The direct-on-line starter is the simplest motor feeder of a switchboard: protection, contactor and overload relay, with pushbutton control. In the switchboard what matters is the consistent selection of the three, their order on the mounting plate, the control wiring and the inrush when several motors start together.
Short answer
A direct-on-line starter in a switchboard is a motor feeder made of a short-circuit protective device, a contactor and an overload relay, controlled by pushbuttons or by a control system command. Inside the switchboard, quality is decided by the consistent selection of the three devices for the same motor, the order on the mounting plate, the control wiring and the inrush current when several motors start at once.
The power and control schematic, and why direct starting is the simplest method, are in direct-on-line motor starting. Its place among the other switchboards is in the parent guide, types of electrical switchboards.
Components and what is chosen
| Component | Function | Chosen by |
|---|---|---|
| Short-circuit protection | Clears the fault in the motor circuit | Rated current, breaking capacity, coordination type |
| Contactor | Makes and breaks the motor current | Utilization category AC-3 and motor current |
| Overload relay | Protects against motor heating | Range including nameplate current, and trip class |
| Motor circuit breaker | Combines protection and overload in one device | Setting range and breaking capacity |
| Control transformer or supply | Feeds coils and signaling | Coil power and control voltage |
| Pushbuttons and pilot lights | Start, stop and signaling | Duty and door protection degree |
| Terminals | Connection of motor and field cables | Cable cross-section |
Category AC-3 corresponds to starting squirrel-cage motors and switching them off while running; see contactor utilization categories. The motor circuit breaker is covered in motor circuit breaker: how to select it. Coordination between protection and contactor under short circuit is in type 1 and type 2 coordination.
How it is laid out on the plate
- Vertical order from top to bottom: protection, contactor, overload relay and output terminals. Power flows in one direction and cables do not cross.
- Separation of power and control: control circuits run in separate ducts or apart from the power circuits to reduce interference and ease maintenance.
- Free space around each device: the heat dissipated by contactor and relay must be able to leave the enclosure; the manufacturer’s clearances are respected.
- Identification: every wire, terminal and device carries the same mark as the diagram.
- Protected control supply: its own breaker or fuse for the control circuit, so a fault in the control circuit is cleared by its own protection and not by the motor protection.
- Stop on a normally closed contact: if the stop pushbutton wire is cut, the motor stops.
- Earth: the motor and the enclosure are connected to the protective circuit, with continuity verified.
When the switchboard is an MCC, the same rules apply per unit; see conventional low-voltage MCC.
Worked example: three motors on the same switchboard
Assumed data, not from a real project: three 400 V motors with nameplate currents of 11 A, 15 A and 22 A. A starting current of 7 times rated is assumed.
| Motor | Rated current | Starting current (7 ×) |
|---|---|---|
| M1 | 11 A | 77 A |
| M2 | 15 A | 105 A |
| M3 | 22 A | 154 A |
| Sum | 48 A | 336 A |
- Simultaneous start. If all three start together, the peak is the sum, 336 A, for the acceleration time.
- Staggered start, largest first. M3 starts (154 A); then M2 with M3 running (22 + 105 = 127 A); finally M1 with the other two running (22 + 15 + 77 = 114 A). The maximum peak is 154 A, 54 % lower than the simultaneous case.
- Staggered start, smallest first. The last step adds 11 + 15 + 154 = 180 A. That is why the largest motor should start first.
- Relay setting. Each relay is set to the nameplate current of its motor (11, 15 and 22 A) and its trip class is checked so the motor can start without tripping.
The difference between 336 A and 154 A decides whether the feeder and the source can take the start. A delay of a few seconds between starts, programmed in the control, is cheap and avoids the peak. The voltage drop at those instants is analyzed in starting large motors and voltage drop.
Tests before the first run
Before energizing, the wiring is checked against the diagram, terminal torque is verified, the control circuit is tested with the motor disconnected, and the insulation of the motor and its cable is measured. With the motor released from its load, the first run confirms rotation direction and, with a clamp meter, the running current against the nameplate. See electrical tests on low-voltage motors.
Checklist
- Protection, contactor and relay correspond to the same motor and voltage.
- The contactor is AC-3 for the motor current.
- The relay is set to the nameplate current, not to the top of its range.
- Short-circuit coordination is of the type the project asks for.
- Power and control are separated and labeled.
- The stop is normally closed.
- The control has its own protection.
- The start of several motors is staggered if the feeder requires it.
- Insulation and phase sequence were measured before the first run.
Common mistakes
- Wide-range relay with the motor at the low end, which reduces protection accuracy.
- Contactor undersized for duty with many starts; see motor starts per hour.
- Contactor coil of a different voltage or frequency from the control supply.
- Holding contact wired to the wrong terminals.
- Devices mounted tight with no room to dissipate heat.
How we help
We design the starter feeders of your switchboard: selection, coordination, layout and control diagrams, delivered remotely. See engineering design and studies.
Related guides
- Types of electrical switchboards: which to choose for your load
- Direct-on-line motor starting: power and control
- Star-delta starter in a switchboard
- Conventional low-voltage MCC
- Motor circuit breaker: how to select it
- Low-voltage motor protection relay
References
- IEC 60947-4-1, Electromechanical contactors and motor-starters, edition 5 (2023): utilization categories and coordination types.
- IEC 61439-1 and IEC 61439-2, Low-voltage switchgear and controlgear assemblies, 2020 edition.
Frequently asked questions
What does a direct-on-line starter contain inside the switchboard?
A short-circuit protective device, a contactor, an overload relay or a motor circuit breaker combining protection and overload, output terminals to the motor and the control circuit with its supply. The components are chosen for the same motor and the same utilization category.
When is a motor circuit breaker better than a separate breaker and relay?
A motor circuit breaker combines magnetic and thermal protection in one device, saving space and wiring on small motors. For larger motors or special settings, a breaker plus overload relay or a motor protection relay is used.
Which standard governs starter coordination?
IEC 60947-4-1 covers electromechanical contactors and motor-starters and defines coordination types 1 and 2 against short circuit. Built into a switchboard, the assembly is verified under IEC 61439.