Tiza Group

Home / Guides / Grid, regulation and connection / Technical standards

Technical standards

Grid, regulation and connection

BT/MT/AT/EATStandards for Electrical Testing in Substations: GuideWhich IEC, IEEE, NETA, CIGRE and local-code standards apply to primary equipment, protection, FAT/SAT and communications testing, and what each one covers.Lightning Current: Flash Types and Design ParametersDownward and upward lightning flashes, 10/350, 1/200 and 0.25/100 µs impulses, charge and specific energy: IEC 62305-1 parameters for protection design.BT/MT/AT/EATCommissioning Standards: FAT and SAT for SubstationsStandards for substation commissioning and FAT/SAT testing: IEC 61850-4 and IEC 61850-10, IEC 62381, IEC 61936-1, IEEE C37.233, NETA and CIGRE guidance.MT/AT/EATIEEE C37.102: AC Generator Protection GuideWhat IEEE C37.102 is, which generators it covers, how it is organized and which clause covers each protection, with links to the guide for each function.BT/MT/AT/EATStandards for Protection Testing and Secondary InjectionWhich standards apply to relay testing: IEC 60255 family, IEEE C37.90, C37.2, C37 application guides, IEEE C37.233, COMTRADE and teleprotection testing.BT/MT/AT/EATStandards for Testing Primary Substation EquipmentIEC, IEEE and NETA standards for testing transformers, CTs and VTs, breakers, arresters, cables, bushings, SF6, grounding and batteries, with edition.BT/MTIEEE C37.96: AC Motor Protection Guide ExplainedWhat IEEE C37.96-2000 covers, how it is organized and which protective function answers each risk to an AC motor, with a map of ANSI device numbers.BT/MTIEEE 242 Buff Book: Industrial Protection and CoordinationWhat IEEE 242-2001, the Buff Book, covers, how its 16 chapters are organized and which part of industrial protection each chapter solves in practice.IEC 62305 Lightning Protection: What Each Part CoversIEC 62305 has four parts: principles, risk, physical damage and electronic systems. What each one covers, the order of use and what each one leaves out.

Other topics in this section

WhatsApp