Home / Guides / Grid, regulation and connection / Smart metering
Smart metering
Grid, regulation and connection
BTRemote Reading, Disconnect and Reconnect with Smart MetersHow remote reading and remote disconnect and reconnect work in an advanced meter, who issues the command and which controls prevent operating errors.BT/MTSmart Metering (AMI): What It Is and How It WorksWhat advanced metering infrastructure (AMI) is, how it differs from a traditional energy meter and which parts make up the system, from meter to head-end.BT/MTAMI Architecture: Meter, Concentrator and Central SystemThe layers of an advanced metering system: meter, data concentrator, head-end system (HES), meter data management (MDM) and how they feed billing.BT/MTAMI Communications: PLC, RF Mesh and CellularHow advanced meters communicate: power line (PLC), RF mesh and cellular. How each one works and how to choose for a given service area and their limits.BT/MTSmart Metering Data and AnalyticsWhat data an advanced meter delivers, how it is validated and stored, and what analysis it enables: load curves, balance, anomalies and service quality.BT/MTHow to Implement a Smart Metering ProjectPhases of an AMI project: diagnosis, design, pilot, rollout and operation, with the tests of each stage and what Colombian rules usually require of them.BT/MTAMI Project Cost-Benefit AnalysisHow to evaluate whether a smart metering project pays off: costs, benefits, present value and benefit-cost ratio over a long analysis horizon.BT/MTNon-Technical Losses: Causes and How to Reduce ThemWhat non-technical energy losses are, where they come from, how a transformer-level energy balance locates them and which measures reduce them in practice.BT/MTEnergy Balance in a Distribution NetworkHow to do the energy balance of a circuit or transformer: what to measure, how to separate technical and non-technical losses and how to read the result.BT/MTDLMS/COSEM: The Essentials of the Meter ProtocolWhat DLMS/COSEM is, how it models a meter with objects and OBIS codes, who is client and server and what to check step by step. We configure it remotely.