voltage at rated current at zero power factor lagging, as a percentage of rated voltage. The standard recommends it be below 8 %.
Our own example. A 480 V alternator has 480 V at no load and 462 V at its rated purely reactive current: δQCC = (480 − 462) / 480 = 3.75 %. It is within the recommendation.
The standard adds two practical notes. Unity power factor loads produce virtually no droop. And if the neutrals of paralleled sets are connected directly together, circulating currents may flow, especially third harmonic. Earthing of those neutrals is covered in earthing of industrial generators.
Special loads
- Unbalanced load (10.2). An alternator of up to 1000 kVA that will feed line-to-neutral loads must withstand continuously a negative sequence current of up to 10 % of rated current, or another agreed value. Others follow IEC 60034-1.
- Sustained short-circuit current (10.3). On a short circuit, a minimum current is normally needed for long enough for selective protection to operate. It is not needed if selectivity is achieved another way.
- Telephone harmonic factor (10.5). IEC 60034-1 applies; the standard adds 5 % for alternators from 62 kVA to 300 kVA and 8 % for those below 62.5 kVA.
- Resonance in parallel (11). With slow engines, from 100 min⁻¹ to 180 min⁻¹, torque irregularity may coincide with the electrical natural frequency, which usually lies between 1 Hz and 3 Hz.
The protection functions that look after the alternator, such as negative sequence, are explained in generating set protection.
Typical mistakes
- Buying at PR and operating as if it were BR. Hours at PR use up insulation faster.
- Measuring the voltage dip with the wrong load or initial conditions. The result cannot be compared with the standard.
- Paralleling alternators without reactive droop or compensation links. One takes the other’s kvar.
- Joining the neutrals of several sets without studying third harmonic currents.
We support you with your generating set
At Tiza Group we test the alternator and its protection as part of set commissioning: insulation resistance, load steps, regulator response and reactive sharing in parallel, in medium, high and extra-high voltage substations and in industry. Learn about our testing and commissioning service or write to us for a quote.
Related guides
- Generating set ratings: COP, PRP, LTP and ESP
- Generating set performance classes G1 to G4
- Generating set engine to ISO 8528-2
- Generator excitation and AVR
- Generator excitation systems: types and response
- Generating set protection
- Electrical maintenance of a synchronous generator
References
- ISO 8528-3:2005, Reciprocating internal combustion engine driven alternating current generating sets — Part 3: Alternating current generators for generating sets, second edition, clauses 5, 6, 9, 10, 11, 13 and 14, Tables 1, 2 and 3 and Annex A. The current edition is ISO 8528-3:2020.
- IEC 60034-1, Rotating electrical machines — Part 1: Rating and performance, for duties S1 and S10 and temperature rise limits.
Frequently asked questions
What is the difference between the BR and PR rating of an alternator?
BR is the maximum continuous output in duty S1, with the temperatures of IEC 60034-1. PR is a higher output in duty S10, with higher temperatures according to the thermal class. Running at PR ages the insulation faster: the note in ISO 8528-3:2005, clause 6.2, states that 1 h at PR is roughly equal to 2 h to 6 h at BR.
What voltage dip can I expect when switching load onto a G2 alternator?
ISO 8528-3:2005, Table 3, sets for G2 a transient dip of up to 24 % when rated load is switched on, with a recovery time below 1.5 s. Those values assume the alternator at rated speed, a constant impedance load and the agreed power factor; the complete set may give other values because of the engine response.
What is the reactive droop of the regulator for?
It lets two paralleled alternators share reactive power correctly. The regulator lowers the voltage slightly as reactive current rises. ISO 8528-3:2005, clause 9, recommends that this droop be below 8 %.