Home / Guides / Grid, regulation and connection / Smart grids
Smart grids
Grid, regulation and connection
Smart Grid Components: Layers and EquipmentField devices, advanced metering, communications, management systems and distributed resources: each smart grid layer and what it demands of the rest.What Is a Smart Grid and How Does It Work?A smart grid adds sensors, communications and control to the power grid. How it differs from a conventional grid and what it needs to operate reliably.Microgrids: What They Are and How They OperateWhat a microgrid is, how it differs from a plant with backup, how it runs grid-connected or islanded and what its control and protection must solve.SCADA vs ADMS vs DERMS: What Each One DoesDifferences between SCADA, ADMS and DERMS: what data they use, what they decide, how they relate and which one a utility or a plant needs in practice.Measurable Benefits of a Smart GridWhat a smart grid improves, which indicator measures each benefit, and which baseline is needed to prove the results before and after investing in it.Digital Twin of a Power Grid: What It Is and NeedsWhat a power grid digital twin is, how it differs from a power flow study or SCADA, what data it needs, what it is used for and its practical limits.